Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.1 CrAccepted-AOC OM VIHAR COLONY DELHI ROAD ROORKEE | ₹2.1 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹2.2 Cr+₹5.6 L (2.63%)Rejected-AOC OM VIHAR COLONY DELHI ROAD ROORKEE | ₹2.2 Cr+₹5.6 L (2.63%) | L2 | Rejected-AOC L2 |
| 3 | L3₹2.2 Cr+₹7.2 L (3.41%)Rejected-AOC 518 4 SAINI COLONY ROORKEE | ₹2.2 Cr+₹7.2 L (3.41%) | L3 | Rejected-AOC L3 |
| 4 | Not Admitted-Fee/PreQual/Technical I 910 JAHANGIR PURI NEAR BY ANAND MAYA HOSPITAL NORTH WEST DELHI DELHI 110033 UDYAM DL 06 0040830 | NORTH DELHI | DELHI | 110033 | - | - | Not Admitted-Fee/PreQual/Technical Others-Hard copy of Tender Fees, EMD & other relevant documents did not submit by the firm. |
Tender Value
₹2.0 Cr
EMD Value
₹4.0 L
Closing Date
6 Aug 2024, 4:00 pmClosed
Superintending Engineer
EDC, Chakrata, UPCL
REPLACEMENT OF EXISTING ACSR CONDUCTOR BY ARIAL BUNCH CABLE WITH SUPPLY AND ERECTION OF ASSOCIATE MATERIAL AT HORROWALA FEEDER (AT VILLAGES - RAJOLI, DUNGERKHET, WODWA, TIGRI UPPER, TIGRI LOWER, MELETHA ETC.) ENAMATING FROM 33/11 KV S/S RUDRAPUR.
2024_UPCL4_73995_1
11/EDCC/2024-25
Open Tender
Electrical Works
Turn-key
120 days
Herbertpur
Please refer Tender documents.
4 documents required · 4 mandatory
₹11,800
Executive Engineer, EDD, Vikasnagar
₹4.0 L
16 Oct 2024
26 Jul 2024
7 Aug 2024
26 Jul 2024
6 Aug 2024
27 Jul 2024
Amount
Material
Supply of dead end clamp with ihook
Supply of distribution box clamp with nut & bolts both 1 & 3 phase
Supply of suspension clamp ihook with nut & bolts
Supply of Pole clamps with nut & bolts
Supply of shead head type insulation Peericing connectors, jumpring for jumpring to line to line tapping. (70x70sqmm, 70x35 & 70x16sqmm) etc..
Supply of LT bare neutral connector PG clamp made of A.l 50x50 sqmm double bolt for line to line jumpering
Supply of LT bare neutral connector PG clamp made of A.l 50x16 sqmm double bolt for line to line jumpering
Supply of mid span insulated jointing sleeves subatiable for LT ABC as per UPCL Specification.
Supply of head shrink type of cap sutaiable for LT ACB as per UPCL Specification.
SMC 3Phase LT Distribution Box for new & replacement of damaged old distribution box both 1 & 3 phase.
SMC 1Phase LT Distribution Box for new & replacement of damaged old distribution box both 1 & 3 phase.
Supply of MS clamp with nut & bolt, Pole & other size pole.
Supply of 1x35sqmm XLPE including A.l Cable
Supply of MS Stay clamp for PCC Pole SP-21, SP-10, SP-23 made of MS flat size 50x6 mm with 2 nos, nut & bolts size 65x16mm for suspension clamps assemble without cracks & borst painted by primer
Supply of special type holding clamps for GI hooks with nuts & bolts
Supply of 1x35sqmm All lugs
LT AB Cable 3×95+1×50 sqmm
LT AB Cable 3×70+1×50 sqmm
LT AB Cable 3×35+1×25 sqmm
Labour
Dismantling of old ACSR conductor (Dog/weasel) (LT line) including Re- rolling back its conductor, wire, clamp insulator etc. including stacking & transportation of material to the UPCL store : 3 phase 4 wire 2 phase 3 wire
Carrying the material from dump store to site of work Mannual (approx dis. 01 km)
Carrying the material from dump store to site of work head load (approx dis. 00-01 km) Cable & other materials
Erection & Grouting of Pole for long span for reducing span
Erection of stay set 16x1800 sqmm
Laying, Stringing and Sagging of AB Cable size (3x95+1x50sqmm)
Laying, Stringing and Sagging of AB Cable size (3x70+1x50sqmm)
Laying, Stringing and Sagging of AB Cable size (3x35+1x25sqmm)
Fixing of Dead End clamps with ihook
Fixing of Distribution Box clamps with nuts & bolts
Fixing of Suspension clamp with ihook N&B
Fixing of Pole clamps with nuts & bolts
Fixing of shere head type insulation peering connectors jumpering for line to line/tapping 70-70sqmm
Fixing of shere head type insulation peering connectors jumpering for line to line/tapping 70-35sqmm
Fixing of shere head type insulation peering connectors jumpering for line to line/tapping 70-16sqmm
Fixing of LT bare netural connectors PG clamp made of A.l 50sqmm to 50sqmm double bolt.
Fixing of LT bare netural connectors PG clamp made of A.l 50sqmm to 16sqmm double bolt
Erection of mid span insulated jointing sleeves suitable for LT ABC as per UPCL specification.
Fixing of heal shink type and caps suitable for LT ACB as per UPCL Specification.
Erection of SMC three phase LT Distribution box (Complete)
Erection of SMC Single phase LT Distribution box with (Complete)
Fixing of MS clamps, LT clamps for pole with nuts & bolts without cracks & burrs.
Fixing of 1x35sqmm XLPE including Al. cable
Fixing of MS Stay Clamp for Pole, SP-21, SP-10, SP-23.
Fixing of special type holding clamps for JI hooks with nuts & bolt.
Fixing of 35 sqmm All lugs.
Removal of perivous connections & reconnection of single phase/Three phase LT consumer service connection.
m/s aryan electrical
VIKAS ELECTRICALS AND CONSTRUCTION
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .