Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹2.5 CrAccepted-AOC | ₹2.5 Cr Quoted ₹2.2 Cr | 1 | Accepted-AOC L1 |
| 2 | 2₹2.3 Cr+₹17.5 L (8.09%)Rejected-AOC | ₹2.3 Cr+₹17.5 L (8.09%) | 2 | Rejected-AOC L2 |
Tender Value
Refer Docs
EMD Value
₹6 L
Closing Date
11 Jan 2023, 12:00 pmClosed
CGM PP and D, AEGCL
O/o the MD, AEGCL, Bijulee Bhawan, Paltanbazar, Guwahati-781001
Revival of collapsed section of 132kV Srikona-Panchgram Line by introducing Composite Insulated Cross Arms technology involving supply, foundation, erection, dismantle and stringing works.
2022_AEGCL_27840_1
Tech-1054/SOPD-G/SRIKONA- PANCHGRAM/TL/CICA/2022
Open Tender
Electrical Works
Turn-key
240 days
Panchgram
Please refer Tender documents.
5 documents required · 5 mandatory
₹1,000
₹6 L
22 Feb 2023
21 Nov 2022
17 Jan 2023
21 Nov 2022
11 Jan 2023
2 Dec 2022
Amount
Fabricated Tower Superstructures 220KV D Type 9Mtr Extension: 1 No
Galvanized steel works including hangers, gussets, strain plates etc. ( For D Type) (HT Steel: 5140.590Kg, MS: 3398.430Kg)
Galvanized iron nuts & bolts, D Shackle, Pack Washer, spring Washer, Step bolts etc. (For D Type)
Galvanized steel works including hangers, gussets, strain plates etc. (For +9Mtr) (HT Steel: 1226.120Kg, MS: 2062.200Kg)
(ii) Galvanized iron nuts & bolts, spring washers, step bolts etc. (For +9Mtr)
Partially galvanized stub & cleat including Nut, Bolts etc (One set consist of 4 stub)
Stub Setting Template MS: 1364.925 Kg
Fabricated Tower Superstructures Special Suspension Tower A+30Mtr Extn. : 1 No
Galvanized steel Fabricated members HT: 8187.16 KG & MS: 9729.36 KG
Galvanized iron nuts & bolts, spring washers etc.
Galvanized stub & cleat including Nut, Bolts etc (one set consist of 4 stub)
Stub Setting Template including Nut, Bolts etc
Fabricated Tower Superstructures for existing B+12 strengthend Tower.
Galvanized steel Fabricated members HT: 4731.92 KG & MS: 1812.04 KG
Galvanized iron nuts & bolts, spring washers etc.
Composite Insulated Cross Arm (For Suspension Tower) including Hardware's, connecting steel angle, suspension fittings, bolts & nuts etc. in complete including Freight & Insurance. Suspension type tower - 2 towers X 3 each = 6 Nos (New A+30 Mtr Tower, Strengthen existing B+12 tower).
Composite Insulated Cross Arm (For Suspension Tower) as Mandatory Spare including Hardware's, connecting steel angle, suspension fittings, bolts & nuts etc. in complete including Freight & Insurance.
ACSR Panther Conductor (Existing Gantry - New D+9 - New A+30 - Spl B+12 strengthen tower - Existing C+0 tension tower) Total Span Length : 1358 Mtr Considering 8% additional for Sag & Wastage = 1358 + (8% of 1358) X 3 Phase = 4399.92 Mtr Say 4.4 KM
Porcelain Disc Insulator 90KN
Single Tension hardware fittings for Panther Conductor (Disc insulator accessories)
Stock bridge type Vibration Damper for ACSR Panther conductor.
Supply of Danger plates.
Supply of Phase plates.
Supply of Number plates.
Supply of anti-climbing device
Description of Work / Item(s)
Amount
Fabricated Tower Superstructures 220KV D Type 9Mtr Extension: 1 No
Galvanized steel works including hangers, gussets, strain plates etc. ( For D Type) (HT Steel: 5140.590Kg, MS: 3398.430Kg)
Galvanized iron nuts & bolts, D Shackle, Pack Washer, spring Washer, Step bolts etc. (For D Type)
Galvanized steel works including hangers, gussets, strain plates etc. (For +9Mtr) (HT Steel: 1226.120Kg, MS: 2062.200Kg)
(ii) Galvanized iron nuts & bolts, spring washers, step bolts etc. (For +9Mtr)
Partially galvanized stub & cleat including Nut, Bolts etc (One set consist of 4 stub)
Stub Setting Template MS: 1364.925 Kg
Fabricated Tower Superstructures Special Suspension Tower A+30Mtr Extn. : 1 No
Galvanized steel Fabricated members HT: 8187.16 KG & MS: 9729.36 KG
Galvanized iron nuts & bolts, spring washers etc.
Galvanized stub & cleat including Nut, Bolts etc (one set consist of 4 stub)
Stub Setting Template including Nut, Bolts etc
Fabricated Tower Superstructures for existing B+12 strengthend Tower.
Galvanized steel Fabricated members HT: 4731.92 KG & MS: 1812.04 KG
Galvanized iron nuts & bolts, spring washers etc.
ACSR Panther Conductor (Existing Gantry - New D+9 - New A+30 - Spl B+12 strengthen tower - Existing C+0 tension tower) Total Span Length : 1358 Mtr Considering 8% additional for Sag & Wastage = 1358 + (8% of 1358) X 3 Phase = 4399.92 Mtr Say 4.4 KM
Porcelain Disc Insulator 90KN
Single Tension hardware fittings for Panther Conductor (Disc insulator accessories)
Stock bridge type Vibration Damper for ACSR Panther conductor.
Supply of Danger plates.
Supply of Phase plates.
Supply of Number plates.
Supply of anti-climbing device
Description of Work / Item(s)
Amount
Check Survey as per Specification
Construction of PCC/RCC (M20) foundation including all labour,materials,equipments,excavation,shuttering,head loading, back filling etc complete for handling, transportation, batching, mixing, placing, levelling, curing etc complete inclusive of cost of Cement & Reinforcement Steel etc. 220KV DD+9 Type (FS) TMT-IS 1786 (Fe-500 D) Primary Producer (TATA/SAIL/Esser Steel/Jindal Panther Steel/Shyam steel or equivalent) (As per approved drawing)
Concteating
Reinforcement
Construction of PCC/RCC (M30) foundation including all labour,materials,equipments,excavation,shuttering,head loading, back filling etc complete for handling, transportation, batching, mixing, placing, levelling, curing etc complete inclusive of cost of Cement & Reinforcement Steel etc. Special Suspension Tower A+30 Mtr Extension(Raft Foundation) TMT-IS 1786 (Fe-500 D) Primary Producer (TATA/SAIL/Esser Steel/Jindal Panther Steel/Shyam steel or equivalent) (As per approved drawing)
Concteating (M30: 247.22CuM, M15: 32.40 CuM)
Reinforcement
Setting of stubs (sets of four) including transportation and distribution of stubs and accessories from store to site.
Super structure erection including transportation of structures by any means and distribution of structure and accessories from stores to site as per direction of site Engineer. 220KV DD+9 Type
Super structure erection including transportation of structures by any means and distribution of structure and accessories from stores to site including erection of Composite Insulated Cross Arm as per direction of site Engineer/ Manufacturer/ Designer Special Suspension Tower A+30 Mtr Extension
Super structure erection/modification/fabrication etc (if necessary as per site condition) for strengthening including transportation of structures by any means and distribution of structure and accessories from stores to site including erection of Composite Insulated Cross Arm as per direction of site Engineer/Manufacturer/Designer. Tower Superstructures for strengthening of existing B+12 Tower.
Erection of Composite Insulated Cross Arm (for suspension tower) in complete including supervision for the complete scope of work under this bid and training charges (in Assam) from Manufacturer of Composite Insulated Cross Arm
Stringing of power conductor including transportation from stores and distribution of conductors and accessories to sites and laying, stringing, tensioning, clamping, jointing, jumpering and hoisting of insulators complete including cost of all fittings and accessories not specifically mentioned eleswhere to make ready to charge.
Grounding of towers with 3 metre long 25 mm dia G I pipe, including cost of all materials, such as GI pipes, GI bolts & nuts and washer, salt, coke etc as per Specification.
Painting of towers with bituminous paints of approved quality up to 3 metres from ground level including the cost of paints.
Welding of all nuts & bolts up to the bottom cross arm level including all charges of transportation, materials etc.
Erection of Danger Plates (1 no per tower)
Erection of Phase Plates
Erection of Number Plates (1 no per tower)
Erection of anti-climbing device (1set per tower)
Description of Work / Item(s)
Amount
Installation of 24F DWSM OPGW
Installation of Joint Box and splicing works
OTDR LSPM Test
Tools and Tackles transportation
OPGW Drum Testing
OPGW Drum Transport from Guwahati
Description of Work / Item(s)
Amount
Dismantling of tower without damaging the members, transpotation to the store and proper staking.
Opening and lowering of OPGW from the portation of the line to be dismantled and transportation to the store.
Opening and lowering of the conductor from the portation of the line to be dismantled and transportation to the store.
P.V.SHETI ENGINERS & CONTRACTORS PVT.LTD.
P.V.SHETI ENGINERS & CONTRACTORS PVT.LTD.
P.V.SHETI ENGINERS & CONTRACTORS PVT.LTD.
P.V.SHETI ENGINERS & CONTRACTORS PVT.LTD.
P.V.SHETI ENGINERS & CONTRACTORS PVT.LTD.
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .