| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.8 LAccepted-AOC NARIPPATTA GP 253 24 | L1 | Accepted-AOC ACCEPT | |
| 2 | L2₹4.0 L+₹22,564.65 (5.98%)Rejected-AOC | L2 | Rejected-AOC HIGHER RATE | |
| 3 | L3₹4.1 L+₹28,472.15 (7.54%)Rejected-AOC DESOM BUR WUANDMERI TALUK CHEKIYAL PO ABAYAGIRI | KOZHIKODE | KERALA | 612906 | L3 | Rejected-AOC HIGHER RATE | |
| 4 | L4₹4.1 L+₹33,139.12 (8.78%)Rejected-AOC | L4 | Rejected-AOC HIGHER RATE |
| Sl No | Description | Qty | Unit | SREEJITH L2 | Midhunraj L3 | VIJAYAN P P L4 | SUNNY M M L1 |
|---|---|---|---|---|---|---|---|
| 1.00COMPOUND WALL | |||||||
| 1.00 | OD181448/2025-2026: DISMANTLING DR - Dismanling , clearing away and carefully stacking materials useful for reuse for any thickness of walls in DR masonry including disposal of debris within a distance of 150m.(ref.60.7.3.) | 19.11 | cum | 628.58 ₹12,015.31 | 637.84 ₹12,192.31 | 685 ₹13,093.78 | 593.09 ₹11,336.92 Lowest |
| 1.00 | OD181379/2025-2026:DR with Departmental. Stone-DRY RUBBLE MASONRY-Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to lines and levels cost and conveyance of all materials labour charges etc, complete as per direction of departmental officers at site | 13.38 | cum | 1,565.48 ₹20,947.69 | 1,588.53 ₹21,256.12 | 1,600 ₹21,409.6 | 1,477.1 ₹19,765.08 Lowest |
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 11.74 | cum | 303.47 ₹3,564.26 | 307.94 ₹3,616.76 | 325 ₹3,817.13 | 286.34 ₹3,363.06 Lowest |
| 1.00 | OD181389/2025-2026:Dry rubble masonry without concrete levelling course masonry with good quality blasted rubble
including packing to compactness to lines and levels cost and conveyance of all
materials,labour charges etc complete. | 34.71 | cum | 3,567.7 ₹1,23,845.57 | 3,620.22 ₹1,25,668.7 | 3,570 ₹1,23,925.41 | 3,366.28 ₹1,16,853.68 Lowest |
| 1.00 | OD181735/2025-2026: Demolishing laterate work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge. In cement mortar(ref. 15.7.4.) | 6.48 | cum | 1,767.97 ₹11,456.45 | 1,794 ₹11,625.12 | 1,925 ₹12,474 | 1,668.16 ₹10,809.68 Lowest |
| 1.01 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 1.82 | cum | 8,165.33 ₹14,885.4 | 8,285.55 ₹15,104.56 | 8,350 ₹15,222.05 | 7,704.35 ₹14,045.03 Lowest |
| 1.01 | 4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | 8.1 | sqm | 342.63 ₹2,775.3 | 347.68 ₹2,816.21 | 350 ₹2,835 | 323.29 ₹2,618.65 Lowest |
| 1.01 | 13.33.1:Pointing on stone work with cement mortar 1:3 ( 1 cement : 3 fine sand):Flush/ Ruled pointing | 86.55 | sqm | 343.3 ₹29,712.62 | 348.36 ₹30,150.56 | 360 ₹31,158 | 323.92 ₹28,035.28 Lowest |
| 1.01 | OD181948/2025-2026:Removing Fungal growth by scrapping and sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete. | 66 | sqm | 17.11 ₹1,129.26 | 17.36 ₹1,145.76 | 31 ₹2,046 | 16.14 ₹1,065.24 Lowest |
Tender Value
₹4.2 L
EMD Value
₹10,593
Closing Date
20 Aug 2025, 10:00 amClosed
ARYA BABU P
Office of the Assistant Engineer LIDEW Section Narippatta Grama Panchayat
Annual Plan 138/26 CHEEKKONNU GOVT LP SCHOOL PROTECTION WALL CONSTRUCTION NARIPPATTA GP
2025_LSGD_783447_23
01/2025/AE/LIDEW/NPT
Open Tender
Civil Works - Others
Item Rate
270 days
NARIPPATTA GP
Please refer Tender documents.
7 documents required · 7 mandatory
₹935
Yes
₹10,593
Yes
8 Oct 2025
11 Aug 2025
21 Aug 2025
11 Aug 2025
20 Aug 2025
11 Aug 2025
Amount
COMPOUND WALL
OD181448/2025-2026: DISMANTLING DR - Dismanling , clearing away and carefully stacking materials useful for reuse for any thickness of walls in DR masonry including disposal of debris within a distance of 150m.(ref.60.7.3.)
OD181379/2025-2026:DR with Departmental. Stone-DRY RUBBLE MASONRY-Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to lines and levels cost and conveyance of all materials labour charges etc, complete as per direction of departmental officers at site
2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
OD181389/2025-2026:Dry rubble masonry without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials,labour charges etc complete.
OD181735/2025-2026: Demolishing laterate work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge. In cement mortar(ref. 15.7.4.)
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources)
4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
13.33.1:Pointing on stone work with cement mortar 1:3 ( 1 cement : 3 fine sand):Flush/ Ruled pointing
OD181948/2025-2026:Removing Fungal growth by scrapping and sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete.
50.6.7.2:Laterate masonry with neatly dressed laterate stone of size 40x20x15cm or nearest size in cement mortar 1:6 for super structure above plinth level up to floor two level including all cost of materials, labour charges etc.
13.1.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand)
13.48.1:Finishing with Deluxe Multi surface paint system for interiors and exteriors using primer as per manufacturers specifications:Two or more coats applied on walls @ 1.25 ltr/10 sqm over and including one coat of special primer applied @ 0.75 ltr /10 sqm
15.28.1:Dismantling roofing including ridges, hips, velleys and gutters etc., and stacking the material within 50 metres lead of :G.S. Sheet
SREEJITH (BID ID -2290686)
Midhunraj (BID ID -2296998)
VIJAYAN P P (BID ID -2296689)
Bidder Name
SUNNY M M
Midhunraj
VIJAYAN P P
SREEJITH
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .