| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹27.5 LAccepted-AOC BHIKYASEN ALMORA | L1 | Accepted-AOC L1 | |
| 2 | L2₹27.9 L+₹42,941.37 (1.56%)Rejected-AOC WARD NO 4 NETA NAGAR SULTANPUR PATTI TEHSIL BAZPUR U S NAGAR RAMNAGAR | UDAM SINGH NAGAR | UTTARAKHAND | 244712 | L2 | Rejected-AOC L2 | |
| 3 | L3₹28.6 L+₹1.1 L (4.02%)Rejected-AOC | L3 | Rejected-AOC L3 | |
| 4 | L4₹28.6 L+₹1.1 L (4.09%)Rejected-AOC | L4 | Rejected-AOC L4 | |
| 5 | L5₹34.9 L+₹7.4 L (26.9%)Rejected-AOC NARSINGH MALLA NEAR FCI GODAM KAMALUAGANJA ROAD HALDWANI NAINITAL | NAINITAL | UTTARAKHAND | 244713 | L5 | Rejected-AOC L5 |
Tender Value
₹30.5 L
EMD Value
₹60,921
Closing Date
8 Nov 2021, 5:00 pmClosed
Superintending Engineer CCP II
VCV Gabar Singh Urja Bhawan Kanwali Road Dehradun
work of Annual maintenance of 33 11kV Substation at Machor and its associated HT LT lines Meter reading and attending the breakdowns and complaints of the consumers under EDD Bhikiyasain
2021_UPCLC_37078_4
CCP-II/27/2021-22
Open Tender
Electrical Works
Item Rate
365 days
Machor Bhikiyasain
Please refer Tender documents.
5 documents required · 5 mandatory
₹2,360
Yes
Executive Engineer Electricity Store Division
₹60,921
Yes
19 Nov 2022
7 Oct 2021
9 Nov 2021
7 Oct 2021
8 Nov 2021
7 Oct 2021
Amount
Skilled (Technical) Operator (For Maintenance and preventive maintenance of 33kV, 11kV, LT Lines and DTR's as per JE instructions (19 kms 33kV, 245kms 11kV, 352 kms LT, 150 Nos. DTR) as per schedule 2 including timely release of NSC & disconnections works as per JE instructions and consumer complaints handling as per UERC supply code 2020 and replacement straightening of upto 2 nos. damaged/titled poles and replacement of 50 nos defective mechanical meters including contractor profit)
Skilled (Operation Work in shifts for operation of 33/11kV substation including contractor profit)
Description of Work / Item(s)
Amount
Meter Reading and bill distribution work of consumers as per schedule monthly/bimonthly basis including SBM and accessories cartidge Roll etc.
R&R of damaged transformer 5% of 150=7. Excess damaged transformers will be replaced free of cost by the contractor.
Gani Engineering and construction company
Yusuf Hussain Contractor
Trackers Construction
G R ENTERPRISES
L and T Electrical and Works
SHRI SAI ENTERPRISES
Trackers Construction
Yusuf Hussain Contractor
L and T Electrical and Works
G R ENTERPRISES
Gani Engineering and construction company
Trackers Construction
Yusuf Hussain Contractor
G R ENTERPRISES
L and T Electrical and Works
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .