Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.1 LAccepted-AOC SAI VILLA C 65 EKTA NAGAR BAREILLY UTTAR PRADESH 243 122 | BAREILLY | UTTAR PRADESH | 243122 | L1 | Accepted-AOC Being L1 and Reasonable | |
| 2 | L2₹11.5 L+₹37,855 (3.41%)Rejected-Finance | L2 | Rejected-Finance Being other than L1 | |
| 3 | L3₹13.3 L+₹2.2 L (19.9%)Rejected-Finance SRIPUR BICHWA VILLAGE MAJRA FARM KHATIMA UDHAM SINGH NAGAR UTTARAKHAND 262308 | KHATIMA | UDHAM SINGH NAGAR | UTTARAKHAND | 262308 | L3 | Rejected-Finance Being other than L1 | |
| 4 | L4₹13.5 L+₹2.4 L (21.8%)Rejected-Finance SHOP NO 10 ASHRAM MANDIR NAKATIA P O P A C SHAHJAHANPUR ROAD BAREILLY 243001 | BAREILLY | BAREILLY | UTTAR PRADESH | 243001 | L4 | Rejected-Finance Being other than L1 |
| Sl No | Description | Qty | Unit | NOORI ELECTRIC ENGINEERING WORKS L4 | M/s Kashnyal Engineers L2 | Pushkar Dutt Bhatt L3 | NORTH INDIA PEST CONTROL L1 |
|---|---|---|---|---|---|---|---|
| .05DESCRIPTION OF ITEMS | |||||||
| 1.00 | Taking down cement plaster of any description on brick or stone walls, ceiling etc including rakking out joints , hacking for key , scrubbing down with water at any height etc all as specified and as directed. | 675 | Sqm | 40 ₹27,000 | 10 ₹6,750 Lowest | 10 ₹6,750 Lowest | 10 ₹6,750 Lowest |
| 2.00 | M&L for rendering in cement mortar (1:4) 15 mm thick on fair faces of brick walls or concrete surfaces mixed with water proofing compound as per manufacturer instructions, finished fair and even without using extra cement all complete as specified and as directed | 395 | Sqm | 165 ₹65,175 | 200 ₹79,000 | 130 ₹51,350 Lowest | 200 ₹79,000 |
| 3.00 | M & L 10 mm thick rendering in cement mortar 1:6 on brick work or concrete surface, surface finished even and smooth without using extra cement complete. | 200 | Sqm | 160 ₹32,000 | 180 ₹36,000 | 120 ₹24,000 Lowest | 200 ₹40,000 |
| 4.00 | M & L rendering 5 mm thick in cement mortar 1:3 on concrete surfaces as in ceiling surface finish even and smooth without using extra cement complete all as specified and directed.. | 80 | Sqm | 200 ₹16,000 | 170 ₹13,600 | 121 ₹9,680 Lowest | 200 ₹16,000 |
| 5.00 | Supply only Liquid water proofing compound complete all as specified and directed. | 14.66 | Ltr | 180 ₹2,638.8 | 200 ₹2,932 | 66 ₹967.56 Lowest | 200 ₹2,932 |
| 6.00 | M & L Preparation newly and old plastered surfaces and applying 1mm thick Wall care putty on surfaces of wall as per manufacture's instruction complete all as specified and directed. | 7,875 | Sqm | 38 ₹2,99,250 | 20 ₹1,57,500 Lowest | 44 ₹3,46,500 | 25 ₹1,96,875 |
| 7.00 | Material & Labour for applying Two or more coats of 100% Premium acrylic emulsion paint having VOC less than 50 gm/litre and UV resistance as per IS 15489:2004, Alkali & fungal resistance, dirt resistance exterior paint of required shade (Company Depot Tinted) with silicon additives @ 1.43 litre/ 10 sqm over and including priming coat of exterior primer applied @ 0.90 litre/ 10sqm over new surfaces.and washing floors, cleaning glass, joinery,electrical fittings, wiring etc. , of drops and splashes etc by using airless electric sprayers through authorised applicator of paint manufacturer complete all as specified all as specified . Note: The following notes shall be applicable for all the Items where ever specified that the work is to be carried out through "authorised applicator" and the rate quoted by the Contractor shall be deemed to be included for the following provisions and nothing extra shall be paid to the contractor on this account 1.The work shall be executed from the authorized applicator of one of the following manufacturer:- (a) Berger Paints,(b) Shalimar Paints (c) Asian Paints 2. Material shall be approved by GE 3. A triparty MOU in between the Manufacturer, applicator and the contractor shall be submitted by the contractor before commencement of the work at site. | 395 | sqm | 70 ₹27,650 | 110 ₹43,450 | 55 ₹21,725 Lowest | 60 ₹23,700 |
| 8.00 | Distempering with 1st quality acrylic distemper (ready mixed) having VOC content less than 50 gms/litre, of approved manufacturer, of required shade and colour complete, as per manufacturer's specification. Two or more coats on new work and washing floors, cleaning glass, joinery,electrical fittings, wiring etc. , of drops and splashes complete all as specified . | 200 | Sqm | 50 ₹10,000 Lowest | 70 ₹14,000 | 55 ₹11,000 | 60 ₹12,000 |
| 9.00 | M & L for applying two coats of oil bound distemper over a coat of primer on prepared wall putty surfaces of ceiling by using airless electric sprayers through authorised applicator of paint manufacturer all as per specified and directed. | 80 | Sqm | 37 ₹2,960 | 65 ₹5,200 | 66 ₹5,280 | 20 ₹1,600 Lowest |
Tender Value
₹15 L
EMD Value
₹30,000
Closing Date
4 Jun 2026, 6:00 pmClosed
GE PITHORAGARH
GE PITHORAGARH, POST-BHARKATIYA, PITHORAGARH-262520
GE/PGH/32 of 2026-27
2026_MES_765001_1
8781/PGH/E8
Open Tender
Civil Works
Item Rate
240 days
GE PITHORAGARH
PLEASE REF TENDER DOCUMENT
6 documents required · 6 mandatory
₹500
GE PITHORAGARH
₹30,000
Yes
1 Aug 2026
13 May 2026
11 Jun 2026
13 May 2026
4 Jun 2026
28 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.05 | DESCRIPTION OF ITEMS | - | - | - | - |
| 1Taking down cement plaster of any description on brick or stone walls, ceiling etc including rakking out joints , hacking for key , scrubbing down with water at any height etc all as specified and as directed. | |||||
| 2M&L for rendering in cement mortar (1:4) 15 mm thick on fair faces of brick walls or concrete surfaces mixed with water proofing compound as per manufacturer instructions, finished fair and even without using extra cement all complete as specified and as directed | |||||
| 3 | M & L 10 mm thick rendering in cement mortar 1:6 on brick work or concrete surface, surface finished even and smooth without using extra cement complete. | 200 | Sqm | - | - |
| 4 | M & L rendering 5 mm thick in cement mortar 1:3 on concrete surfaces as in ceiling surface finish even and smooth without using extra cement complete all as specified and directed.. | 80 | Sqm | - | - |
| 5Supply only Liquid water proofing compound complete all as specified and directed. | |||||
| 6M & L Preparation newly and old plastered surfaces and applying 1mm thick Wall care putty on surfaces of wall as per manufacture's instruction complete all as specified and directed. | |||||
| 7Material & Labour for applying Two or more coats of 100% Premium acrylic emulsion paint having VOC less than 50 gm/litre and UV resistance as per IS 15489:2004, Alkali & fungal resistance, dirt resistance exterior paint of required shade (Company Depot Tinted) with silicon additives @ 1.43 litre/ 10 sqm over and including priming coat of exterior primer applied @ 0.90 litre/ 10sqm over new surfaces.and washing floors, cleaning glass, joinery,electrical fittings, wiring etc. , of drops and splashes etc by using airless electric sprayers through authorised applicator of paint manufacturer complete all as specified all as specified . Note: The following notes shall be applicable for all the Items where ever specified that the work is to be carried out through "authorised applicator" and the rate quoted by the Contractor shall be deemed to be included for the following provisions and nothing extra shall be paid to the contractor on this account 1.The work shall be executed from the authorized applicator of one of the following manufacturer:- (a) Berger Paints,(b) Shalimar Paints (c) Asian Paints 2. Material shall be approved by GE 3. A triparty MOU in between the Manufacturer, applicator and the contractor shall be submitted by the contractor before commencement of the work at site. | |||||
| 8Distempering with 1st quality acrylic distemper (ready mixed) having VOC content less than 50 gms/litre, of approved manufacturer, of required shade and colour complete, as per manufacturer's specification. Two or more coats on new work and washing floors, cleaning glass, joinery,electrical fittings, wiring etc. , of drops and splashes complete all as specified . | |||||
| 9M & L for applying two coats of oil bound distemper over a coat of primer on prepared wall putty surfaces of ceiling by using airless electric sprayers through authorised applicator of paint manufacturer all as per specified and directed. | |||||
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.50 MB
tender_docs.pdf
Tender Documents • 1.45 MB
BOQ_856816.xls
BOQ • 0.58 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .