Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.8 LAccepted-AOC | L1 | Accepted-AOC Lowest rate | |
| 2 | L2₹4.1 L+₹33,370 (8.84%)Rejected-AOC P O NEMMARA PALAKKAD DIST PIN 678 508 | PALAKKAD | KERALA | 678508 | L2 | Rejected-AOC Highest rate |
| Sl No | Description | Qty | Unit | DEVADASAN.V L2 | MOHAMMED BASITH L1 |
|---|---|---|---|---|---|
| 1.00 | Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges:In cement mortar | 32 | M3 | 2,346.27 ₹75,080.64 | 2,155.62 ₹68,979.71 Lowest |
| 2.00 | Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan),including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed,within a lead of 50 m.All kinds of soil | 18 | M3 | 332.02 ₹5,976.36 | 305.04 ₹5,490.77 Lowest |
| 3.00 | DR with Departmental. Stone - DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course using departmental rubble including packing to compactness
to lines and levels, labour charges etc. complete as per direction of Departmental officers at site | 16 | M3 | 1,583.76 ₹25,340.16 | 1,455.07 ₹23,281.06 Lowest |
| 4.00 | DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site | 18 | M3 | 3,685.96 ₹66,347.28 | 3,386.45 ₹60,956.17 Lowest |
| 5.00 | Random rubble masonry with hard stone in superstructure above plinth level and upto floor five level, including leveling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) at window sills, ceiling level and the like.Cement mortar 1:6 (1 cement : 6 coarse sand) | 10.62 | M3 | 9,578.4 ₹1,01,760.92 | 8,800.09 ₹93,492.11 Lowest |
| 6.00 | Centering and shuttering including strutting, etc. and removal of form for:Lintels,beams, plinth beams, girders bressumers and cantilevers | 15 | M2 | 704.14 ₹10,562.1 | 646.92 ₹9,703.83 Lowest |
| 7.00 | Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelHard drawn steel wire fabric | 281.25 | Kg | 108.94 ₹30,639.38 | 100.09 ₹28,150.15 Lowest |
| 8.00 | Providing and laying in position specified grade of reinforced cement concrete,excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | 3.75 | M3 | 9,681.13 ₹36,304.24 | 8,894.48 ₹33,354.29 Lowest |
| 9.00 | Pointing on stone work with cement mortar 1:3 ( 1 cement : 3 fine sand):Flush/ Ruled pointing | 158.72 | M2 | 369.63 ₹58,667.67 | 339.6 ₹53,901.08 Lowest |
Tender Value
₹5.3 L
EMD Value
₹13,200
Closing Date
16 Oct 2025, 5:00 pmClosed
Preveen.P,Divisional Forest Officer,Nemmara
Preveen.P, Divisional Forest Officer, Nemmara Ayinamppadam Palakkad 678508
Cost of reconstruction of Compound Wall at back side of the DFO Office Compound, Ayinamppadam, Nemmara under Nelliyampathy Range during 2025-26
2025_FD_807423_1
KFDDO/55553/2025-DFONMR/D
Open Tender
Civil Works - Others
Item Wise
90 days
Ayinamppadam
Please refer the E-Tender Notification and Condition
9 documents required · 9 mandatory
₹1,100
₹13,200
10 Nov 2025
9 Oct 2025
17 Oct 2025
9 Oct 2025
16 Oct 2025
9 Oct 2025
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .