Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹3.0 LAccepted-AOC N A | ₹3.0 L | 1 | Accepted-AOC l1 |
| 2 | Rejected-Technical | - | - | Rejected-Technical L2 |
| Sl No | Description | Qty | Unit | Basheer P C L1 | T KUNHIRAMAN L2 |
|---|---|---|---|---|---|
| 1.00detailed estimate | |||||
| 1.00 | 3.15.1:Compacting Original Ground <br> (i) Compacting original ground supporting embankment <br> Loosening, Levelling and Compacting original ground supporting embankment to facilitate placement of first layer of embankment, scarified to a depth of 150 mm, mixed with water at OMC and then compacted by rolling so as to achieve minimum dry density as given in Tables 300.1 and 300.2 for embankment construction as per Technical Specification Clause 301.4.1. | 41.85 | cum | 15.04 ₹629.42 | 15.79 ₹660.81 |
| 1.00 | 4.1.A.1:Granular Sub-base with Well Graded Material (Table 400.1) (A) By Mix in Place Method Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. (i) For Grading I Material | 13.95 | cum | 3,124.47 ₹43,586.36 | 3,280.69 ₹45,765.63 |
| 1.00 | 4.9:Wet Mix Macadam Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406. By Mechanical Means with 1 km lead | 41.85 | cum | 3,504.6 ₹1.5 L | 3,679.83 ₹1.5 L |
| 1.00 | 75.5.1.1pb:Prime Coat - Low porosity - With Packed Bitumen Rates Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502 | 279 | sqm | 80.21 ₹22,378.59 | 84.22 ₹23,497.38 |
| 1.00 | 75.5.2.3pb:Tack Coat - With Packed Bitumen Rates Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503. | 279 | sqm | 18.75 ₹5,231.25 | 19.96 ₹5,568.84 |
| 1.01 | 75.5.11.1.A.2pb:Mix Seal Surfacing - Manual Means - Type A - Bitumen S-65 - Packed Bitumen Rates Providing, laying and rolling of close-graded premix surfacing material of 20 mm thickness composed of 11.2 mm to 0.9 mm (Type-A) or 13.2 mm to 0.9 mm (Type-B) aggregates using penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 8-10 kN static roller and finishing to required level and grades as per Technical Specification Clause 509 By Manual Means Type A (II) Bitumen (S-65) | 279 | sqm | 278.43 ₹77,681.97 | 292.35 ₹81,565.65 |
Tender Value
₹3.0 L
EMD Value
₹7,404
Closing Date
16 Feb 2026, 11:00 amClosed
SHEELA P R
ASSISTANT ENGINEER LID EW SECTION CHEKKIAD GP
Annual Plan LSGD ANNUAL PLAN 2025 26 CHEKKIAD GP PR NO 281 Maintenance of Vazhakkandi Punnakkal Thazhe Vayal Road 2nd Reach IN WARD 15 General Civil Work
2026_LSGD_834184_2
007/2025-26/AE/LIDEW/CKD
Open Tender
Civil Works - Roads
180 days
CHEKKIAD GRAMA PANCHAYATH
Please refer Tender documents.
7 documents required · 7 mandatory
₹655
Yes
₹7,404
Yes
9 Mar 2026
6 Feb 2026
17 Feb 2026
6 Feb 2026
16 Feb 2026
6 Feb 2026
detailed estimate
3.15.1:Compacting Original Ground <br> (i) Compacting original ground supporting embankment <br> Loosening, Levelling and Compacting original ground supporting embankment to facilitate placement of first layer of embankment, scarified to a depth of 150 mm, mixed with water at OMC and then compacted by rolling so as to achieve minimum dry density as given in Tables 300.1 and 300.2 for embankment construction as per Technical Specification Clause 301.4.1.
4.1.A.1:Granular Sub-base with Well Graded Material (Table 400.1) (A) By Mix in Place Method Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. (i) For Grading I Material
4.9:Wet Mix Macadam Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406. By Mechanical Means with 1 km lead
75.5.1.1pb:Prime Coat - Low porosity - With Packed Bitumen Rates Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502
75.5.2.3pb:Tack Coat - With Packed Bitumen Rates Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503.
75.5.11.1.A.2pb:Mix Seal Surfacing - Manual Means - Type A - Bitumen S-65 - Packed Bitumen Rates Providing, laying and rolling of close-graded premix surfacing material of 20 mm thickness composed of 11.2 mm to 0.9 mm (Type-A) or 13.2 mm to 0.9 mm (Type-B) aggregates using penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 8-10 kN static roller and finishing to required level and grades as per Technical Specification Clause 509 By Manual Means Type A (II) Bitumen (S-65)
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1403147.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.28 MB
Tendernotice_2.pdf
PDF • 0.44 MB
Tendernotice_3.pdf
PDF • 0.25 MB
BOQ_1403147.xls
BOQ • 0.30 MB
viewsbd.pdf
Tender Documents • 1.72 MB
affidavit.pdf
Tender Documents • 0.24 MB
fot.pdf
Tender Documents • 0.26 MB
preliminary.pdf
Tender Documents • 0.26 MB
Download all tender documents and submit your bid