| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹25.3 LAccepted-AOC THONIPALLAM HOUSE THEKKEDESAM POST NALLEPILLY PALAKKAD 678 553 | PALAKKAD | KERALA | 678553 | L1 | Accepted-AOC L1 | |
| 2 | L2₹25.9 L+₹57,005.57 (2.25%)Rejected-AOC PALLIYAN HOUSE KARUKUTTY PO ERNAKULAM DT 683576 | ERNAKULAM | KERALA | 683576 | L2 | Rejected-AOC L2 |
Tender Value
₹26.7 L
EMD Value
₹50,000
Closing Date
13 Oct 2020, 4:00 pmClosed
Executive Engineer, MI Division, Palakkad
Office of the Executive Engineer, MI Division, Palakkad
Renovation of Side protection wall of Lankeswaram kulam in chittur-Thathamangalam municpality in Palakkad District-Phase-II
2020_Irrig_389428_1
31/ET/EE/MI/PKD/2020-2021
Open Tender
Civil Works - Roads
Item Rate
365 days
Chittur
Please refer Tender documents.
6 documents required · 6 mandatory
₹3,095
Yes
online
₹50,000
Yes
21 Dec 2020
5 Oct 2020
19 Oct 2020
5 Oct 2020
13 Oct 2020
5 Oct 2020
5 Oct 2020 - 8 Oct 2020
Amount
Desilting and renovation of pond and construction of protection Wall
2.32 : Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared.
2.33.1 : Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyound 30 cm girth up to and including 60 cm girth
od28052/2020_2021/IA : Earth work excavation in all class of soil as per item No 2.6.1, the earth conveyed from site by contractor.
60.2.2 : Bailing out water Using 5HP Pump- Bailing out water with 5HP engine and pump set including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete
15.9.2 : Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges:In cement mortar
60.7.1 : DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
4.3.2 : Centering and shuttering including strutting, propping etc. and removal of form work for:Retaining walls, return walls, (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc.
4.1.3 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
5.22.6 : Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
60.7.8 : DR with Departmental. Stone - DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course using departmental rubble including packing to compactness to lines and levels, labour charges etc. complete as per direction of Departmental officers at site
od27527/2020_2021/IA : od59934/2019_2020/IA :Supplying and installation of Water scale (ISA65X65X6) by connecting three bars ofGI Pipe of 50mm ,in builted into 60X60X40 CC of 1:3:6 in water body for measuring of water level and fixingdisplay board of size 100X70 cm supported on 50mm GI Pipe which is in built at 45X45X60 concrete block of1:3:6 near pond to calculate volume of water, as per departmental officer's at site.Earth work- 60X60X40cm0.6*0.6*0.4=0.144 say 0.150.45*0.45*0.6=0.1215,say 0.15total =0.3 cumconcrete 1:3:6=0.15+0.15=0.3GI Pipe for supporting member L=0.3+0.9+1.05+1.05=3.3add 5% wastage=0.163total L=3.465 say 3.5 and0.2+1.00+0.7=1.9,add 5% wastage 0.095,total=1.995,say 2mnet total=3.5+2=5.5for 25mm GI pipe,Q=1+1+0.7+0.7=3.4,add 5% wastage=0.17,total=3.57,say 4mGalvanised steel plain sheet (18 guage)size of sheet 1.00X0.7volume of 18 guage GI sheet 10.5 kg/sqm)volume=1.00*0.7*10.5 kg/sqm)=7.35,add 5% wastage=0.37,total=7.72,say 7.8 kgMS angle 65X65X6mmQ=2m,add 5% wastage =0.1m,total=2.1mwt of 6mm MS angle =5.95kg/m,total=5.95*2.1=12.495,say12.5kgPainting:-GI pipe 50mm (3.3*22/7*0.0483=0.5 sqm),area of angle iron=4*0.65*2=5.2,total=0.5+5.2=5.7 say 6 sqmGI pipe 50mm, (1.9*22/7*0.0483=0.29 sqm)GI pipoe 25mm (3.4*22/7*0.0483=0.52 sqm)GI sheet 18 guage(2*1*0.7*1=1.4 sqm
JAMES P J
Bidder Name
A.SURESH
JAMES P J
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_553881.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .