7 Feb 2026, 6:00 pmClosed
Executive Engineer, Und Irrigation Division, Jamnagar
Several Repairing & Painting Work at Fulzar (K.B.) WRP.
269341
14 of 2025-26
Open
Civil - All
Works
Jamnagar
4 documents required · 3 mandatory · 1 optional
₹900
Yes
EXECUTIVE ENGINEER UND IRRIGATION DIVISION JAMNAGAR
₹16,000
Yes
24 Jan 2026
24 Jan 2026
24 Jan 2026
7 Feb 2026
24 Jan 2026
BILL OF QUANTITIES
(A) Percentage Rate Tender (Up to INR 10 Cr.)
Name of work : FULZAR(K.B.) WATER RESOURCES PROJECT
Several Repairing & Painting Work at Fulzar (K.B.) WRP.
Item Description of Item (with brief Quantity Unit Rate In Amount
No. specification and reference to book of figures
specifications)
1 Providing epoxy plaster 6 to 8mm min. 168.00 Sqmt. 2483.00
thickness incl. filling of all pot-holes /ditches
with epoxy mortar upto req. depth by using
resin : hardner : aggregates confirming to IS-
9162 in proportion 0.7:0.3:6.5,by weight on
exposed damaged old and rough surface of
spillway/canal strs with proper application of
necessary primer coat of resin and hardener
in proportion of 2:1 by weight confirming to
IS-9197 to give proper bond between old
surface and epoxy plaster incl. necessary
cleaning, cheeping of old surface incl.
scaffolding, tools bars for the job with labour
incl. all lead and lift etc complete in all
condition dry and wet.
2 Cement Plaster 20mm thick in single coat to 71.00 Sqmt. 261.00
stone masonary in C.M. 1:3 incl. finishing,
curing, scaffolding etc. complete.
(a) UPTO 6.0 Mt. HEIGHT.
3 Cement Plaster 10mm thick in single coat to 46.00 Sqmt. 151.00
CC/RCC work and brick work on fair side in
C.M.1:3 including finishing, curing, scaffolding
(a) UPTO 6.0 Mt. HEIGHT.
4 Providing and laying broken chine mosaic 46.00 Sqmt. 779.70
flooring for terrace using 12 mm to 20 mm
broken pieces of glazed tiles to be laid over
cement mortar 1:3 to plain or slope and to be
tempered to bring mortar creme out upto
surface using white cement including
rounding off junctions and extending them
upto 15 cm along the wall, clearing with
water and oxalic acid etc. as directed.
5 Dismantling of RCC work viz. slab, beam, 9.00 Cum. 1362.00
lintel, barrel, staircase etc. including
removing the steel from the dismantled
portion without damage to reinforcement
sorting and stacking of useful and unuseful
material from the dismantled material as
directed etc comp.
6 Providing & Laying in position 'NOMINAL 5.20 Cum. 4458.00
MIX' cement concrete using cement sand and
crushed aggregate by machine mix incl.
necessary formworks, centering, scaffolding
compaction by mechanical vibrator curing as
directed with all lead & lift etc. (E) Concrete
grade 1:1.5:3 and MSA-20mm(Graded)
Item Description of Item (with brief Quantity Unit Rate In Amount
No. specification and reference to book of figures
specifications)
7 Providing, cutting, bending, binding and 0.42 M.T. 76574.00
fixing in position as per drawing TMT BAR,
reinforcement for R.C.C. works and anchor
bars incl. cost of black annealed 16 to 18 BWG
M.S. Wire etc. complete with all lead and lift.
8 Wall painting (two coats) with plastic 110.00 Sqmt. 86.38
emulsion paint of approved brand and
manufacture on undecorated wall surface to
give an even shade including throughly
brushing the surface free from mortar
droppings and other foreign matter and sand
papered smooth.
9 Finishing wall with weather proof exterior 139.00 Sqmt. 122.14
emulsion paint on wall surface (two coats) to
give and required shape even shade after
thoroughly brushing the surface to remove all
dirt, and remains of loose powdered
materials etc complete.
10 Providing and fixing G.I. Pipe railing (B-class 489.00 Rmt. 1942.00
medium duty) as per design of 1.0 mt height,
using 75x75x10 mm size M.S. Angle at 2.0 mt
c/c for vertical posts and 38 mm dia G.I. Pipe
for 4 horizontal rows incl. one coat of red
oxide primer & two coats of oil paint etc
11 Providing and laying marble stone slab 5.30 Sqmt. 2247.02
flooring over 20mm (average) base of cement
mortar 1:6 (1-cement : 6 coarse sand) or L.M.
1:1.5 (1- lime putty : 1.5 - coarse sand) laid
and jointed with gray cement slurry including
rubbing and polishing complete.
(A) Marble slab 25mm thick
12 Providing and fixing 35 mm thick shutters for 4.50 Sqmt. 3773.84
Doors, windows and clearstory windows
including black enameled M.S. butt hinges
with necessary screws.
(A) Indian teak wood. (i) Fully Panelled.
13 Providing and fixing window having extruded 2.00 Sqmt. 1713.70
aluminum Colour anodized section frame
main outer size 63.50 x 38.10 x 1.95 mm, @
Wt 1.094 Kg/Rmt, horizontal two track
member size 61.85 mm x 31.75 mm x
1.20mm @ wt. of 0.695 Kg/mt, vertical
member of size 61.85 mm x 31.75mm x
mm @ wt. of 0.659 Kg/mt with sliding
shutters of horizontal member size 40mm x
vertical member of size 40mm x 18mm x
Kg/mt with 5 mm thick transparent bronze
colour tinted float glass with powder coated
aluminum fittings and fixtures and
transparent silicon sealant glass fixing to
frame as per details etc complete for window.
Item Description of Item (with brief Quantity Unit Rate In Amount
No. specification and reference to book of figures
specifications)
14 PVC SWR pipes IS 13592 for Drain - 110 mm 16.00 Rmt. 265.34
I am/we are willing to carry out the work at ____________________ % below/above percent
(Should be written in figures and words) of the estimated rates mentioned above. Amount of
My/Our tender works out as under :-
Estimated Amount Rs. 15,58,769=47 Estimated Amount Rs. 15,58,769=47
Put to Tender Rs. Put to Tender Rs.
Deduct _______% Below Rs. __________ Add _______% Above Rs. __________
Net Rs. Net Rs.
(Rupees in words) ________________________ (Rupees in words) ________________________
1. The Contractor shall exhibit a board with detailed specification and details of work as
directed by the Engineer-In-Charge for which no extra payment shall be made.
2. The labour cess will be deducted as per prevailing rules i.e.1% of the work done.
3. GST and Income tax TDS will be deducted at a source while making payments of bills
4. In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per
Govt.G.R.:PRC-10/2017CementConsumption/16/CDate:11/05/2017as stated in S.O.R.
therefore in R.C.C. items where there is a change as per actual mix design the cost of
difference of cement consumption have been deducted from the rate of original item at the
rate of input rate mentioned in all the tender.
5. GST TAX :- The rates to be quoted by the contractor must be inclusive of all duties, taxes,
and other levies except GST payable by the contractor under the contract.
Signature of Contractor Executive Engineer
Und Irrigation Division
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
4.pdf
price bid.pdf
Tender Notice No.14.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .