| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹4.0 CrAccepted-AOC | ₹4.0 Cr | 1 | Accepted-AOC L1 |
| 2 | 2₹4.1 Cr+₹13.8 L (3.46%)Rejected-Finance | ₹4.1 Cr+₹13.8 L (3.46%) | 2 | Rejected-Finance L2 |
| 3 | 3₹4.1 Cr+₹16.5 L (4.15%)Rejected-Finance KOOTAPPURAKKAL HO POTTA KUMBALACODE PO PAZHAYANNUR 680587 THRISSUR | PAZHAYANNUR | THRISSUR | KERALA | 680587 | ₹4.1 Cr+₹16.5 L (4.15%) | 3 | Rejected-Finance L3 |
| 4 | 4₹4.5 Cr+₹48.7 L (12.2%)Rejected-Finance | ₹4.5 Cr+₹48.7 L (12.2%) | 4 | Rejected-Finance L4 |
| 5 | 5₹4.6 Cr+₹63.7 L (16.0%)Rejected-Finance | ₹4.6 Cr+₹63.7 L (16.0%) | 5 | Rejected-Finance L5 |
| Sl No | Description | Qty | Unit | Dhileesh. C L4 | k k constructions L2 | K.P.JOY L5 | P P JAYAPRAKASH L1 | K.M.ABBAS L3 |
|---|---|---|---|---|---|---|---|---|
| 1.00Appendix - A Construction of Regulator | ||||||||
| 1.00 | 2.4.2.A:Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres Cement Concrete Grade M-15 & M-20 - By Mechanical Means | 171.25 | cum | 880 ₹1,50,701.76 | 650 ₹1,11,313.8 Lowest | 714 ₹1,22,273.93 | 800 ₹1,37,001.6 | 813.03 ₹1,39,233.01 |
| 1.00 | 2.4.2.B:Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres Prestressed / reinforced cement concrete grade M-20 & above - By Mechanical Means | 67.17 | cum | 1,763 ₹1,18,420.71 | 1,580 ₹1,06,128.6 | 1,224 ₹82,216.08 Lowest | 1,590 ₹1,06,800.3 | 1,627.62 ₹1,09,327.24 |
| 1.00 | 2.4.4.B:Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres Dismantling Stone Masonry - Rubble stone masonry in cement mortar. | 10 | cum | 911 ₹9,110 | 820 ₹8,200 | 714 ₹7,140 Lowest | 820 ₹8,200 | 840.95 ₹8,409.5 |
| 1.00 | OD28659/2024-2025:Construction of coffer dam for the construction of RCB with required breadth and height, maintaining the cofferdam during construction and removing after construction etc complete (contractor should submit the working drawing with necessary details of cofferdam and get approval of Engineer in charge before construction.All provisions included for water free working space should be incorporated.No addtitional amount will be entertained ) | 44 | metre | 10,001 ₹4,40,044 | 12,000 ₹5,28,000 | 6,120 ₹2,69,280 Lowest | 9,020 ₹3,96,880 | 7,851.63 ₹3,45,471.72 |
| 1.00 | OD28663/2024-2025:Bailing out water using pump above 5 HP and Up to 10 HP-Bailing out water with engine
and pump set above 5HP and up to 10HP, including conveyance to site and erection,cost of fuel, lubrication
oil and other stores, pay of staff etc complete
1 Day | 2,700 | hour | 612 ₹16,52,400 | 480 ₹12,96,000 Lowest | 714 ₹19,27,800 | 553 ₹14,93,100 | 553.65 ₹14,94,855 |
| 1.01 | OD28653/2024-2025:Bailing out water using pump above 10 HP and up to 20 HP -Bailing out water with
engine and pump set above 10 hp and up to 20hp ,including conveyance to site and erection, cost of fuel ,lubrication oil and other stores,pay of staff etc complete. as per 60.2.4 OD Irrigation | 1,800 | hour | 485 ₹8,73,000 | 600 ₹10,80,000 | 714 ₹12,85,200 | 450 ₹8,10,000 Lowest | 693.13 ₹12,47,634 |
| 1.01 | 12.1.B.1:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Ordinary Soil - Depth upto 3m - Mechanical Means | 4,178.65 | cum | 90 ₹3,76,078.32 | 100 ₹4,17,864.8 | 306 ₹12,78,666.29 | 81 ₹3,38,470.49 Lowest | 82.78 ₹3,45,908.48 |
| 1.01 | 12.1.B.2:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, removal of stumps and other deleterious matter, only for dressing of sides and bottom and backfilling with approved material. <br> Ordinary Soil - Depth 3 M to 6 M- Mechanical Means<br> | 428.86 | cum | 102 ₹43,743.52 | 150 ₹64,328.7 | 306 ₹1,31,230.55 | 100 ₹42,885.8 | 94.63 ₹40,582.83 Lowest |
| 1.01 | 12.1.B.3:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. <br> Ordinary soil - Depth above 6 M. - Mechanical Means<br> | 291.95 | cum | 134 ₹39,120.76 | 500 ₹1,45,973 | 306 ₹89,335.48 | 140 ₹40,872.44 | 124.1 ₹36,230.5 Lowest |
Tender Value
₹4.5 Cr
EMD Value
₹1 L
Closing Date
26 Nov 2025, 11:00 amClosed
Chief Engineer, KIIDC
Kerala Irrigation Infrastructure Development Corporation Ltd., Ground Floor, KWA Campus, Vellayambalam, Thiruvananthapuram
Construction of Rugulator cum Bridge at Muttikkal Attathara Road in Kottappuram Vllage across Wadakkanchery river SH5 in Muttikkal of Thalappally Taluk in Thrissur District
2025_KIIDC_818811_1
IRR/KIIDC/TR/7930/2024_5_1_1/1
Open Tender
Civil Works - Others
Item Rate
540 days
Muttikkal
Please refer tender document
4 documents required · 4 mandatory
₹9,759
₹1 L
17 Mar 2026
4 Nov 2025
29 Nov 2025
4 Nov 2025
26 Nov 2025
4 Nov 2025
Work Name:KIIFB-Construction of Regulator Cum Bridge at Muttikkal-Attathara road in Kottappuram village across Wadakkanchery river-Connecting SH-50 in Muttikkal of Thalappilly taluk in Thrissur District-General Civil Work
With Batching Plant, Transit Mixer and Concrete Pump Ì12.4:Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.ÛOD28655/2024-2025:DR Packing under foundation- dry stone packing under foundation with departmental stone including conveyance of material and labour charge etc complete as per direction of departmental officers at siteÔOD34518/2025-2026:Providing and laying of Filter media with departmental stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification.éOD28661/2024-2025:Providing & making Gabion structure with departmental stone Mechanically Woven Double Twisted Hexagonal Shaped Wire mesh Gabion Boxes as per IS 16014:2012,MORTH Clause 2500, of required size, Mesh Type 10x12(D=100 mm with tolerance of ± 2%) Zinic+PVC coated, Mesh wire diameter2.7/3.7mm, mechanically edged/selvedged with partitions at every 1m interval and shall have minimum 10 numbers of openings per meter of mesh perpendicular to twist, tying with lacing wire of diameter 2.2/3.2mm(ID/OD), supplied @3% by weight of Gabion boxes, filled with boulders with least dimension of 200 mm, as per drawing, all complete as per directions of Engineer-in-charge. Details cost of one Gabion box/Crates of size 2mx1mx1m = 2 cumÈ13.5.E.p.2:Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications RCC Grade M20 - With Batching Plant, Transit Mixer and Concrete Pump - Height upto 5m È13.5.F.P.2:Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications RCC Grade M25 - With Batching Plant, Transit Mixer and Concrete Pump - Height upto 5m Ê13.5.E.q.2:Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications RCC Grade M20 - With Batching Plant, Transit Mixer and Concrete Pump - Height 5m to 10m É13.5.C.q.2:Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specification PCC Grade M25 - using Batching Plant, Transit Mixer and Concrete Pump - Height 5m to 10m·14.1B.2:Furnishing and Placing Reinforced Cement Concrete Grade M25 Using Batching Plant, Transit Mixer and Concrete Pump in super-structure as per drawing and Technical Specificationº14.1B.1.1.B:Furnishing and Placing Reinforced Cement Concrete Grade M25 Using Concrete Mixer as per drawing and Technical Specification. For solid slab super-structure - Height 5m to 10m12.40:Supply, Fitting and Placing un- coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical SpecificationsMT13.6:Supplying, fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and Technical Specifications14.2:Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specificationsi14.7:Construction of RCC railing of M30 Grade in-situ with 20 mm nominal size aggregate, true to line and grade, tolerance of vertical RCC post not to exceed 1 in 500, center to center spacing between vertical post not to exceed 2000 mm, leaving adequate space between vertical post for expansion, complete as per approved drawings and technical specifications.RMH14.9:Drainage Spouts complete as per drawing and Technical specificationnosOD28660/2024-2025:Providing and laying of a strip seal expansion joint catering to maximum horizontal movement up to 70 mm, complete as per approved drawings and standard specifications to be installed by the manufacturer/supplier or their authorized representative ensuring compliance to the manufacturer's instructions for installation (14.22)<br><br>OD6007/2025-2026: Finishing walls with water proofing cement paint of required shade: New work (Two or more coats applied @ 3.84 kg/10 sqm) sqm14.4:Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications.ñOD28658/2024-2025:FRP SHUTTERS - Supplying and fixing FRP Channels of "C" profile and sill beam size 100x100x100 mm with flange of 50 to 75mm depth in the grooves already arranged and as per the direction of departmental .officers.*OD28657/2024-2025:FRP SHUTTERS - Supplying and fixing FRP shutters of suitable size to with stand the design and max water pressure as prescribed by the departmental officer and installing the FRP channels provided in the grooves already arranged and as per the direction of departmental .officers. Appendix B- Side ProtectionßOD34520/2025-2026:Construction of coffer dam for the construction of the side protection with required breadth and height, maintaining the cofferdam during construction and removing after construction etc complete (contractor should submit the working drawing with necessary details of cofferdam and get approval of Engineer in charge before construction.All provisions
畬敤潦慷整牦敥眠牯楫杮猠慰散猠潨汵敢椠据牯潰慲整潎愠摤楴楴湯污愠潭湵⁴楷汬戠湥整瑲楡敮⤠䑏㠲㔶⼲〲㐲㈭㈰㨵慂汩湩畯⁴慷整獵湩異灭愠潢敶㔠䠠⁐湡灕琠〱䠠ⵐ慂汩湩畯⁴慷整楷桴攠杮湩愊摮瀠浵⁰敳⁴扡癯䠵⁐湡灵琠〱偈湩汣摵湩潣癮祥湡散琠楳整愠摮攠敲瑣潩Ɱ潣瑳漠畦汥畬牢捩瑡潩൮漊汩愠摮漠桴牥猠潴敲ⱳ瀠祡漠瑳晡瑥潣灭敬整‱慄桹㈱ㄮ㈮䈮䔺牡桴眠牯湩攠捸癡瑡潩景映畯摮瑡潩景猠牴捵畴敲獡瀠牥搠慲楷杮愠摮琠捥湨捩污猠数楣楦慣楴湯湩汣摵湩敳瑴湩畯ⱴ挠湯瑳畲瑣潩景猠潨楲杮愠摮戠慲楣杮敲潭慶景猠畴灭湡瑯敨敤敬整楲畯慭瑴牥牤獥楳杮漠楳敤湡潢瑴浯愠摮戠捡晫汩楬杮眠瑩灡牰癯摥洠瑡牥慩传摲湩牡⁹潒正⠠潮⁴敲畱物湩汢獡楴杮⤠ⴠ䐠灥桴甠⁰潴㌠洠ⴠ䴠捥慨楮慣敍湡´伀㉄㘸ㄵ㈯㈰ⴴ〲㔲债䍖圠䕅⁐佈䕌ⵓ倠潲楶楤杮眠敥⁰潨敬獵湩㔷浭搠慩噐⁃楰数潷歲湩牰獥畳敲欴猯浣椠据畬楤杮挠獯⁴景洠瑡牥慩獬潣癮祥湡散慬潢牵挠慨杲獥攠捴潣灭敬整ᨮ䄠灰湥楤⁸ⵃ䄠灰潲捡潒摡⸲⸸⹁㨱汐楡⽮敒湩潦捲摥䌠浥湥⁴潃据敲整椠灏湥䘠畯摮瑡潩潣灭敬整愠数牄睡湩湡敔档楮慣灓捥晩捩瑡潩獮倠䍃䜠慲敤䴠㔱贠㌱㔮䄮债慬湩刯楥普牯散散敭瑮挠湯牣瑥湩猠扵猭牴捵畴敲挠浯汰瑥獡瀠牥搠慲楷杮愠摮吠捥湨捩污匠数楣楦慣楴湯䍐⁃片摡ㅍ‵效杩瑨甠瑰洵�⸳㘱䌺湯瑳畲瑣潩景攠扭湡浫湥⁴楷桴愠灰潲敶慭整楲污漠瑢楡敮牦浯戠牯潲⁷楰獴眠瑩污楬瑦湡敬摡ⱳ琠慲獮潰瑲湩潴猠瑩ⱥ猠牰慥楤杮牧摡湩潴爠煥極敲汳灯湡潣灭捡楴杮琠敭瑥爠煥極敲敭瑮漠慴汢〳ⴰ⸲í㌀ㄮ㨸潃獮牴捵楴湯漠畳ⵢ牧摡湡慥瑲敨桳畯摬牥楷桴愠灰潲敶慭整楲污漠瑢楡敮牦浯戠牯潲⁷楰獴眠瑩污楬瑦…敬摡ⱳ琠慲獮潰瑲湩潴猠瑩ⱥ猠牰慥楤杮牧摡湩潴爠煥極敲汳灯湡潣灭捡整潴洠敥⁴敲畱物浥湥⁴景琠扡敬丠㌠〰㈭ŝ㐀㈮䄮ㄮ䌺湯瑳畲瑣潩景朠慲畮慬畳ⵢ慢敳戠⁹牰癯摩湩牧摡摥洠瑡牥慩ⱬ猠牰慥楤杮椠湵晩牯慬敹獲眠瑩潭潴牧摡牥漠牰灥牡摥猠牵慦散業楸杮戠⁹業⁸湩瀭慬散洠瑥潨楷桴爠瑯癡瑡牯愠⁴䵏ⱃ愠摮挠浯慰瑣湩楷桴愠瘠扩慲潴祲爠汯敬潴愠档敩敶琠敨搠獥物摥搠湥楳祴潣灭敬整愠数汣畡敳㐠片摡湩ⵧ䥉⁉䘭牯氠睯牥猠扵戭獡楍⁸湩倠慬散䴠瑥潨ɔ㐀㤮䄮㈮场瑡牥䈠畯摮䴠捡摡浡ⴠ䜠慲楤杮䤭ⴠ唠楳杮匠牣敥楮杮䌠畲桳扡敬琠灹獥猠捵獡䴠潯畲牯䜠慲敶祂䴠湡慵敍湡牐癯摩湩Ⱨ氠祡湩Ⱨ猠牰慥楤杮愠摮挠浯慰瑣湩瑳湯条牧来瑡獥漠灳捥晩捩猠穩獥琠慷整潢湵慭慣慤灳捥晩捩瑡潩湩汣摵湩灳敲摡湩湩愠甠楮潦浲琠楨正敮獳慨摮瀠捡楫杮潲汬湩楷桴㌠眠敨汥摥猠整汥 楶牢瑡牯⁹潲汬牥㠠ㄭ‰潴湮獥椠瑳条獥琠桴牰灯牥朠慲敤愠摮挠浡敢Ⱳ愠灰祬湩湡牢潯業杮爠煥極楳整琠灹景猠牣敥楮杮 楢摮湩慍整楲污潴映汩灵琠敨椠瑮牥瑳捩獥漠潣牡敳愠杧敲慧整慷整楲杮愠摮挠浯慰瑣湩潴琠敨爠煥極敲敤獮瑩ⴠ唠楳杮匠牣敥楮杮吠灹ⵥ⁁ㄨ⸳洲条�⸵⸹⸱㩡牐癯摩湩Ⱨ氠祡湩湡潲汬湩景漠数牧摡摥瀠敲業⁸畳晲捡湩景㈠‰浭琠楨正敮獳挠浯潰敳景ㄠ⸳′浭琠⸵‶浭愠杧敲慧整獵湩楖捳獯瑩⁹片摡慰楶杮䈠瑩浵湥 䝖ⴠ〳 潴琠敨爠煥極敲楬敮牧摡ⱥ愠摮氠癥汥
With Batching Plant, Transit Mixer and Concrete Pump Ì12.4:Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.ÛOD28655/2024-2025:DR Packing under foundation- dry stone packing under foundation with departmental stone including conveyance of material and labour charge etc complete as per direction of departmental officers at siteÔOD34518/2025-2026:Providing and laying of Filter media with departmental stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification.éOD28661/2024-2025:Providing & making Gabion structure with departmental stone Mechanically Woven Double Twisted Hexagonal Shaped Wire mesh Gabion Boxes as per IS 16014:2012,MORTH Clause 2500, of required size, Mesh Type 10x12(D=100 mm with tolerance of ± 2%) Zinic+PVC coated, Mesh wire diameter2.7/3.7mm, mechanically edged/selvedged with partitions at every 1m interval and shall have minimum 10 numbers of openings per meter of mesh perpendicular to twist, tying with lacing wire of diameter 2.2/3.2mm(ID/OD), supplied @3% by weight of Gabion boxes, filled with boulders with least dimension of 200 mm, as per drawing, all complete as per directions of Engineer-in-charge. Details cost of one Gabion box/Crates of size 2mx1mx1m = 2 cumÈ13.5.E.p.2:Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications RCC Grade M20 - With Batching Plant, Transit Mixer and Concrete Pump - Height upto 5m È13.5.F.P.2:Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications RCC Grade M25 - With Batching Plant, Transit Mixer and Concrete Pump - Height upto 5m Ê13.5.E.q.2:Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications RCC Grade M20 - With Batching Plant, Transit Mixer and Concrete Pump - Height 5m to 10m É13.5.C.q.2:Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specification PCC Grade M25 - using Batching Plant, Transit Mixer and Concrete Pump - Height 5m to 10m·14.1B.2:Furnishing and Placing Reinforced Cement Concrete Grade M25 Using Batching Plant, Transit Mixer and Concrete Pump in super-structure as per drawing and Technical Specificationº14.1B.1.1.B:Furnishing and Placing Reinforced Cement Concrete Grade M25 Using Concrete Mixer as per drawing and Technical Specification. For solid slab super-structure - Height 5m to 10m12.40:Supply, Fitting and Placing un- coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical SpecificationsMT13.6:Supplying, fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and Technical Specifications14.2:Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specificationsi14.7:Construction of RCC railing of M30 Grade in-situ with 20 mm nominal size aggregate, true to line and grade, tolerance of vertical RCC post not to exceed 1 in 500, center to center spacing between vertical post not to exceed 2000 mm, leaving adequate space between vertical post for expansion, complete as per approved drawings and technical specifications.RMH14.9:Drainage Spouts complete as per drawing and Technical specificationnosOD28660/2024-2025:Providing and laying of a strip seal expansion joint catering to maximum horizontal movement up to 70 mm, complete as per approved drawings and standard specifications to be installed by the manufacturer/supplier or their authorized representative ensuring compliance to the manufacturer's instructions for installation (14.22)<br><br>OD6007/2025-2026: Finishing walls with water proofing cement paint of required shade: New work (Two or more coats applied @ 3.84 kg/10 sqm) sqm14.4:Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications.ñOD28658/2024-2025:FRP SHUTTERS - Supplying and fixing FRP Channels of "C" profile and sill beam size 100x100x100 mm with flange of 50 to 75mm depth in the grooves already arranged and as per the direction of departmental .officers.*OD28657/2024-2025:FRP SHUTTERS - Supplying and fixing FRP shutters of suitable size to with stand the design and max water pressure as prescribed by the departmental officer and installing the FRP channels provided in the grooves already arranged and as per the direction of departmental .officers. Appendix B- Side ProtectionßOD34520/2025-2026:Construction of coffer dam for the construction of the side protection with required breadth and height, maintaining the cofferdam during construction and removing after construction etc complete (contractor should submit the working drawing with necessary details of cofferdam and get approval of Engineer in charge before construction.All provisions
Work Name:KIIFB-Construction of Regulator Cum Bridge at Muttikkal-Attathara road in Kottappuram village across Wadakkanchery river-Connecting SH-50 in Muttikkal of Thalappilly taluk in Thrissur District-General Civil Work
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.05 MB
Tendernotice_2.pdf
PDF • 1.65 MB
Tendernotice_3.pdf
PDF • 8.62 MB
BOQ_1372450.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .