Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.0 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹2.0 L+₹359.89 (0.18%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹2.0 L
EMD Value
₹3,998
Closing Date
12 Aug 2026, 6:00 pmClosed
Executive Engineer Rew Baramulla
Executive Engineer Rew Baramulla
Construction of Catch water drain from masjid shareef syed colony to Hanjipora near Farooq Ahmad Rather,Gh rasool Rather and Farooq Ahmad Mir and others at Tarzoo. Pyt HalqaTarzoo A, SCHEME PRI GRANTS Block Sopore
2026_RDPR_317752_18
157/Xen/Rew/Bla/2026-27 Dated 24/07/2026
Open Tender
Civil Works
Percentage
30 days
Baramulla
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Executive Engineer REW Baramulla
₹3,998
29 Aug 2026
25 Jul 2026
13 Aug 2026
25 Jul 2026
12 Aug 2026
25 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth. | 29.5 | cum | 479.3 | ₹14,139.35 |
| 2 | Providing, Laying of stone soiling/BOULDERS (Nallah) Dully hand packed including watering , dressing and ramming with all carriage , loading & unloading upto site of work complete job. | 3.33 | cum | 1,200 | ₹3,996 |
| 3 | Providing and laying in position specified grade of cement concrete excl. cost of centering, shuttering, finishing and reinforcement. All work upto plinth level 1:3:6 (1 cement: 3 coarse sand: 6 graded stone agg. 20mm nominal size) crushed. | 20 | cum | 5,733.6 | ₹1,14,672 |
| 4 | Centering and shuterring including strutting propping etc removal of same for Foundations, footings etc. | 97.5 | sqm | 286.35 | ₹27,919.13 |
| 5 | 06 mm thick cement sand plaster in 1:4 mix. | 97.5 | sqm | 231 | ₹22,522.5 |
| 6 | Carriage of sand/Aggregate from source to site of wprk by MT 25 km lead. | 28 | cum | 460.41 | ₹12,891.48 |
| 7 | add provision for signboard /photographs/head load/site clearance/and any unforeseen items etc | 1 | job | 3,800 | ₹3,800 |
stage.html
html • 0.02 MB
finance_1043101.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.15 MB
BOQ_1043101.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .