| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹10.0 LAccepted-AOC CHANDRA LOK COLONY WARD NO 1 NAVALPURA KHURJA BULANDSHAHR | HATHRAS | UTTAR PRADESH | 203001 | ₹10.0 L | 1 | Accepted-AOC ACCEPT |
| 2 | 2₹10.9 L+₹91,965 (9.23%)Rejected-Finance | ₹10.9 L+₹91,965 (9.23%) | 2 | Rejected-Finance 2 |
| 3 | 3₹10.9 L+₹93,611 (9.40%)Rejected-Finance H NO 116 GOVIND VIHAR COLONY JANTA ROAD SAHARANPUR | ₹10.9 L+₹93,611 (9.40%) | 3 | Rejected-Finance 3 |
| 4 | 4₹10.9 L+₹94,595 (9.50%)Rejected-Finance A 4 GALI NO 1 ANANDPURI MATHURA | MATHURA | MATHURA | UTTAR PRADESH | ₹10.9 L+₹94,595 (9.50%) | 4 | Rejected-Finance 4 |
| 5 | 5₹11.4 L+₹1.4 L (14.3%)Rejected-Finance ALIGARH | UTTAR PRADESH | 202001 | ₹11.4 L+₹1.4 L (14.3%) | 5 | Rejected-Finance 5 |
| Sl No | Description | Qty | Unit | ARTIST BRO L8 | NARENDRA KUMAR SHARMA L1 | DEVENDRA KUMAR SHARMA L5 | M/S PRADEEP ASSOCIATES L4 | M/S SHREE JEE CONSTRUCTIONS L9 | Mahesh Chandra Sharma L2 | yogesh Kumar L3 | Rajesh Kumar Sharma L10 | M/S RINKU CONTRACTOR L11 | GARGI CONSTRUCTION L6 | SHIV GANGA INFRATECH L7 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Earth work in foundation in all type of soil (loam clay or sand) including lift upto 1.5M and lead upto 30M including back filling, Watering and ramming of excavated earth into the structure and the sides of foundation trenches or into the plinth with removal and disposal of surplus earth up to a distance of 30m from the foundation trenches. all specified and as directed by Engineer in charge. | 41 | Cum | 80 ₹3,280 | 25 ₹1,025 Lowest | 50 ₹2,050 | 50 ₹2,050 | 50 ₹2,050 | 30 ₹1,230 | 70 ₹2,870 | 40 ₹1,640 | 80 ₹3,280 | 90 ₹3,690 | 70 ₹2,870 |
| 2.00 | Providing and laying Cement concrete of 1:3:6 with approved quality of coarse sand of F.M. more than 2.00 and 20 mm graded coarse aggregate including cost cost of all materials.labour charges,curing work , T&P ,taxes etc. but excluding shuttering & its labour charges required for proper complition of work in all condition of site.all specified and as directed by Engineer in charge. | 65 | Cum | 4,000 ₹2,60,000 | 3,950 ₹2,56,750 Lowest | 4,500 ₹2,92,500 | 4,500 ₹2,92,500 | 5,000 ₹3,25,000 | 4,000 ₹2,60,000 | 4,142 ₹2,69,230 | 5,500 ₹3,57,500 | 6,200 ₹4,03,000 | 5,100 ₹3,31,500 | 4,200 ₹2,73,000 |
| 3.00 | M-150 class brick work in Superstructur in 1:4 cement mortar using coarse sand including cost of all materials, labour, T&P, curing, taxes etc involved for proper completion of work. all specified and as directed by Engineer in charge. | 47 | Cum | 5,300 ₹2,49,100 | 4,950 ₹2,32,650 | 5,500 ₹2,58,500 | 4,000 ₹1,88,000 | 5,500 ₹2,58,500 | 5,000 ₹2,35,000 | 3,802 ₹1,78,694 Lowest | 5,500 ₹2,58,500 | 4,530 ₹2,12,910 | 5,000 ₹2,35,000 | 4,950 ₹2,32,650 |
| 4.00 | Providing 12 mm thick Cement plaster in 1:4 Cement mortar including cost of all material, Labour, T&P , taxes etc. all specified and as directed by Engineer in charge. | 192 | Sqm. | 150 ₹28,800 | 140 ₹26,880 | 180 ₹34,560 | 150 ₹28,800 | 500 ₹96,000 | 150 ₹28,800 | 138.5 ₹26,592 | 150 ₹28,800 | 300 ₹57,600 | 170 ₹32,640 | 120 ₹23,040 Lowest |
| 5.00 | Earth work in cutting or in imbankment by power transported earth with a lead beyond 1.00 KM including excavation loading, unloading, mechanical compaction, dressing and all lifts complete excluding royalty. all specified and as directed by Engineer in charge. | 3,175 | Cum | 100 ₹3,17,500 | 56 ₹1,77,800 | 53 ₹1,68,275 | 70 ₹2,22,250 | 50 ₹1,58,750 | 48.8 ₹1,54,940 Lowest | 104 ₹3,30,200 | 120 ₹3,81,000 | 65 ₹2,06,375 | 65 ₹2,06,375 | 130 ₹4,12,750 |
| 6.00 | Providing and laying I Shaped Interlocking tiles rubber moulded 80mm thick Precast Cement Concrete having compressive strength not less than 30Mpa in Gray Colour in patches i/c cost of all material, labour T&P etc. complete. all specified and as directed by Engineer in charge. | 510 | Sqm. | 700 ₹3,57,000 | 590 ₹3,00,900 | 750 ₹3,82,500 | 700 ₹3,57,000 | 800 ₹4,08,000 | 800 ₹4,08,000 | 553 ₹2,82,030 | 600 ₹3,06,000 | 1,000 ₹5,10,000 | 750 ₹3,82,500 | 520 ₹2,65,200 Lowest |
Tender Value
₹17 L
EMD Value
₹34,000
Closing Date
5 Dec 2025, 12:00 pmClosed
EXECUTIVE ENGINEER
U.M.B.D.G.C. KHURJA
CONSTRUCTION OF Boundry wall
2025_UPIDC_1094344_5
12/EE/2025-26
Open Tender
Civil Works
Item Rate
60 days
U.M.B.D.G.C. KHURJA
Please refer Tender documents.
2 documents required · 2 mandatory
₹766
₹34,000
23 Dec 2025
28 Nov 2025
5 Dec 2025
28 Nov 2025
5 Dec 2025
28 Nov 2025
Amount
Earth work in foundation in all type of soil (loam clay or sand) including lift upto 1.5M and lead upto 30M including back filling, Watering and ramming of excavated earth into the structure and the sides of foundation trenches or into the plinth with removal and disposal of surplus earth up to a distance of 30m from the foundation trenches. all specified and as directed by Engineer in charge.
Providing and laying Cement concrete of 1:3:6 with approved quality of coarse sand of F.M. more than 2.00 and 20 mm graded coarse aggregate including cost cost of all materials.labour charges,curing work , T&P ,taxes etc. but excluding shuttering & its labour charges required for proper complition of work in all condition of site.all specified and as directed by Engineer in charge.
M-150 class brick work in Superstructur in 1:4 cement mortar using coarse sand including cost of all materials, labour, T&P, curing, taxes etc involved for proper completion of work. all specified and as directed by Engineer in charge.
Providing 12 mm thick Cement plaster in 1:4 Cement mortar including cost of all material, Labour, T&P , taxes etc. all specified and as directed by Engineer in charge.
Earth work in cutting or in imbankment by power transported earth with a lead beyond 1.00 KM including excavation loading, unloading, mechanical compaction, dressing and all lifts complete excluding royalty. all specified and as directed by Engineer in charge.
Providing and laying I Shaped Interlocking tiles rubber moulded 80mm thick Precast Cement Concrete having compressive strength not less than 30Mpa in Gray Colour in patches i/c cost of all material, labour T&P etc. complete. all specified and as directed by Engineer in charge.
Mahesh Chandra Sharma (BID ID -5715216)
yogesh Kumar (BID ID -5723918)
M/S PRADEEP ASSOCIATES (BID ID -5721509)
DEVENDRA KUMAR SHARMA (BID ID -5721226)
GARGI CONSTRUCTION (BID ID -5724246)
SHIV GANGA INFRATECH (BID ID -5720871)
ARTIST BRO (BID ID -5719798)
M/S SHREE JEE CONSTRUCTIONS (BID ID -5721447)
Rajesh Kumar Sharma (BID ID -5722909)
M/S RINKU CONTRACTOR (BID ID -5716815)
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.24 MB
BOQ_2012177.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .