| 1 | L1₹21.1 LAccepted-AOC JAIN SADAN MAHAL ROAD SHIVPURI DISTT SHIVPURI MP | SHIVPURI | SHIVPURI | MADHYA PRADESH | L1 | Accepted-AOC Being lowest bidder | |
| 2 | L2₹22.8 L+₹1.7 L (8.05%)Rejected-Finance | L2 | Rejected-Finance Other than lowest bidder | |
| 3 | L3₹26.9 L+₹5.8 L (27.4%)Rejected-Finance 27 19 F F D BLOCK CHATTARPUR EXTN SOUTH WEST DELHI DELHI 110075 | SOUTH WEST DELHI | DELHI | 110075 | L3 | Rejected-Finance Other than lowest bidder | |
| 4 | L4₹28.7 L+₹7.5 L (35.6%)Rejected-Finance 1170 BENGALI MOHALLA NEAR PRABHAKAR HOSPITAL AMBALA CANTT 133001 | AMBALA | HARYANA | 133001 | L4 | Rejected-Finance Other than lowest bidder | |
| 5 | L5₹29.0 L+₹7.9 L (37.3%)Rejected-Finance | L5 | Rejected-Finance Other than lowest bidder |
| Sl No | Description | Qty | Unit | Anil jindal and sons L6 | M/S Trilok chand sharma L7 | ANIL CONSTRUCTION CO. L1 | R. P. Suppliers and Construction Co. L10 | M/s Guddu Builders L2 | Ashwani Kumar L8 | MAYANK ENTERPRISES L9 | KULWANT SINGH L3 | RAJINDER KUMAR AND ASSOCIATES L5 | R.D Builders L11 | The Rahul Vig L4 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Material & Labour for complete removal of existing treatment internal as well as external or ceiling of building and soffits of Over Head Tank including installations of GE Utility by scrapping with mechanical wall sander (having mechanical vacuum mechanism) having RPM not less than 1500, sanding pad of 80 Grit having dia of 7"/9" to make the surface free from dust, loose paint etc. by skilled labour complete all as specified and directed. | 7,400 | Square Metre | 50 ₹3,70,000 | 40 ₹2,96,000 | 25 ₹1,85,000 | 130 ₹9,62,000 | 20 ₹1,48,000 Lowest | 48 ₹3,55,200 | 80 ₹5,92,000 | 30 ₹2,22,000 | 40 ₹2,96,000 | 130 ₹9,62,000 | 66 ₹4,88,400 |
| 2.00 | Material & Labour for applying One coat of white cement based water proof wall care putty to give smooth and even surface on old as well as new plastered, old brick pattern finish wall surface and Over head tank including installations of GE Utility including sand papering the puttied surfaces to form an even and smooth surface complete all as specified and directed. | 7,400 | Square Metre | 100 ₹7,40,000 | 110 ₹8,14,000 | 42 ₹3,10,800 | 130 ₹9,62,000 | 36 ₹2,66,400 Lowest | 125 ₹9,25,000 | 120 ₹8,88,000 | 100 ₹7,40,000 | 70 ₹5,18,000 | 130 ₹9,62,000 | 55 ₹4,07,000 |
| 3.00 | Material & Labour for preparation of puttied surfaces and applying two coats of 100% permium acrylic emulsion paint having VOC less than 50gm /litre and UV resistance as per IS15489:2004, Alkali, & fungal resistance, dirt resistance exterior paint of required shade (company Depot Tinted) with silicon additives @ 1.43 litre/10sqm over and including priming coat of exterior primer applied @0.90 litre/ 10sqm per coat of weather proof exterior emulsion paint over new plastered or unplastered and old plastered/ unplastered surfaces of Over head tank and installations of GE utility to be applied with fully automatic airless spray machine with a flow speed of min 1 ltr per minute having a pressure of 3300 PSI, by allowing 6-8 hrs to dry the surface for painting of subsequent coats complete all as specified and directed.
Make:-Weather coat long life WL 300 in berger / Apex ultima protek PU Serum Asian Paints or equivalent manufacturer as approved by GE. | 5,900 | Square Metre | 200 ₹11,80,000 | 210 ₹12,39,000 | 88 ₹5,19,200 Lowest | 130 ₹7,67,000 | 148 ₹8,73,200 | 185 ₹10,91,500 | 120 ₹7,08,000 | 110 ₹6,49,000 | 170 ₹10,03,000 | 130 ₹7,67,000 | 111 ₹6,54,900 |
| 4.00 | Material & Labour for applying two coats of oil bound distemper over a coat of alkali resistant primer over new plastered or unplastered and old plastered/ unplastered surface using Airless spray technology with max working pressure of 3300 PSI and capable of operating single spray gun with a max material hose length of 30 mtr the spray machine should be of reputed manufacturer with pro guard technology and capability of tracking pressure and paint usage and certified by paint manufacturer and as mentioned in PS and accessories for applying distemper/ primer should be able to spray in hard to reach areas and penetration of distemper on the surface complete all as specified and directed.
Make:- Bison acrylic distemper in Berger, Lustre interior wall finish in Asian Paints or equivalent manufacturer as approved by GE. | 1,500 | Square Metre | 50 ₹75,000 | 40 ₹60,000 Lowest | 43 ₹64,500 | 130 ₹1,95,000 | 56 ₹84,000 | 125 ₹1,87,500 | 120 ₹1,80,000 | 130 ₹1,95,000 | 70 ₹1,05,000 | 100 ₹1,50,000 | 111 ₹1,66,500 |
| 5.00 | Material & Labour for applying one coats of 100% permium acrylic emulsion paint having VOC less than 50gm /litre and UV resistance as per IS15489:2004, Alkali, & fungal resistance, dirt resistance exterior paint of required shade (company Depot Tinted) with silicon additives @ 1.43 litre/10sqm over and including priming coat of exterior primer applied @0.90 litre/ 10sqm per coat of weather proof exterior emulsion paint over and including priming coat of exterior primer over old rough plastered surfaces to be applied with fully automatic airless spray machine with a flow speed of min 1 ltr per minute having a pressure of 3300 PSI, by allowing 6-8 hrs to dry the surface for painting of subsequent coats complete all as specified and directed.
Make:- Weather coat long life WL 300 in berger / Apex ultima protek PU Serum Asian Paints or equivalent manufacturer as approved by GE. | 600 | Square Metre | 120 ₹72,000 | 140 ₹84,000 | 55 ₹33,000 Lowest | 200 ₹1,20,000 | 67 ₹40,200 | 145 ₹87,000 | 120 ₹72,000 | 100 ₹60,000 | 100 ₹60,000 | 100 ₹60,000 | 66 ₹39,600 |
| 6.00 | Material & Labour for applying two coats of 100% permium acrylic emulsion paint having VOC less than 50gm /litre and UV resistance as per IS15489:2004, Alkali, & fungal resistance, dirt resistance exterior paint of required shade (company Depot Tinted) with silicon additives @ 1.43 litre/10sqm over and including priming coat of exterior primer applied @0.90 litre/ 10sqm per coat of weather proof exterior emulsion paint over new existing rough plastered surfaces to be applied with fully automatic airless spray machine with a flow speed of min 1 ltr per minute having a pressure of 3300 PSI, by allowing 6-8 hrs to dry the surface for painting of subsequent coats complete all as specified and directed.
Make:- Weather coat long life WL 300 in berger / Apex ultima protek PU Serum Asian Paints or equivalent manufacturer as approved by GE. | 420 | Square Metre | 150 ₹63,000 | 150 ₹63,000 | 78 ₹32,760 Lowest | 150 ₹63,000 | 88 ₹36,960 | 145 ₹60,900 | 150 ₹63,000 | 100 ₹42,000 | 130 ₹54,600 | 100 ₹42,000 | 111 ₹46,620 |
| 6.01Notes for Periodical services: MOBILISATION OF T&P AND MATERIAL: The Contractor shall complete the following activities within 20 days from the date of commencement of work: (a) Submission of Memorandum of Understanding (MOU) with any of paint manufacturer. (b) Obtaining approval of paints & authorized applicator of paints manufacturer from GE. (c) Procurement of T&P required for mechanical mode of painting. (d) 30% of the quantity of Paints, Primer & Putty required (as per respective manufacturer’s average coverage area) for various items of painting catered in CA in GE utility store. (e) Work executed upto 15 meter height, scaffolding and other necessary equipment included in quoted rate. (f) Removing of Nails, making good holes, cracks etc. (g) Work in patches and in narrow / widths, bands, windows, floors, fittings etc to protect them from spashers. (h) Washing floors, cleaning glass, joinery, electric fittings etc. Drops snd splashes of paint to be cleaned to the entire satisfaction of Engineer-in-Charge. (j) Sample patch of 10sqm be prepared considering all the item of periodicl and shall be got approved from GE prior to carrying okut further work. (k) item such as putty used for cracks filling will be paid and measured seperately. COMPENSATION FOR DELAY IN MOBILISATION OF T&P AND MATERIAL BEYOND 30 DAYS: In case of failure on the part of contractor to complete above mobilization within the stipulated period, compensation shall be recovered from the contractor at the rate of Rs. 1,000/- (Rupees one thousand only) per day subject to a maximum of Rs. 1,00,000/- (Rupees one lakh only). Condition 50 of IAFW-2249 (General Conditions of Contracts) shall be deemed amended accordingly. The contractor shall submit original Tax invoices & e-way bills for the entire quantity of materials so procured. The material and T&P collected shall be entered in the MB as “NOT TO BE ABSTRACTED” and shall be duly signed by both the parties. | ||||||||||||||
| 7.00 | Taking down cement plaster and raking out joints, hacking for key, scrubbing down with water built in cement mortar complete all as specified and directed. | 1,750 | Square Metre | 10 ₹17,500 Lowest | 15 ₹26,250 | 15 ₹26,250 | 11 ₹19,250 | 10 ₹17,500 Lowest | 10 ₹17,500 Lowest | 30 ₹52,500 | 10 ₹17,500 Lowest | 10 ₹17,500 Lowest | 10 ₹17,500 Lowest | 11 ₹19,250 |
| 8.00 | Material & Labour for Rendering 15 mm thick on fair faces of brick work or concrete surfaces in cement mortor 1:4 finished even and fair without using extra cement complete all as specified and directed.
Note:- Plaster shall be done using yamuna sand / black sand. | 500 | Square Metre | 150 ₹75,000 | 155 ₹77,500 | 148 ₹74,000 | 225 ₹1,12,500 | 140 ₹70,000 Lowest | 145 ₹72,500 | 180 ₹90,000 | 150 ₹75,000 | 140 ₹70,000 Lowest | 300 ₹1,50,000 | 222 ₹1,11,000 |
| 9.00 | Material & Labour for Ready Mix Plaster 15 mm thick on brick work or concrete surfaces in finished even and smooth without using extra cement complete all as specified and directed. Make:- Asian paint / Ultra tech/ Berger | 350 | Square Metre | 450 ₹1,57,500 | 480 ₹1,68,000 | 300 ₹1,05,000 | 350 ₹1,22,500 | 350 ₹1,22,500 | 350 ₹1,22,500 | 330 ₹1,15,500 | 180 ₹63,000 Lowest | 350 ₹1,22,500 | 300 ₹1,05,000 | 333 ₹1,16,550 |
Tender Value
₹45 L
EMD Value
₹90,000
Closing Date
25 Feb 2026, 6:00 pmClosed
GE UTILITY AMBALA
GE UTILITY AMBALA CANTT 133001
SMART PERIODICAL EXTERNAL AND INTERNAL AND MISC WORKS TO CERTAIN WATER SUPPLY AND SEWAGE INSTALLATIONS UNDER GE U AMBALA
2026_MES_750224_1
CA NO GE U AMB 76 OF 2025-26
Open Tender
Civil Works
Item Rate
240 days
GE UTILITY AMBALA CANTT
AS PER TENDER DOCUMENTS
8 documents required · 8 mandatory
₹500
GE UTILITY AMBALA CANTT
₹90,000
23 Mar 2026
3 Feb 2026
27 Feb 2026
3 Feb 2026
25 Feb 2026
18 Feb 2026
3 Feb 2026 - 10 Feb 2026
Material & Labour for complete removal of existing treatment internal as well as external or ceiling of building and soffits of Over Head Tank including installations of GE Utility by scrapping with mechanical wall sander (having mechanical vacuum mechanism) having RPM not less than 1500, sanding pad of 80 Grit having dia of 7"/9" to make the surface free from dust, loose paint etc. by skilled labour complete all as specified and directed.
Material & Labour for applying One coat of white cement based water proof wall care putty to give smooth and even surface on old as well as new plastered, old brick pattern finish wall surface and Over head tank including installations of GE Utility including sand papering the puttied surfaces to form an even and smooth surface complete all as specified and directed.
Material & Labour for preparation of puttied surfaces and applying two coats of 100% permium acrylic emulsion paint having VOC less than 50gm /litre and UV resistance as per IS15489:2004, Alkali, & fungal resistance, dirt resistance exterior paint of required shade (company Depot Tinted) with silicon additives @ 1.43 litre/10sqm over and including priming coat of exterior primer applied @0.90 litre/ 10sqm per coat of weather proof exterior emulsion paint over new plastered or unplastered and old plastered/ unplastered surfaces of Over head tank and installations of GE utility to be applied with fully automatic airless spray machine with a flow speed of min 1 ltr per minute having a pressure of 3300 PSI, by allowing 6-8 hrs to dry the surface for painting of subsequent coats complete all as specified and directed. Make:-Weather coat long life WL 300 in berger / Apex ultima protek PU Serum Asian Paints or equivalent manufacturer as approved by GE.
Material & Labour for applying two coats of oil bound distemper over a coat of alkali resistant primer over new plastered or unplastered and old plastered/ unplastered surface using Airless spray technology with max working pressure of 3300 PSI and capable of operating single spray gun with a max material hose length of 30 mtr the spray machine should be of reputed manufacturer with pro guard technology and capability of tracking pressure and paint usage and certified by paint manufacturer and as mentioned in PS and accessories for applying distemper/ primer should be able to spray in hard to reach areas and penetration of distemper on the surface complete all as specified and directed. Make:- Bison acrylic distemper in Berger, Lustre interior wall finish in Asian Paints or equivalent manufacturer as approved by GE.
Material & Labour for applying one coats of 100% permium acrylic emulsion paint having VOC less than 50gm /litre and UV resistance as per IS15489:2004, Alkali, & fungal resistance, dirt resistance exterior paint of required shade (company Depot Tinted) with silicon additives @ 1.43 litre/10sqm over and including priming coat of exterior primer applied @0.90 litre/ 10sqm per coat of weather proof exterior emulsion paint over and including priming coat of exterior primer over old rough plastered surfaces to be applied with fully automatic airless spray machine with a flow speed of min 1 ltr per minute having a pressure of 3300 PSI, by allowing 6-8 hrs to dry the surface for painting of subsequent coats complete all as specified and directed. Make:- Weather coat long life WL 300 in berger / Apex ultima protek PU Serum Asian Paints or equivalent manufacturer as approved by GE.
Material & Labour for applying two coats of 100% permium acrylic emulsion paint having VOC less than 50gm /litre and UV resistance as per IS15489:2004, Alkali, & fungal resistance, dirt resistance exterior paint of required shade (company Depot Tinted) with silicon additives @ 1.43 litre/10sqm over and including priming coat of exterior primer applied @0.90 litre/ 10sqm per coat of weather proof exterior emulsion paint over new existing rough plastered surfaces to be applied with fully automatic airless spray machine with a flow speed of min 1 ltr per minute having a pressure of 3300 PSI, by allowing 6-8 hrs to dry the surface for painting of subsequent coats complete all as specified and directed. Make:- Weather coat long life WL 300 in berger / Apex ultima protek PU Serum Asian Paints or equivalent manufacturer as approved by GE.
Notes for Periodical services: MOBILISATION OF T&P AND MATERIAL: The Contractor shall complete the following activities within 20 days from the date of commencement of work: (a) Submission of Memorandum of Understanding (MOU) with any of paint manufacturer. (b) Obtaining approval of paints & authorized applicator of paints manufacturer from GE. (c) Procurement of T&P required for mechanical mode of painting. (d) 30% of the quantity of Paints, Primer & Putty required (as per respective manufacturer’s average coverage area) for various items of painting catered in CA in GE utility store. (e) Work executed upto 15 meter height, scaffolding and other necessary equipment included in quoted rate. (f) Removing of Nails, making good holes, cracks etc. (g) Work in patches and in narrow / widths, bands, windows, floors, fittings etc to protect them from spashers. (h) Washing floors, cleaning glass, joinery, electric fittings etc. Drops snd splashes of paint to be cleaned to the entire satisfaction of Engineer-in-Charge. (j) Sample patch of 10sqm be prepared considering all the item of periodicl and shall be got approved from GE prior to carrying okut further work. (k) item such as putty used for cracks filling will be paid and measured seperately. COMPENSATION FOR DELAY IN MOBILISATION OF T&P AND MATERIAL BEYOND 30 DAYS: In case of failure on the part of contractor to complete above mobilization within the stipulated period, compensation shall be recovered from the contractor at the rate of Rs. 1,000/- (Rupees one thousand only) per day subject to a maximum of Rs. 1,00,000/- (Rupees one lakh only). Condition 50 of IAFW-2249 (General Conditions of Contracts) shall be deemed amended accordingly. The contractor shall submit original Tax invoices & e-way bills for the entire quantity of materials so procured. The material and T&P collected shall be entered in the MB as “NOT TO BE ABSTRACTED” and shall be duly signed by both the parties.
Taking down cement plaster and raking out joints, hacking for key, scrubbing down with water built in cement mortar complete all as specified and directed.
Material & Labour for Rendering 15 mm thick on fair faces of brick work or concrete surfaces in cement mortor 1:4 finished even and fair without using extra cement complete all as specified and directed. Note:- Plaster shall be done using yamuna sand / black sand.
Material & Labour for Ready Mix Plaster 15 mm thick on brick work or concrete surfaces in finished even and smooth without using extra cement complete all as specified and directed. Make:- Asian paint / Ultra tech/ Berger
Material & Labour for 10 mm thick rendering on other than fair faces of brick or concrete surfaces in CM 1:6 finished even and smooth without using extra cement complete all as specified and directed. Note:- Plaster shall be done using yamuna sand/ black sand.
Material & Labour for rough cast plaster with and including 15 mm thick rendering in cement mortor 1:3 on brick wall or concrete surfaces as specified in clause 14.22 of SSR Part -I complete all as specified and directed.
Supply only liquid water proofing compound ISI marked complete all as specified and directed.
Dismantling of floor hearth or wall tiling including cement mortar bedding but not backing and removing serviceable tiles to store yard and rubbish off the premises complete all as specified and directed.
Material & Labour for Non-skid joint free coloured ceramic tiles 7 to 8 mm thick, area of each tile exceeding 0.11 sqm but not exceeding 0.18sqm, as in floor set and jointed in neat cement slurry and pointed in white cement mixed with colouring pigment to match colour of tiles over and including 15mm thick screed bed of CM 1:6 complete all as specified and directed.
Supply & Fix of glazed ceramic coloured printed tiles of size 450 x 300X 7- 8 mm as in dado set and jointed in neat cement slurry & pointed in white cement mixed with pigment to match with colour of tiles over and including 10 mm thick rendering in cement motor 1:3 complete all as specified and directed.
Material and labour for Vitrified tiles flooring with Light shade 10 mm thick (Square / rectangular), tiles, area of each tile exceeding 0.36 sqm but not exceeding 0.72 sqm, set and jointed in neat cement slurry and pointed in white or coloured cement to match colour of tiles over and including 15 mm thick screed bed in CM (1:6) complete all as specified and directed.
Material and labour for Vitrified tile skirting/dado, light shade with 10 mm thick tiles of area of each tile exceeding 0.18 sqm but not exceeding 0.36 sqm, on vertical rates as in skirting, dado, etc., set and jointed in neat cement slurry and pointed in white or coloured cement to match colour of tiles over and including backing coat of 10 mm thick CM 1:3 complete all as specified and directed.
Material & Labour for Metal false ceiling consisting of 600mmX600mm, 5mm(+ 0.25) thick embossed false ceiling sheet of density 600 Kg/Cbm manufactured by an ISO-9001-2015 certified company, used as panel insert in a frame work made using anodised aluminium T-section of sizes 1" x1" (25mmX25mm,1mm thick) in square pattern of grid sizes of 2'X2' (600mmX600mm). The aluminium framework is supported from the ceiling with the help of 'J' hook and G.I. wire / 4mm MS rods at every 1meter interval of required sizes to maintain proper level etc. The aluminium frame work is supported on the side wall with the use of aliminium L- Section of size 1"X1" (25mmX25mm, 1mm thick) Angles etc. including dismantling the existing complete all as specified and directed.
Demolition of Unreinforced Cement Concrete in ground floors and pavings n exc 15 cm thickness (below or above ground level) complete all as specified and directed.
Hardcore of gauge n exc 63mm, deposited, spread and levelled in layers n exc 15cm thick, watered and rammed to a true surface complete all as specified and directed.
Material & Labour for 75 mm thick PCC 1:4:8 Type D–2 using 40mm graded crushed stone aggregate as in sub base of floor/ hard standing etc and finished even and fair without using extra cement complete all as specified and directed.
Material & Labour for 60mm thick (M-35 grade concrete) machine pressed precast concrete interlocking paver block of approved design and shape confirming to IS 15658-2006 with a crushing strength not less than 250 kg/sqmm with grey cement and pigment laid over 25mm thick sand cushioning complete all as specified and directed. Note:- Sand cushioning will be measured and paid seperately.
Material & Labour for sand cushioning layer of 25mm thick under interlocking tiles complete all as specified and directed.
Material & Labour for Providing cement concrete in edges Type B1 1:2:4 using 20 mm Graded Aggregate in roof kerbs or mud stops, rounded or chamfered on edges complete all as specified and directed.
Dismantling of brick work built in cement mortar of any description etc complete all as specified and directed.
Material and labour for brick work in small patches over boundary wall with sub class `B` brick old size in CM 1:4 straight or curved on plan exc 6m mean radious complete all as specified and directed.
Material & Labour for dressing of ground by cutting / removing vegetation, scrapping, clearing of all grass, shrubs, bushes, weeds, trees and saplings not exceeding 30cm in girth (measured at a height of 1m above the ground level) on either side of building or low laying area, aprons and other places in alpha power house area by deploying jungle jims (06 feet) with tractors, and level the ground as per natural ground slope operators including fuel, lubricant, etc. complete all as specified and directed.
Cleaning, removing all scale and dirt, boulders, grass, vegetation of any size etc, from drain and from mouths of circulating pipes, etc incl removing the same upto 50m and spreading or level with the exesiting ground complete all as specified and directed.
Material & Labour for removing existing 60/80 mm thick coloured precast concrete interlocking paver block of any shape including demolition of PCC and relaying the same with cement concrete 1:2:4 type B1 using 20mm graded mechanically crushed stone aggregate 75mm thick and rubber moulded M-35 grade paver block retrived from dismantling with grey cement and pigment to match, over and including 25 mm thick sand cushion complete all as specified and directed.
Uprooting scrubs/plant/flora & fauna on wall girth not exceeding 100mm from brick wall by cutting holes into masonry/walls for digging out roots and dosing Sulfuric/Phenolic Acid as per manufacturer's instruction to burn deep rooted tree roots and making good the disturbed area with cement mortar in CM 1:3 using water proofing compound including necessary scaffolding upto a height of 20 metre complete all as specified and directed. Note :- (i) Scaffolding incl quoted rate. (ii) Plastered paid separetely. (iii) Brickwork required qty shall be paid separetely. (iv) Any type of tree on walls and on roof including peepal tree.
Material & Labour for Preparing old painted steel surfaces of any description not otherwise described over 10 cm width or girth and applying one coat of synthetic enamel paint complete all as speciied and directed. Make : Nerolac - Synthetic enamel high gloss/ asian - apcolite premium/ Berger - luxol high Gloss.
Providing and applying plaster of paris putty of as required thickness over plastered or unplastered surface to prepare the surface even and smooth complete all as specified and directed.
Material and labour for cutting and uprooting of small tree roots and unwanted vegetation on roof and wall surfaces by digging safely on concrete roof or brick wall and pouring acid or approved chemical to aviod further growth of roots and making good the surfaces by filling cracks and distured portion by cement mortar (1:3) complete all as specified and directed.
Note:- Amount of credit of Rs. 7900.00 for retrieved materials is mentioned in Schedule of Credit of tender documents in pdf form which will be deducted offline while acceptance of tender.
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.99 MB
Tender.pdf
Tender Documents • 0.64 MB
BOQ_841187.xls
BOQ • 1.18 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .