| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.5 LAccepted-AOC KONDOTTY PO KONDOTTY PIN 673638 | KONDOTTY | MALAPPURAM | KERALA | 673638 | L1 | Accepted-AOC lowest | |
| 2 | L2₹6.9 L+₹33,548.46 (5.12%)Rejected-AOC | L2 | Rejected-AOC second lowest | |
| 3 | Rejected-Technical | - | Rejected-Technical L3 |
Tender Value
Refer Docs
EMD Value
₹20,115
Closing Date
2 Jan 2024, 6:00 pmClosed
Assistant Engineer
Office of the Assistant Executive Engineer, LIDEW Subdivision , Kondotty
Annual Plan-2023-24, Kondotty BP- Muttyarakkal pond Renovation - Muthuvallur GP-67
2023_LSGD_635924_3
05/2023/AE/LID EW/KTY
Open Tender
Civil Works - Others
Item Rate
180 days
kondotty block panchayath
Please refer Tender documents.
9 documents required · 9 mandatory
₹1,775
₹20,115
6 Aug 2024
26 Dec 2023
4 Jan 2024
26 Dec 2023
2 Jan 2024
26 Dec 2023
26 Dec 2023 - 2 Jan 2024
Amount
Pond rennovation
60.7.3:DISMANTLING DR - Dismanling , clearing away and carefully stacking materials useful for reuse for any thickness of walls in DR masonry including disposal of debris within a distance of 150m.
60.7.8:DR with Departmental. Stone - DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course using departmental rubble including packing to compactness to lines and levels, labour charges etc. complete as per direction of Departmental officers at site
60.7.1:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
4.3.2:Centering and shuttering including strutting, propping etc. and removal of form work for:Retaining walls, return walls, (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc.
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
60.6:PVC WEEP HOLES- Providing weep holes using 75mm dia. PVC pipes working pressure 4kg /sq.cm including cost of materials, conveyance, labour charges etc. complete.
13.33.1:Pointing on stone work with cement mortar 1:3 ( 1 cement : 3 fine sand):Flush/ Ruled pointing
50.2.3.1:Pumping or Bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pumpset, etc complete
OD309314/2023-2024:Engaging man mazdoor for cleaning purpose
10.26.3:Providing and fixing hand rail of approved size by welding etc. to steel ladder railing, balcony railing, staircase railing and similar works, including applying priming coat of approves steel primer.G.I. pipes
10.25.2:Item Shifted to Sub head 14 as item 14.73 Item Shifted to head 14 as item 14.74 Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works
13.52.1:Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer's specifications including appropriate priming coat, preparation of surface, etc. complete.On steel work
OD298821/2023-2024:Providing and fixing Granite of any colour and shade for Name board, of required size laid over base of cement mortar 1:4 ( 1 cement : 4 coarse sand), including all charges etc. complete at all, levels, including lettering & fixing
MINHAJ A T
MOHAMMED ASIR T.
Bidder Name
Ramakrishnan k
MOHAMMED ASIR T.
MINHAJ A T
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_966059.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .