| Sl No | Description | Qty | Unit | Abraham L1 | PRAVEN JOSE L2 | MALAYORAM LABOURCONTRACT CO OPERATIVE SOCIETY L3 |
|---|---|---|---|---|---|---|
| 1.00compound wall | ||||||
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 66.43 | cum | 318.95 ₹21,188.17 | 300 ₹19,929.3 Lowest | 335.74 ₹22,303.54 |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 0.35 | cum | 7,033.82 ₹2,433.7 Lowest | 7,100 ₹2,456.6 | 7,404.03 ₹2,561.79 |
| 1.00 | OD102485/2025-2026: modified data60.7.1. DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site | 63.42 | cum | 3,540.86 ₹2,24,571.96 Lowest | 3,700 ₹2,34,665.1 | 3,655.23 ₹2,31,825.65 |
| 1.00 | 5.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 6.76 | cum | 8,834.68 ₹59,740.11 Lowest | 9,200 ₹62,210.4 | 9,299.67 ₹62,884.37 |
| 1.00 | 5.2.2:Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 0.32 | cum | 11,324.66 ₹3,669.19 Lowest | 11,920 ₹3,862.08 | 11,920.7 ₹3,862.31 |
| 1.01 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 4.32 | sqm | 342.38 ₹1,479.08 | 300 ₹1,296 Lowest | 360.41 ₹1,556.97 |
| 1.01 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 22.44 | sqm | 676.41 ₹15,178.64 | 650 ₹14,586 Lowest | 712.02 ₹15,977.73 |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 312.6 | kilogram | 99.68 ₹31,159.97 Lowest | 104 ₹32,510.4 | 104.93 ₹32,801.12 |
| 1.01 | 50.6.1.1:Solid block masonry using pre cast solid blocks ( factory made) of size 40x20x20cm or nearest available size confirming to IS 2185 part 1 of 1979 for foundation and plinth with thickness 20 cm and above in: CM 1:6 ( 1 cement : 6 coarse sand) etc complete | 25.55 | cum | 5,888.71 ₹1,50,450.65 Lowest | 6,100 ₹1,55,848.9 | 6,198.65 ₹1,58,369.31 |
Tender Value
₹8.5 L
EMD Value
₹21,153
Closing Date
1 Sept 2025, 6:00 pmClosed
AE LIDEW
AE MEENANGADI GRAMAPANJAYATH
410/25-26 COMPOUND WALL CONSTRUCTION FOR VARIOUS ANGANVADIES
2025_LSGD_789276_10
AE/ET-05/25-26
Open Tender
Civil Works - Others
Item Rate
MEENANGADI GP
Please refer Tender documents.
8 documents required · 8 mandatory
₹1,870
Yes
₹21,153
Yes
14 Oct 2025
23 Aug 2025
3 Sept 2025
23 Aug 2025
1 Sept 2025
23 Aug 2025
Amount
compound wall
2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources)
OD102485/2025-2026: modified data60.7.1. DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
5.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size derived from natural sources)
5.2.2:Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size derived from natural sources)
5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
50.6.1.1:Solid block masonry using pre cast solid blocks ( factory made) of size 40x20x20cm or nearest available size confirming to IS 2185 part 1 of 1979 for foundation and plinth with thickness 20 cm and above in: CM 1:6 ( 1 cement : 6 coarse sand) etc complete
13.1.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand)
13.47.1:Finishing walls with Premium Acrylic Smooth exterior paint with Silicone additives of required shade:New work (Two or more coats applied @ 1.43 ltr/ 10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/ 10 sqm)
OD102479/2025-2026:Picture painting with synthetic enamel paint of approved brand and manufacture of required colour and pattern including cost,coveyanace ,labour charges etc complete
10.25.2:Item Shifted to Sub head 14 as item 14.73 Item Shifted to head 14 as item 14.74 Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works
13.61.1:Painting with synthetic enamel paint of approved brand and manufacture to give an even shade:Two or more coats on new work
13.33.1:Pointing on stone work with cement mortar 1:3 ( 1 cement : 3 fine sand):Flush/ Ruled pointing
PRAVEN JOSE (BID ID -2320808)
MALAYORAM LABOURCONTRACT CO OPERATIVE SOCIETY (BID ID -2318736)
Bidder Name
Abraham
PRAVEN JOSE
MALAYORAM LABOURCONTRACT CO OPERATIVE SOCIETY
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1300835.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .