Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.7 LAccepted-AOC | ₹9.7 L | L1 | Accepted-AOC Lowest bidder |
| 2 | L2₹9.8 L+₹9,600.50 (0.99%)Rejected-AOC NULL | ₹9.8 L+₹9,600.50 (0.99%) | L2 | Rejected-AOC 2 nd Lowest |
| 3 | L3₹10.5 L+₹85,320.50 (8.82%)Rejected-AOC KUPPOL PERINGOME PO 670353 | PERINGOME | KANNUR | KERALA | 670353 | ₹10.5 L+₹85,320.50 (8.82%) | L3 | Rejected-AOC 3 rd Lowest |
| 4 | L4₹11.2 L+₹1.6 L (16.2%)Rejected-AOC | ₹11.2 L+₹1.6 L (16.2%) | L4 | Rejected-AOC 4 th Lowest |
| 5 | L5₹11.7 L+₹2.0 L (21.0%)Rejected-AOC | ₹11.7 L+₹2.0 L (21.0%) | L5 | Rejected-AOC 5 th Lowest |
Tender Value
₹16.6 L
EMD Value
₹41,508
Closing Date
2 Aug 2023, 5:00 pmClosed
Executive Engineer
Executive Engineer Pambar Projects Division Pala Koothattukulam
Investigation Work
2023_Irrig_589208_1
IRR/PII/TR/2247/2022_3_1_1/1
Open Tender
Civil Works - Others
Item Rate
180 days
Lowerchattamunnar
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
₹41,508
Yes
25 Aug 2023
24 Jul 2023
4 Aug 2023
24 Jul 2023
2 Aug 2023
24 Jul 2023
Amount
Investigation Survey
60.11.1:FIXING TBM- Supplying and fixing TBM with RCC 1:1.5:3 pillar block having a size of 30*30*75 cm, steel reinforcement for RCC work, painting top and sides of pillar with synthetic enamel paint, lettering in the pillar block with 8cm high "TBM" on one face and the reduced level on the outer face, etc complete, fixed in CC1:3:6 using 40 mm metal 55*55*60 cm etc complete and centering and shuttering including strutting , propping and removal of form work for pillar and foundation.
60.11.2:Taking FLY LEVELS- from the nearest GTS BM and closing on the starting BM including conveyance of instruments etc along road or in heavily built up area or in roads with heavy traffic or in thick jungle ( out turn 4000 m / day )
OD12307/2023-2024:Conducting topographic survey in river at difficult condition such as Presence of big rocks and boulders ,presence of Steep slopes ,high depth,presence of surface currents and under currents and shallow depth with slushy bed. for taking cross sections at suitable intervals and preparing contour maps showing 2m interval contours using Total station or such approved methods showing all topographic features like culverts and crossings ,survey stones and other permanent objects and the preparation and submission of maps at suitable scale ( plan , cross sections ,longitudinal sections etc),indicating the contour lines 2m interval in digitized forms including supplying 6 numbers of soft copies CD/DVD ,6 numbers of hard copies of print outs etc complete as per the direction of departmental officers at site (outturn 3hect /day)
OD11826/2023-2024:Conducting topographic survey in banks of river at difficult condition /hilly terrain for taking cross sections at suitable intervals and preparing contour maps showing 2m interval contours using Total station or such approved methods showing all topographic features like culverts and crossings ,survey stones and other permanent objects and the preparation and submission of maps at suitable scale ( plan , cross sections ,longitudinal sections etc),indicating the contour lines 2m interval in digitized forms including supplying 6 numbers of soft copies CD/DVD ,6 numbers of hard copies of print outs etc complete as per the direction of departmental officers at site (outturn 2 hect /day)
OD12339/2023-2024:Conducting topographic survey in Ayacut area for taking cross sections at suitable intervals and preparing contour maps showing 2m interval contours using Total station or such approved methods showing all topographic features like culverts and crossings ,survey stones and other permanent objects and the preparation and submission of maps at suitable scale ( plan , cross sections ,longitudinal sections etc),indicating the contour lines 2m interval in digitized forms including supplying 6 numbers of soft copies CD/DVD ,6 numbers of hard copies of print outs etc complete as per the direction of departmental officers at site (outturn 6 hect /day)
56.14.a:Cross sectional details - River.
56.14.b:Cross sectional details - Thodu.
56.15.a:Hydraulic Velocity Calculation - River.
56.15.b:Hydraulic Velocity Calculation - Thodu.
G S Infrastructure
MOHANAN P
VINAYA KRISHNAN
SALMANUL FARIS
GOPINATHAN P
Shear Investo
Bidder Name
GOPINATHAN P
MOHANAN P
G S Infrastructure
SALMANUL FARIS
Shear Investo
Paul Alias
VINAYA KRISHNAN
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_871551.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .