Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L2₹1.8 Cr+₹20.5 L (12.6%)Accepted-AOC SANTIPUKHURI H NO Q 8 MANGALDOI P O SANTIPUKHURI P S SIPAJHAR DIST DARRANG PIN 784144 | DARRANG | ASSAM | 784144 | ₹1.8 Cr+₹20.5 L (12.6%) | L2 | Accepted-AOC Work Order Issued |
| 2 | L1₹1.6 CrRejected-AOC BAMUNIMAIDAM MRD ROAD HOUSE NO 48 CITY GUWAHATI PO BAMINIMAIDAM PS NOONMATI DISTRICT KAMRUP METRO PIN 781021 | KAMRUP METRO | ASSAM | 781021 | ₹1.6 Cr | L1 | Rejected-AOC L2 |
| 3 | L2₹1.8 Cr+₹20.5 L (12.6%)Rejected-AOC HOUSE NO 20 BAGHARBARI VIDYANAGAR 2 PANJABARI GUWAHATI ASSAM 781037 | KAMRUP METRO | ASSAM | 781037 | ₹1.8 Cr+₹20.5 L (12.6%) | L2 | Rejected-AOC L2 |
| 4 | L2₹1.8 Cr+₹20.5 L (12.6%)Rejected-AOC WARD NO 1 P O P S BIJNI DIST CHIRANG PIN 783390 | CHIRANG | ASSAM | 783390 | ₹1.8 Cr+₹20.5 L (12.6%) | L2 | Rejected-AOC L2 |
| 5 | L2₹2.0 Cr+₹40.9 L (25.1%)Rejected-AOC | ₹2.0 Cr+₹40.9 L (25.1%) | L2 | Rejected-AOC L2 |
Tender Value
₹2.0 Cr
EMD Value
₹4.1 L
Closing Date
28 Nov 2023, 2:00 pmClosed
CE, PWD(Roads), Assam, Chandmari, Ghy-3
O/O The CE, PWD(Roads), Assam, Chandmari, Ghy-3
Package No. Udalguri/MMPNA/R_R/03 1) Repair and Rehabilitation of Bridge on Khalabari Andherighat Jayantipur Salmara Road (Bhergaon - Tangla) Part2 at Ch.21.408 km etc.....
2023_PWD_34035_12
CE/STBR/MMPNA/R_R/09/2023-24/1 Dated 29-09-2023
Open Tender
Civil Works – Roads
Item Rate
365 days
Udalguri
Please refer Tender documents.
5 documents required · 5 mandatory
₹4,078
₹4.1 L
Yes
4 Mar 2024
18 Nov 2023
29 Nov 2023
18 Nov 2023
28 Nov 2023
18 Nov 2023
18 Nov 2023 - 28 Nov 2023
Amount
Chipping of deteriorated concrete and removal of all loose & friable materials and fully exposing rusted reinforcement followed by proper cleaning and removing of rusts and other foreign materials using sand blasting/ emery cloths/ wire brush etc. including formwork as directed and specified by the department complete
Replacement of corroded reinforcement by cutting and welding new reinforcement of minimum 25mm dia. including lapping on both sides to the specified length as directed and as per relevant IS/IRC codes and cost of gas ,welding rods,higher charge of welding machines etc. including formwork as required.(Reinforcement to be measured and paid seperately)
Anticorrosive Treatment-'Supplying and applying two coats of zinc rich anti corrosive protective coating with nitozinc primer of fosroc /Floarm coat ZP or equivalent @0.20 Litre per sqm over thoroughly cleaned & prepared steel bar including formwork as directed and specified by the department complete
Bonding between old and new concrete surface-Supplying and applying Epoxy based bonding agent Nitobond EP of Fosroc Chemicals or Masterbrace 1414 of BASF /Rearmbond EBA or equivalent @ 0.50 Lit pe sqm after totally saturating the cleaned concrete surface with clean water for proper bonding of old and new concrete including formwork as specified and directed by the department complete.
Patching of damaged concrete surface with structural grade polymer modified reinstatement mortar to like Fosroc Renderoc S2 or equivalent at a thickness of 10 to 20mm as per instructions of manufacturer and as approved by the Engineer.The prepacked repair mortar should have a compressive strength 45N/mm²,Flexture strength 8 N/mm² at 28 Days.
Concreting of the structure with free flow nonshrink cementitious microconcrete with Renderoc RG of Fosroc or equivalent after proper mixing with cleanwater including formwork followed by proper curing for 28 days as per manufacturer's specifications complete and as directed by the Department .
Repair of joint Grooves with Epoxy Mortar Repair of spalled joint grooves of contraction joints, longitudinal joints and expansion joints in concrete pavements using epoxy mortar or epoxy concrete
Providing & fixing 16mm dia MS nozzles in a grid of 1m c/c up to the half of the thickness of the concrete structure.A grout slurry of neat cement & chloride free expanding grout cebex 100 of Fosroc Chemicals or Mastergrout CPG-1 of Choksey Chemicals/ Armgrout additive of Myk arment or Masterflow 150 of BASF or equivalent @ 0.5% by weight of cement water cement ratio 0.35 to 0.40 and viscosity not more than 1.02 centipoise with grouting pressure till the refusal of injection grout. . The grouting operation pressure shall be 2Kg/sq.cm.Cutting the exposed nozzle after the grouting with a good cutter to make the surface free from the grouting pipes and to seal the gap with plugging compound Masterplug of Choksey Chemicals as per the specification and the direction of the department complete including formwork.
Providing and inserting nipples with approved fixing compound after drilling holes for grouting as per Technical specifications including subsequent cutting/removal and sealing of the hole as necessary of nipples after completion of grouting with Cement/Epoxy.
Sealing of crack / porous concrete with Epoxy Grout by injection through nipples complete as per clause 2803.1.
Structural Strengthening with carbon Fibre Wrapping: Patching in depression of concrete surface wherever necessary by laying epoxy putty , Nitocote VF of Fosroc Chemicals or MasterBrace ADH 2200 of Base or equivalent @ 1 Lit per sqm after proper surface preparation and proper scraping of concrete protrusion as specified and directed by the department complete including formwork .
Structural Strengthening with carbon Fibre Wrapping: Applying Nitowrap 410 saturant Fosroc Chemicals or MasterBrace 4500 saturant of BASF or equivalent with wet film thickness @ 250 microns (0.27Lit per sqm) over a coat of saturant epoxy primer Nitowrap 30 of Fosroc Chemicals or MasterBrace 3500 of BASF or equivalent @ 0.11Lit per sqm with brush followed by fixing carbon fibre composite system Nitowrap EP (CF) of Fosroc Chemicals or MasterBrace fibers (CF) of BASF or equivalent by pressing on the saturant and and impregnate the same by applying a final coat of Nitowrap 410 saturant Fosroc Chemicals or MasterBrace 4500 saturant of BASF or equivalent as specified and directed by the department complete including formwork.
Structural Strengthening with carbon Fibre Wrapping: Applying two coats of UV resistant coating Nitowrap 512 of Fosroc Chemicals or MasterProtect of BASF or equivalent over fibre system having wet film thickness of 100 micron @ 0.11Lit per sqm as specified and directed by the department complete including formwork.
Providing and applying Deckguard E 2000 or Masterseal 878 of BASf or equivalent a High Performance Anticarbonation Protective Coating System, over the prime surface using an airless spray or roller at right angles to each other @ coverage of 5 Sqm per litre per coat @ 200 microns wft / 100 microns DFT with an intercoat period of minimum 12 hrs @ 35ºC. The coverage per litre for 2 coats shall be 2.5 Sqm @ 200 microns DFT. The protective coating system should have CO2 diffusion resistance not less than 240mm equivalent of air thickness and 60cm equivalent of 30N concrete along with a water vapour transmission resistance of less than 1.0 metre (Taywood method), the coating should have static crack accommodation of not less than 2mm (BRE) and adhesion greater than 1.0 N/mm² as per BS 1881.
Replacement of Expansion Joints complete as per drawings
Strip Seal Expansion Joint (Providing and laying of a strip seal expansion joint catering to maximum horizontal movement upto 70 mm, complete as per approved drawings and standard specifications to be installed by the manufacturer/supplier or their authorised representative ensuring compliance to the manufacturer's instruction for installation).
Dismantling of Cement Concrete Pavement (Dismantling of cement concrete pavement by mechanical means using pneumatic tools, breaking to pieces not exceeding 0.02 cum in volume and stock piling at designated locations and disposal of dismantled materials up to a lead of 1000metres ,stacking serviceable materials and unserviceable materials separately.)
Cement Concrete Pavement -- Construction of un-reinforced, dowel jointed, plain cement concrete pavement over a prepared sub base with 43 grade cement @ 400 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed with Recron 3S fibre of Reliance Industries Ltd. or its equivalent @ 0.125 Kg. per bag of cement mixed in a batching and mixing plant as per approved mixed design, transported to the site, laid with a fixed form or slip form paver, spread , compacted and finished in a continuous operation includuing provision of contraction, expansion, construction and longitudinal joints, joint filler, seperation membrane, sealent primer, sealent joint , debonding strips dowel bar, tie rod, admixured as approved, curing compopund, finishing to lines and grades as per drawing. (Including carriage up to initial lead of 5Km. from quarry and carriage of mixed materials up to 10.0 Km initial lead from mixing plant.) as diected by the Department complete at all levels.
Supplying, fitting and placing TMT IS:1786 (Fe 500) bar reinforcement in sub-structure complete as per drawing and technical specifications --Super Ductile (SD) TMT reinforcement bar of Fe-500 N/mm2
Replacement of damage concrete railing
Construction of RCC railing of M30 Grade in-situ with 20 mm nominal size aggregate, true to line and grade, tolurence of vertical RCC post not to exceed 1 in 500, centre to centre spacing between vertical post not to exceed 2000 mm, leaving adequat space between vertical posts for expansion, complete as per approved drawings and technical specifications.
Painting on concrete surface (Providing and applying 2 coats of water based cement paint to unplastered concrete surface after cleaning the surface of dirt, dust, oil, grease, efflorescence and applying paint @ of 1 litre for 2 Sq.m. ) B)For RCC Railing
Non-destuctive testing with Ultrasonic Pulse Velocity Meter with data storage facility for detection of cracks, voids and other imperfections in Reinforced concrete structures and furnishing the findings thereof in proper comprehensible format , complete as directed by the department.
Conducting Concrete Core tests of 75mm diacores, on concrete stucture, as per stipulated procedures, for determination the equivalent cube compressive strength, concrete of the structures including preparation and furnishing the report showing the findings thereof in proper comprehensible format , complete as directed by the department.
Chipping of deteriorated concrete and removal of all loose & friable materials and fully exposing rusted reinforcement followed by proper cleaning and removing of rusts and other foreign materials using sand blasting/ emery cloths/ wire brush etc. including formwork as directed and specified by the department complete
Bonding between old and new concrete surface-Supplying and applying Epoxy based bonding agent Nitobond EP of Fosroc Chemicals or Masterbrace 1414 of BASF /Rearmbond EBA or equivalent @ 0.50 Lit pe sqm after totally saturating the cleaned concrete surface with clean water for proper bonding of old and new concrete including formwork as specified and directed by the department complete.
Patching of damaged concrete surface with structural grade polymer modified reinstatement mortar to like Fosroc Renderoc S2 or equivalent at a thickness of 10 to 20mm as per instructions of manufacturer and as approved by the Engineer.The prepacked repair mortar should have a compressive strength 45N/mm²,Flexture strength 8 N/mm² at 28 Days.
Repair of joint Grooves with Epoxy Mortar Repair of spalled joint grooves of contraction joints, longitudinal joints and expansion joints in concrete pavements using epoxy mortar or epoxy concrete
Providing & fixing 16mm dia MS nozzles in a grid of 1m c/c up to the half of the thickness of the concrete structure.A grout slurry of neat cement & chloride free expanding grout cebex 100 of Fosroc Chemicals or Mastergrout CPG-1 of Choksey Chemicals/ Armgrout additive of Myk arment or Masterflow 150 of BASF or equivalent @ 0.5% by weight of cement water cement ratio 0.35 to 0.40 and viscosity not more than 1.02 centipoise with grouting pressure till the refusal of injection grout. . The grouting operation pressure shall be 2Kg/sq.cm.Cutting the exposed nozzle after the grouting with a good cutter to make the surface free from the grouting pipes and to seal the gap with plugging compound Masterplug of Choksey Chemicals as per the specification and the direction of the department complete including formwork.
Providing and inserting nipples with approved fixing compound after drilling holes for grouting as per Technical specifications including subsequent cutting/removal and sealing of the hole as necessary of nipples after completion of grouting with Cement/Epoxy.
Sealing of crack / porous concrete with Epoxy Grout by injection through nipples complete as per clause 2803.1.
Providing and applying Deckguard E 2000 or Masterseal 878 of BASf or equivalent a High Performance Anticarbonation Protective Coating System, over the prime surface using an airless spray or roller at right angles to each other @ coverage of 5 Sqm per litre per coat @ 200 microns wft / 100 microns DFT with an intercoat period of minimum 12 hrs @ 35ºC. The coverage per litre for 2 coats shall be 2.5 Sqm @ 200 microns DFT. The protective coating system should have CO2 diffusion resistance not less than 240mm equivalent of air thickness and 60cm equivalent of 30N concrete along with a water vapour transmission resistance of less than 1.0 metre (Taywood method), the coating should have static crack accommodation of not less than 2mm (BRE) and adhesion greater than 1.0 N/mm² as per BS 1881.
Painting on concrete surface (Providing and applying 2 coats of water based cement paint to unplastered concrete surface after cleaning the surface of dirt, dust, oil, grease, efflorescence and applying paint @ of 1 litre for 2 Sq.m. )--For RCC Railing
Non-destuctive testing with Ultrasonic Pulse Velocity Meter with data storage facility for detection of cracks, voids and other imperfections in Reinforced concrete structures and furnishing the findings thereof in proper comprehensible format , complete as directed by the department.
Conducting Concrete Core tests of 75mm diacores, on concrete stucture, as per stipulated procedures, for determination the equivalent cube compressive strength, concrete of the structures including preparation and furnishing the report showing the findings thereof in proper comprehensible format , complete as directed by the department.
Chipping of deteriorated concrete and removal of all loose & friable materials and fully exposing rusted reinforcement followed by proper cleaning and removing of rusts and other foreign materials using sand blasting/ emery cloths/ wire brush etc. including formwork as directed and specified by the department complete
Bonding between old and new concrete surface-Supplying and applying Epoxy based bonding agent Nitobond EP of Fosroc Chemicals or Masterbrace 1414 of BASF /Rearmbond EBA or equivalent @ 0.50 Lit pe sqm after totally saturating the cleaned concrete surface with clean water for proper bonding of old and new concrete including formwork as specified and directed by the department complete.
Patching of damaged concrete surface with structural grade polymer modified reinstatement mortar to like Fosroc Renderoc S2 or equivalent at a thickness of 10 to 20mm as per instructions of manufacturer and as approved by the Engineer.The prepacked repair mortar should have a compressive strength 45N/mm²,Flexture strength 8 N/mm² at 28 Days.
Providing & fixing 16mm dia MS nozzles in a grid of 1m c/c up to the half of the thickness of the concrete structure.A grout slurry of neat cement & chloride free expanding grout cebex 100 of Fosroc Chemicals or Mastergrout CPG-1 of Choksey Chemicals/ Armgrout additive of Myk arment or Masterflow 150 of BASF or equivalent @ 0.5% by weight of cement water cement ratio 0.35 to 0.40 and viscosity not more than 1.02 centipoise with grouting pressure till the refusal of injection grout. . The grouting operation pressure shall be 2Kg/sq.cm.Cutting the exposed nozzle after the grouting with a good cutter to make the surface free from the grouting pipes and to seal the gap with plugging compound Masterplug of Choksey Chemicals as per the specification and the direction of the department complete including formwork.
Providing and inserting nipples with approved fixing compound after drilling holes for grouting as per Technical specifications including subsequent cutting/removal and sealing of the hole as necessary of nipples after completion of grouting with Cement/Epoxy.
Sealing of crack / porous concrete with Epoxy Grout by injection through nipples complete as per clause 2803.1.
Providing and applying Deckguard E 2000 or Masterseal 878 of BASf or equivalent a High Performance Anticarbonation Protective Coating System, over the prime surface using an airless spray or roller at right angles to each other @ coverage of 5 Sqm per litre per coat @ 200 microns wft / 100 microns DFT with an intercoat period of minimum 12 hrs @ 35ºC. The coverage per litre for 2 coats shall be 2.5 Sqm @ 200 microns DFT. The protective coating system should have CO2 diffusion resistance not less than 240mm equivalent of air thickness and 60cm equivalent of 30N concrete along with a water vapour transmission resistance of less than 1.0 metre (Taywood method), the coating should have static crack accommodation of not less than 2mm (BRE) and adhesion greater than 1.0 N/mm² as per BS 1881.
Painting on concrete surface (Providing and applying 2 coats of water based cement paint to unplastered concrete surface after cleaning the surface of dirt, dust, oil, grease, efflorescence and applying paint @ of 1 litre for 2 Sq.m. )--For RCC Railing
Non-destuctive testing with Ultrasonic Pulse Velocity Meter with data storage facility for detection of cracks, voids and other imperfections in Reinforced concrete structures and furnishing the findings thereof in proper comprehensible format , complete as directed by the department.
Conducting Concrete Core tests of 75mm diacores, on concrete stucture, as per stipulated procedures, for determination the equivalent cube compressive strength, concrete of the structures including preparation and furnishing the report showing the findings thereof in proper comprehensible format , complete as directed by the department.
Chipping of deteriorated concrete and removal of all loose & friable materials and fully exposing rusted reinforcement followed by proper cleaning and removing of rusts and other foreign materials using sand blasting/ emery cloths/ wire brush etc. including formwork as directed and specified by the department complete.
Bonding between old and new concrete surface-Supplying and applying Epoxy based bonding agent Nitobond EP of Fosroc Chemicals or Masterbrace 1414 of BASF /Rearmbond EBA or equivalent @ 0.50 Lit pe sqm after totally saturating the cleaned concrete surface with clean water for proper bonding of old and new concrete including formwork as specified and directed by the department complete.
Patching of damaged concrete surface with structural grade polymer modified reinstatement mortar to like Fosroc Renderoc S2 or equivalent at a thickness of 10 to 20mm as per instructions of manufacturer and as approved by the Engineer.The prepacked repair mortar should have a compressive strength 45N/mm²,Flexture strength 8 N/mm² at 28 Days.
Repair of joint Grooves with Epoxy Mortar Repair of spalled joint grooves of contraction joints, longitudinal joints and expansion joints in concrete pavements using epoxy mortar or epoxy concrete
Providing & fixing 16mm dia MS nozzles in a grid of 1m c/c up to the half of the thickness of the concrete structure.A grout slurry of neat cement & chloride free expanding grout cebex 100 of Fosroc Chemicals or Mastergrout CPG-1 of Choksey Chemicals/ Armgrout additive of Myk arment or Masterflow 150 of BASF or equivalent @ 0.5% by weight of cement water cement ratio 0.35 to 0.40 and viscosity not more than 1.02 centipoise with grouting pressure till the refusal of injection grout. . The grouting operation pressure shall be 2Kg/sq.cm.Cutting the exposed nozzle after the grouting with a good cutter to make the surface free from the grouting pipes and to seal the gap with plugging compound Masterplug of Choksey Chemicals as per the specification and the direction of the department complete including formwork.
Providing and inserting nipples with approved fixing compound after drilling holes for grouting as per Technical specifications including subsequent cutting/removal and sealing of the hole as necessary of nipples after completion of grouting with Cement/Epoxy.
Sealing of crack / porous concrete with Epoxy Grout by injection through nipples complete as per clause 2803.1.
Providing and applying Deckguard E 2000 or Masterseal 878 of BASf or equivalent a High Performance Anticarbonation Protective Coating System, over the prime surface using an airless spray or roller at right angles to each other @ coverage of 5 Sqm per litre per coat @ 200 microns wft / 100 microns DFT with an intercoat period of minimum 12 hrs @ 35ºC. The coverage per litre for 2 coats shall be 2.5 Sqm @ 200 microns DFT. The protective coating system should have CO2 diffusion resistance not less than 240mm equivalent of air thickness and 60cm equivalent of 30N concrete along with a water vapour transmission resistance of less than 1.0 metre (Taywood method), the coating should have static crack accommodation of not less than 2mm (BRE) and adhesion greater than 1.0 N/mm² as per BS 1881.
Painting on concrete surface (Providing and applying 2 coats of water based cement paint to unplastered concrete surface after cleaning the surface of dirt, dust, oil, grease, efflorescence and applying paint @ of 1 litre for 2 Sq.m. )--For RCC Railing
Non-destuctive testing with Ultrasonic Pulse Velocity Meter with data storage facility for detection of cracks, voids and other imperfections in Reinforced concrete structures and furnishing the findings thereof in proper comprehensible format , complete as directed by the department.
Conducting Concrete Core tests of 75mm diacores, on concrete stucture, as per stipulated procedures, for determination the equivalent cube compressive strength, concrete of the structures including preparation and furnishing the report showing the findings thereof in proper comprehensible format , complete as directed by the department.
Chipping of deteriorated concrete and removal of all loose & friable materials and fully exposing rusted reinforcement followed by proper cleaning and removing of rusts and other foreign materials using sand blasting/ emery cloths/ wire brush etc. including formwork as directed and specified by the department complete.
Bonding between old and new concrete surface-Supplying and applying Epoxy based bonding agent Nitobond EP of Fosroc Chemicals or Masterbrace 1414 of BASF /Rearmbond EBA or equivalent @ 0.50 Lit pe sqm after totally saturating the cleaned concrete surface with clean water for proper bonding of old and new concrete including formwork as specified and directed by the department complete.
Patching of damaged concrete surface with structural grade polymer modified reinstatement mortar to like Fosroc Renderoc S2 or equivalent at a thickness of 10 to 20mm as per instructions of manufacturer and as approved by the Engineer.The prepacked repair mortar should have a compressive strength 45N/mm²,Flexture strength 8 N/mm² at 28 Days.
Repair of joint Grooves with Epoxy Mortar Repair of spalled joint grooves of contraction joints, longitudinal joints and expansion joints in concrete pavements using epoxy mortar or epoxy concrete
Providing & fixing 16mm dia MS nozzles in a grid of 1m c/c up to the half of the thickness of the concrete structure.A grout slurry of neat cement & chloride free expanding grout cebex 100 of Fosroc Chemicals or Mastergrout CPG-1 of Choksey Chemicals/ Armgrout additive of Myk arment or Masterflow 150 of BASF or equivalent @ 0.5% by weight of cement water cement ratio 0.35 to 0.40 and viscosity not more than 1.02 centipoise with grouting pressure till the refusal of injection grout. . The grouting operation pressure shall be 2Kg/sq.cm.Cutting the exposed nozzle after the grouting with a good cutter to make the surface free from the grouting pipes and to seal the gap with plugging compound Masterplug of Choksey Chemicals as per the specification and the direction of the department complete including formwork.
Providing and inserting nipples with approved fixing compound after drilling holes for grouting as per Technical specifications including subsequent cutting/removal and sealing of the hole as necessary of nipples after completion of grouting with Cement/Epoxy.
Sealing of crack / porous concrete with Epoxy Grout by injection through nipples complete as per clause 2803.1.
Providing and applying Deckguard E 2000 or Masterseal 878 of BASf or equivalent a High Performance Anticarbonation Protective Coating System, over the prime surface using an airless spray or roller at right angles to each other @ coverage of 5 Sqm per litre per coat @ 200 microns wft / 100 microns DFT with an intercoat period of minimum 12 hrs @ 35ºC. The coverage per litre for 2 coats shall be 2.5 Sqm @ 200 microns DFT. The protective coating system should have CO2 diffusion resistance not less than 240mm equivalent of air thickness and 60cm equivalent of 30N concrete along with a water vapour transmission resistance of less than 1.0 metre (Taywood method), the coating should have static crack accommodation of not less than 2mm (BRE) and adhesion greater than 1.0 N/mm² as per BS 1881.
Painting on concrete surface (Providing and applying 2 coats of water based cement paint to unplastered concrete surface after cleaning the surface of dirt, dust, oil, grease, efflorescence and applying paint @ of 1 litre for 2 Sq.m. )--For RCC Railing
Non-destuctive testing with Ultrasonic Pulse Velocity Meter with data storage facility for detection of cracks, voids and other imperfections in Reinforced concrete structures and furnishing the findings thereof in proper comprehensible format , complete as directed by the department.
Conducting Concrete Core tests of 75mm diacores, on concrete stucture, as per stipulated procedures, for determination the equivalent cube compressive strength, concrete of the structures including preparation and furnishing the report showing the findings thereof in proper comprehensible format , complete as directed by the department.
Chipping of deteriorated concrete and removal of all loose & friable materials and fully exposing rusted reinforcement followed by proper cleaning and removing of rusts and other foreign materials using sand blasting/ emery cloths/ wire brush etc. including formwork as directed and specified by the department complete
Bonding between old and new concrete surface-Supplying and applying Epoxy based bonding agent Nitobond EP of Fosroc Chemicals or Masterbrace 1414 of BASF /Rearmbond EBA or equivalent @ 0.50 Lit pe sqm after totally saturating the cleaned concrete surface with clean water for proper bonding of old and new concrete including formwork as specified and directed by the department complete.
Patching of damaged concrete surface with structural grade polymer modified reinstatement mortar to like Fosroc Renderoc S2 or equivalent at a thickness of 10 to 20mm as per instructions of manufacturer and as approved by the Engineer.The prepacked repair mortar should have a compressive strength 45N/mm²,Flexture strength 8 N/mm² at 28 Days.
Repair of joint Grooves with Epoxy Mortar Repair of spalled joint grooves of contraction joints, longitudinal joints and expansion joints in concrete pavements using epoxy mortar or epoxy concrete
Providing & fixing 16mm dia MS nozzles in a grid of 1m c/c up to the half of the thickness of the concrete structure.A grout slurry of neat cement & chloride free expanding grout cebex 100 of Fosroc Chemicals or Mastergrout CPG-1 of Choksey Chemicals/ Armgrout additive of Myk arment or Masterflow 150 of BASF or equivalent @ 0.5% by weight of cement water cement ratio 0.35 to 0.40 and viscosity not more than 1.02 centipoise with grouting pressure till the refusal of injection grout. . The grouting operation pressure shall be 2Kg/sq.cm.Cutting the exposed nozzle after the grouting with a good cutter to make the surface free from the grouting pipes and to seal the gap with plugging compound Masterplug of Choksey Chemicals as per the specification and the direction of the department complete including formwork.
Providing and inserting nipples with approved fixing compound after drilling holes for grouting as per Technical specifications including subsequent cutting/removal and sealing of the hole as necessary of nipples after completion of grouting with Cement/Epoxy.
Sealing of crack / porous concrete with Epoxy Grout by injection through nipples complete as per clause 2803.1.
Providing and applying Deckguard E 2000 or Masterseal 878 of BASf or equivalent a High Performance Anticarbonation Protective Coating System, over the prime surface using an airless spray or roller at right angles to each other @ coverage of 5 Sqm per litre per coat @ 200 microns wft / 100 microns DFT with an intercoat period of minimum 12 hrs @ 35ºC. The coverage per litre for 2 coats shall be 2.5 Sqm @ 200 microns DFT. The protective coating system should have CO2 diffusion resistance not less than 240mm equivalent of air thickness and 60cm equivalent of 30N concrete along with a water vapour transmission resistance of less than 1.0 metre (Taywood method), the coating should have static crack accommodation of not less than 2mm (BRE) and adhesion greater than 1.0 N/mm² as per BS 1881.
Painting on concrete surface (Providing and applying 2 coats of water based cement paint to unplastered concrete surface after cleaning the surface of dirt, dust, oil, grease, efflorescence and applying paint @ of 1 litre for 2 Sq.m. )--For RCC Railing
Non-destuctive testing with Ultrasonic Pulse Velocity Meter with data storage facility for detection of cracks, voids and other imperfections in Reinforced concrete structures and furnishing the findings thereof in proper comprehensible format , complete as directed by the department.
Conducting Concrete Core tests of 75mm diacores, on concrete stucture, as per stipulated procedures, for determination the equivalent cube compressive strength, concrete of the structures including preparation and furnishing the report showing the findings thereof in proper comprehensible format , complete as directed by the department.
Chipping of deteriorated concrete and removal of all loose & friable materials and fully exposing rusted reinforcement followed by proper cleaning and removing of rusts and other foreign materials using sand blasting/ emery cloths/ wire brush etc. including formwork as directed and specified by the department complete
Replacement of corroded reinforcement by cutting and welding new reinforcement of minimum 25mm dia. including lapping on both sides to the specified length as directed and as per relevant IS/IRC codes and cost of gas ,welding rods,higher charge of welding machines etc. including formwork as required.(Reinforcement to be measured and paid seperately)
Supplying and applying two coats of zinc rich anti corrosive protective coating with nitozinc primer of Fosroc or equivalent @0.20 Litre per sqm over thoroughly cleaned & prepared steel bar including formwork as directed and specified by the department complete
Patching of damaged concrete surface with structural grade polymer modified reinstatement mortar to like Fosroc Renderoc S2 or equivalent at a thickness of 10 to 20 mm as per instruction of manufracturer and as approved by the engineer . The prepacked repair mortar should have a compressive strength 45 N/Sqmm, Flexture strength 8 N/ Sqmm at 28 Days
Repair of joint Grooves with Epoxy Mortar Repair of spalled joint grooves of contraction joints, longitudinal joints and expansion joints in concrete pavements using epoxy mortar or epoxy concrete)
Providing & fixing 16mm dia MS nozzles in a grid of 1m c/c up to the half of the thickness of the concrete structure.A grout slurry of neat cement & chloride free expanding grout cebex 100 of Fosroc Chemicals/ Mastergrout CPG-1 of Choksey Chemicals/ Armgrout additive of Myk arment/Masterflow 150 of BASF or equivalent @ 0.5% by weight of cement water cement ratio 0.35 to 0.40 and viscosity not more than 1.02 centipoise with grouting pressure till the refusal of injection grout Mastergrout CPG-1. The grouting operation pressure shall be 2Kg/sq.cm.Cutting the exposed nozzle after the grouting with a good cutter to make the surface free from the grouting pipes and to seal the gap with plugging compound Masterplug of Choksey Chemicals as per the specification and the direction of the department complete including formwork.
Providing and inserting nipples with approved fixing compound after drilling holes for grouting as per Technical specifications including subsequent cutting/removal and sealing of the hole as necessary of nipples after completion of grouting with Cement/Epoxy.
Sealing of crack / porous concrete with Epoxy Grout by injection through nipples complete as per clause 2803.1.
Supplying and fixing of rebaring chemicals Fosroc LOKFIX E55 S-venylester chemical anchor grout or equivalent for various diameter of reinforcement bar at provided embedment depth as per manufracturer specification and instructions for use in concrete applications as directed by engineer in charge a) 8 mm dia re-bar at 120mm depth
Supplying and fixing of rebaring chemicals Fosroc LOKFIX E55 S-venylester chemical anchor grout or equivalent for various diameter of reinforcement bar at provided embedment depth as per manufracturer specification and instructions for use in concrete applications as directed by engineer in charge c) 12 mm dia re-bar at 180mm depth
Supplying, fitting and placing TMT bar reinforcement in sub-structure complete as per drawing and technical specifications ii) Super Ductile (SD) TMT reinforcement bar of Fe-500 N/mm2
Providing and applying Deckguard E2000 or Masterseal 878 of BASf or equivalent a High Performance Anticarbonation Protective Coating System, over the prime surface using an airless spray or roller at right angles ti each other @ coverage of 5 Sqm per litre per coat @ 200 micron wft/100 microns DFT with an intercoat period of minimum 12 hrs @35˚ C. The covarge per litre for 2 coats shall be 2.5 sqm @ 200 microns DFT. The protective coating system should have CO 2 diffusion resitance not less than 240mm equivalent of air thickness and 60 cm equivalent of 30N concerete along with a water vapour transmission resistance of less than 1.0 m (Taywood method), the coating should static crack accomodition of not less than 2mm (BRE) and addition greater than 1.0 N/mm2 as per BS 1881.
Painting on concrete surface (Providing and applying 2 coats of water based cement paint to unplastered concrete surface after cleaning the surface of dirt, dust, oil, grease, efflorescence and applying paint @ of 1 litre for 2 Sq.m. ) (B)For RCC Railing
Non-destuctive testing with Ultrasonic Pulse Velocity Meter with data storage facility for detection of cracks, voids and other imperfections in Reinforced concrete structures and furnishing the findings thereof in proper comprehensible format , complete as directed by the department.
Conducting Concrete Core tests of 75mm diacores, on concrete stucture, as per stipulated procedures, for determination the equivalent cube compressive strength, concrete of the structures including preparation and furnishing the report showing the findings thereof in proper comprehensible format , complete as directed by the department.
Chipping of deteriorated concrete and removal of all loose & friable materials and fully exposing rusted reinforcement followed by proper cleaning and removing of rusts and other foreign materials using sand blasting/ emery cloths/ wire brush etc. including formwork as directed and specified by the department complete.
Supplying and applying Epoxy based bonding agent Nitobond EP of Fosroc Chemicals or Masterbrace 1414 of BASF /Rearmbond EBA or equivalent @ 0.50 Lit pe sqm after totally saturating the cleaned concrete surface with clean water for proper bonding of old and new concrete including formwork as specified and directed by the department complete.
Patching of damaged concrete surface with structural grade polymer modified reinstatement mortar to like Fosroc Renderoc S2 or equivalent at a thickness of 10 to 20 mm as per instruction of manufracturer and as approved by the engineer . The prepacked repair mortar should have a compressive strength 45 N/Sqmm, Flexture strength 8 N/ Sqmm at 28 Days
'Repair of joint Grooves with Epoxy Mortar Repair of spalled joint grooves of contraction joints, longitudinal joints and expansion joints in concrete pavements using epoxy mortar or epoxy concrete)
Providing & fixing 16mm dia MS nozzles in a grid of 1m c/c up to the half of the thickness of the concrete structure.A grout slurry of neat cement & chloride free expanding grout cebex 100 of Fosroc Chemicals/ Mastergrout CPG-1 of Choksey Chemicals/ Armgrout additive of Myk arment/Masterflow 150 of BASF or equivalent @ 0.5% by weight of cement water cement ratio 0.35 to 0.40 and viscosity not more than 1.02 centipoise with grouting pressure till the refusal of injection grout Mastergrout CPG-1. The grouting operation pressure shall be 2Kg/sq.cm.Cutting the exposed nozzle after the grouting with a good cutter to make the surface free from the grouting pipes and to seal the gap with plugging compound Masterplug of Choksey Chemicals as per the specification and the direction of the department complete including formwork.
Providing and inserting nipples with approved fixing compound after drilling holes for grouting as per Technical specifications including subsequent cutting/removal and sealing of the hole as necessary of nipples after completion of grouting with Cement/Epoxy.
Sealing of crack / porous concrete with Epoxy Grout by injection through nipples complete as per clause 2803.1.
Providing and applying Deckguard E2000 or Masterseal 878 of BASf or equivalent a High Performance Anticarbonation Protective Coating System, over the prime surface using an airless spray or roller at right angles ti each other @ coverage of 5 Sqm per litre per coat @ 200 micron wft/100 microns DFT with an intercoat period of minimum 12 hrs @35˚ C. The covarge per litre for 2 coats shall be 2.5 sqm @ 200 microns DFT. The protective coating system should have CO 2 diffusion resitance not less than 240mm equivalent of air thickness and 60 cm equivalent of 30N concerete along with a water vapour transmission resistance of less than 1.0 m (Taywood method), the coating should static crack accomodition of not less than 2mm (BRE) and addition greater than 1.0 N/mm2 as per BS 1881.
Painting on concrete surface (Providing and applying 2 coats of water based cement paint to unplastered concrete surface after cleaning the surface of dirt, dust, oil, grease, efflorescence and applying paint @ of 1 litre for 2 Sq.m. ) (B)For RCC Railing
Non-destuctive testing with Ultrasonic Pulse Velocity Meter with data storage facility for detection of cracks, voids and other imperfections in Reinforced concrete structures and furnishing the findings thereof in proper comprehensible format , complete as directed by the department.
Conducting Concrete Core tests of 75mm diacores, on concrete stucture, as per stipulated procedures, for determination the equivalent cube compressive strength, concrete of the structures including preparation and furnishing the report showing the findings thereof in proper comprehensible format , complete as directed by the department.
Chipping of deteriorated concrete and removal of all loose & friable materials and fully exposing rusted reinforcement followed by proper cleaning and removing of rusts and other foreign materials using sand blasting/ emery cloths/ wire brush etc. including formwork as directed and specified by the department complete.
Bonding between old and new concrete surface-Supplying and applying Epoxy based bonding agent Nitobond EP of Fosroc Chemicals or Masterbrace 1414 of BASF /Rearmbond EBA or equivalent @ 0.50 Lit pe sqm after totally saturating the cleaned concrete surface with clean water for proper bonding of old and new concrete including formwork as specified and directed by the department complete.
Patching of damaged concrete surface with structural grade polymer modified reinstatement mortar to like Fosroc Renderoc S2 or equivalent at a thickness of 10 to 20mm as per instructions of manufacturer and as approved by the Engineer.The prepacked repair mortar should have a compressive strength 45N/mm²,Flexture strength 8 N/mm² at 28 Days.
Repair of joint Grooves with Epoxy Mortar Repair of spalled joint grooves of contraction joints, longitudinal joints and expansion joints in concrete pavements using epoxy mortar or epoxy concrete
Providing & fixing 16mm dia MS nozzles in a grid of 1m c/c up to the half of the thickness of the concrete structure.A grout slurry of neat cement & chloride free expanding grout cebex 100 of Fosroc Chemicals or Mastergrout CPG-1 of Choksey Chemicals/ Armgrout additive of Myk arment or Masterflow 150 of BASF or equivalent @ 0.5% by weight of cement water cement ratio 0.35 to 0.40 and viscosity not more than 1.02 centipoise with grouting pressure till the refusal of injection grout. . The grouting operation pressure shall be 2Kg/sq.cm.Cutting the exposed nozzle after the grouting with a good cutter to make the surface free from the grouting pipes and to seal the gap with plugging compound Masterplug of Choksey Chemicals as per the specification and the direction of the department complete including formwork.
Providing and inserting nipples with approved fixing compound after drilling holes for grouting as per Technical specifications including subsequent cutting/removal and sealing of the hole as necessary of nipples after completion of grouting with Cement/Epoxy.
Sealing of crack / porous concrete with Epoxy Grout by injection through nipples complete as per clause 2803.1.
Providing and applying Deckguard E 2000 or Masterseal 878 of BASf or equivalent a High Performance Anticarbonation Protective Coating System, over the prime surface using an airless spray or roller at right angles to each other @ coverage of 5 Sqm per litre per coat @ 200 microns wft / 100 microns DFT with an intercoat period of minimum 12 hrs @ 35ºC. The coverage per litre for 2 coats shall be 2.5 Sqm @ 200 microns DFT. The protective coating system should have CO2 diffusion resistance not less than 240mm equivalent of air thickness and 60cm equivalent of 30N concrete along with a water vapour transmission resistance of less than 1.0 metre (Taywood method), the coating should have static crack accommodation of not less than 2mm (BRE) and adhesion greater than 1.0 N/mm² as per BS 1881.
Painting on concrete surface (Providing and applying 2 coats of water based cement paint to unplastered concrete surface after cleaning the surface of dirt, dust, oil, grease, efflorescence and applying paint @ of 1 litre for 2 Sq.m. )--For RCC Railing
Non-destuctive testing with Ultrasonic Pulse Velocity Meter with data storage facility for detection of cracks, voids and other imperfections in Reinforced concrete structures and furnishing the findings thereof in proper comprehensible format , complete as directed by the department.
Conducting Concrete Core tests of 75mm diacores, on concrete stucture, as per stipulated procedures, for determination the equivalent cube compressive strength, concrete of the structures including preparation and furnishing the report showing the findings thereof in proper comprehensible format , complete as directed by the department.
Chipping of deteriorated concrete and removal of all loose & friable materials and fully exposing rusted reinforcement followed by proper cleaning and removing of rusts and other foreign materials using sand blasting/ emery cloths/ wire brush etc. including formwork as directed and specified by the department complete
Bonding between old and new concrete surface-Supplying and applying Epoxy based bonding agent Nitobond EP of Fosroc Chemicals or Masterbrace 1414 of BASF /Rearmbond EBA or equivalent @ 0.50 Lit pe sqm after totally saturating the cleaned concrete surface with clean water for proper bonding of old and new concrete including formwork as specified and directed by the department complete.
Patching of damaged concrete surface with structural grade polymer modified reinstatement mortar to like Fosroc Renderoc S2 or equivalent at a thickness of 10 to 20mm as per instructions of manufacturer and as approved by the Engineer.The prepacked repair mortar should have a compressive strength 45N/mm²,Flexture strength 8 N/mm² at 28 Days.
Repair of joint Grooves with Epoxy Mortar Repair of spalled joint grooves of contraction joints, longitudinal joints and expansion joints in concrete pavements using epoxy mortar or epoxy concrete
Providing & fixing 16mm dia MS nozzles in a grid of 1m c/c up to the half of the thickness of the concrete structure.A grout slurry of neat cement & chloride free expanding grout cebex 100 of Fosroc Chemicals or Mastergrout CPG-1 of Choksey Chemicals/ Armgrout additive of Myk arment or Masterflow 150 of BASF or equivalent @ 0.5% by weight of cement water cement ratio 0.35 to 0.40 and viscosity not more than 1.02 centipoise with grouting pressure till the refusal of injection grout. . The grouting operation pressure shall be 2Kg/sq.cm.Cutting the exposed nozzle after the grouting with a good cutter to make the surface free from the grouting pipes and to seal the gap with plugging compound Masterplug of Choksey Chemicals as per the specification and the direction of the department complete including formwork.
Providing and inserting nipples with approved fixing compound after drilling holes for grouting as per Technical specifications including subsequent cutting/removal and sealing of the hole as necessary of nipples after completion of grouting with Cement/Epoxy.
Sealing of crack / porous concrete with Epoxy Grout by injection through nipples complete as per clause 2803.1.
Providing and applying Deckguard E 2000 or Masterseal 878 of BASf or equivalent a High Performance Anticarbonation Protective Coating System, over the prime surface using an airless spray or roller at right angles to each other @ coverage of 5 Sqm per litre per coat @ 200 microns wft / 100 microns DFT with an intercoat period of minimum 12 hrs @ 35ºC. The coverage per litre for 2 coats shall be 2.5 Sqm @ 200 microns DFT. The protective coating system should have CO2 diffusion resistance not less than 240mm equivalent of air thickness and 60cm equivalent of 30N concrete along with a water vapour transmission resistance of less than 1.0 metre (Taywood method), the coating should have static crack accommodation of not less than 2mm (BRE) and adhesion greater than 1.0 N/mm² as per BS 1881.
Painting on concrete surface (Providing and applying 2 coats of water based cement paint to unplastered concrete surface after cleaning the surface of dirt, dust, oil, grease, efflorescence and applying paint @ of 1 litre for 2 Sq.m. )--For RCC Railing
Non-destuctive testing with Ultrasonic Pulse Velocity Meter with data storage facility for detection of cracks, voids and other imperfections in Reinforced concrete structures and furnishing the findings thereof in proper comprehensible format , complete as directed by the department.
Conducting Concrete Core tests of 75mm diacores, on concrete stucture, as per stipulated procedures, for determination the equivalent cube compressive strength, concrete of the structures including preparation and furnishing the report showing the findings thereof in proper comprehensible format , complete as directed by the department.
Chipping of deteriorated concrete and removal of all loose & friable materials and fully exposing rusted reinforcement followed by proper cleaning and removing of rusts and other foreign materials using sand blasting/ emery cloths/ wire brush etc. including formwork as directed and specified by the department complete.
Supplying and applying Epoxy based bonding agent Nitobond EP of Fosroc Chemicals or Masterbrace 1414 of BASF /Rearmbond EBA or equivalent @ 0.50 Lit pe sqm after totally saturating the cleaned concrete surface with clean water for proper bonding of old and new concrete including formwork as specified and directed by the department complete.
Patching of damaged concrete surface with structural grade polymer modified reinstatement mortar to like Fosroc Renderoc S2 or equivalent at a thickness of 10 to 20 mm as per instruction of manufracturer and as approved by the engineer . The prepacked repair mortar should have a compressive strength 45 N/Sqmm, Flexture strength 8 N/ Sqmm at 28 Days
'Repair of joint Grooves with Epoxy Mortar Repair of spalled joint grooves of contraction joints, longitudinal joints and expansion joints in concrete pavements using epoxy mortar or epoxy concrete)
Providing & fixing 16mm dia MS nozzles in a grid of 1m c/c up to the half of the thickness of the concrete structure.A grout slurry of neat cement & chloride free expanding grout cebex 100 of Fosroc Chemicals/ Mastergrout CPG-1 of Choksey Chemicals/ Armgrout additive of Myk arment/Masterflow 150 of BASF or equivalent @ 0.5% by weight of cement water cement ratio 0.35 to 0.40 and viscosity not more than 1.02 centipoise with grouting pressure till the refusal of injection grout Mastergrout CPG-1. The grouting operation pressure shall be 2Kg/sq.cm.Cutting the exposed nozzle after the grouting with a good cutter to make the surface free from the grouting pipes and to seal the gap with plugging compound Masterplug of Choksey Chemicals as per the specification and the direction of the department complete including formwork.
Providing and inserting nipples with approved fixing compound after drilling holes for grouting as per Technical specifications including subsequent cutting/removal and sealing of the hole as necessary of nipples after completion of grouting with Cement/Epoxy.
Sealing of crack / porous concrete with Epoxy Grout by injection through nipples complete as per clause 2803.1.
Providing & fixing 16mm dia MS nozzles in a grid of 1m c/c up to the half of the thickness of the concrete structure.A grout slurry of neat cement & chloride free expanding grout cebex 100 of Fosroc Chemicals/ Mastergrout CPG-1 of Choksey Chemicals/ Armgrout additive of Myk arment/Masterflow 150 of BASF or equivalent @ 0.5% by weight of cement water cement ratio 0.35 to 0.40 and viscosity not more than 1.02 centipoise with grouting pressure till the refusal of injection grout Mastergrout CPG-1. The grouting operation pressure shall be 2Kg/sq.cm.Cutting the exposed nozzle after the grouting with a good cutter to make the surface free from the grouting pipes and to seal the gap with plugging compound Masterplug of Choksey Chemicals as per the specification and the direction of the department complete including formwork.
Painting on concrete surface (Providing and applying 2 coats of water based cement paint to unplastered concrete surface after cleaning the surface of dirt, dust, oil, grease, efflorescence and applying paint @ of 1 litre for 2 Sq.m. ) (B)For RCC Railing
Non-destuctive testing with Ultrasonic Pulse Velocity Meter with data storage facility for detection of cracks, voids and other imperfections in Reinforced concrete structures and furnishing the findings thereof in proper comprehensible format , complete as directed by the department.
Conducting Concrete Core tests of 75mm diacores, on concrete stucture, as per stipulated procedures, for determination the equivalent cube compressive strength, concrete of the structures including preparation and furnishing the report showing the findings thereof in proper comprehensible format , complete as directed by the department.
Chipping of deteriorated concrete and removal of all loose & friable materials and fully exposing rusted reinforcement followed by proper cleaning and removing of rusts and other foreign materials using sand blasting/ emery cloths/ wire brush etc. including formwork as directed and specified by the department complete
Bonding between old and new concrete surface-Supplying and applying Epoxy based bonding agent Nitobond EP of Fosroc Chemicals or Masterbrace 1414 of BASF /Rearmbond EBA or equivalent @ 0.50 Lit pe sqm after totally saturating the cleaned concrete surface with clean water for proper bonding of old and new concrete including formwork as specified and directed by the department complete.
Patching of damaged concrete surface with structural grade polymer modified reinstatement mortar to like Fosroc Renderoc S2 or equivalent at a thickness of 10 to 20mm as per instructions of manufacturer and as approved by the Engineer.The prepacked repair mortar should have a compressive strength 45N/mm²,Flexture strength 8 N/mm² at 28 Days.
Repair of joint Grooves with Epoxy Mortar Repair of spalled joint grooves of contraction joints, longitudinal joints and expansion joints in concrete pavements using epoxy mortar or epoxy concrete
Providing & fixing 16mm dia MS nozzles in a grid of 1m c/c up to the half of the thickness of the concrete structure.A grout slurry of neat cement & chloride free expanding grout cebex 100 of Fosroc Chemicals or Mastergrout CPG-1 of Choksey Chemicals/ Armgrout additive of Myk arment or Masterflow 150 of BASF or equivalent @ 0.5% by weight of cement water cement ratio 0.35 to 0.40 and viscosity not more than 1.02 centipoise with grouting pressure till the refusal of injection grout. . The grouting operation pressure shall be 2Kg/sq.cm.Cutting the exposed nozzle after the grouting with a good cutter to make the surface free from the grouting pipes and to seal the gap with plugging compound Masterplug of Choksey Chemicals as per the specification and the direction of the department complete including formwork.
Providing and inserting nipples with approved fixing compound after drilling holes for grouting as per Technical specifications including subsequent cutting/removal and sealing of the hole as necessary of nipples after completion of grouting with Cement/Epoxy.
Sealing of crack / porous concrete with Epoxy Grout by injection through nipples complete as per clause 2803.1.
Providing and applying Deckguard E 2000 or Masterseal 878 of BASf or equivalent a High Performance Anticarbonation Protective Coating System, over the prime surface using an airless spray or roller at right angles to each other @ coverage of 5 Sqm per litre per coat @ 200 microns wft / 100 microns DFT with an intercoat period of minimum 12 hrs @ 35ºC. The coverage per litre for 2 coats shall be 2.5 Sqm @ 200 microns DFT. The protective coating system should have CO2 diffusion resistance not less than 240mm equivalent of air thickness and 60cm equivalent of 30N concrete along with a water vapour transmission resistance of less than 1.0 metre (Taywood method), the coating should have static crack accommodation of not less than 2mm (BRE) and adhesion greater than 1.0 N/mm² as per BS 1881.
Painting on concrete surface (Providing and applying 2 coats of water based cement paint to unplastered concrete surface after cleaning the surface of dirt, dust, oil, grease, efflorescence and applying paint @ of 1 litre for 2 Sq.m. )--For RCC Railing
Non-destuctive testing with Ultrasonic Pulse Velocity Meter with data storage facility for detection of cracks, voids and other imperfections in Reinforced concrete structures and furnishing the findings thereof in proper comprehensible format , complete as directed by the department.
Conducting Concrete Core tests of 75mm diacores, on concrete stucture, as per stipulated procedures, for determination the equivalent cube compressive strength, concrete of the structures including preparation and furnishing the report showing the findings thereof in proper comprehensible format , complete as directed by the department.
Chipping of deteriorated concrete and removal of all loose & friable materials and fully exposing rusted reinforcement followed by proper cleaning and removing of rusts and other foreign materials using sand blasting/ emery cloths/ wire brush etc. including formwork as directed and specified by the department complete
Bonding between old and new concrete surface-Supplying and applying Epoxy based bonding agent Nitobond EP of Fosroc Chemicals or Masterbrace 1414 of BASF /Rearmbond EBA or equivalent @ 0.50 Lit pe sqm after totally saturating the cleaned concrete surface with clean water for proper bonding of old and new concrete including formwork as specified and directed by the department complete.
Patching of damaged concrete surface with structural grade polymer modified reinstatement mortar to like Fosroc Renderoc S2 or equivalent at a thickness of 10 to 20mm as per instructions of manufacturer and as approved by the Engineer.The prepacked repair mortar should have a compressive strength 45N/mm²,Flexture strength 8 N/mm² at 28 Days.
Repair of joint Grooves with Epoxy Mortar Repair of spalled joint grooves of contraction joints, longitudinal joints and expansion joints in concrete pavements using epoxy mortar or epoxy concrete
Providing & fixing 16mm dia MS nozzles in a grid of 1m c/c up to the half of the thickness of the concrete structure.A grout slurry of neat cement & chloride free expanding grout cebex 100 of Fosroc Chemicals or Mastergrout CPG-1 of Choksey Chemicals/ Armgrout additive of Myk arment or Masterflow 150 of BASF or equivalent @ 0.5% by weight of cement water cement ratio 0.35 to 0.40 and viscosity not more than 1.02 centipoise with grouting pressure till the refusal of injection grout. . The grouting operation pressure shall be 2Kg/sq.cm.Cutting the exposed nozzle after the grouting with a good cutter to make the surface free from the grouting pipes and to seal the gap with plugging compound Masterplug of Choksey Chemicals as per the specification and the direction of the department complete including formwork.
Providing and inserting nipples with approved fixing compound after drilling holes for grouting as per Technical specifications including subsequent cutting/removal and sealing of the hole as necessary of nipples after completion of grouting with Cement/Epoxy.
Sealing of crack / porous concrete with Epoxy Grout by injection through nipples complete as per clause 2803.1.
Providing and applying Deckguard E 2000 or Masterseal 878 of BASf or equivalent a High Performance Anticarbonation Protective Coating System, over the prime surface using an airless spray or roller at right angles to each other @ coverage of 5 Sqm per litre per coat @ 200 microns wft / 100 microns DFT with an intercoat period of minimum 12 hrs @ 35ºC. The coverage per litre for 2 coats shall be 2.5 Sqm @ 200 microns DFT. The protective coating system should have CO2 diffusion resistance not less than 240mm equivalent of air thickness and 60cm equivalent of 30N concrete along with a water vapour transmission resistance of less than 1.0 metre (Taywood method), the coating should have static crack accommodation of not less than 2mm (BRE) and adhesion greater than 1.0 N/mm² as per BS 1881.
Painting on concrete surface (Providing and applying 2 coats of water based cement paint to unplastered concrete surface after cleaning the surface of dirt, dust, oil, grease, efflorescence and applying paint @ of 1 litre for 2 Sq.m. )--For RCC Railing
Non-destuctive testing with Ultrasonic Pulse Velocity Meter with data storage facility for detection of cracks, voids and other imperfections in Reinforced concrete structures and furnishing the findings thereof in proper comprehensible format , complete as directed by the department.
Conducting Concrete Core tests of 75mm diacores, on concrete stucture, as per stipulated procedures, for determination the equivalent cube compressive strength, concrete of the structures including preparation and furnishing the report showing the findings thereof in proper comprehensible format , complete as directed by the department.
ranjanbasumatary
BAHARUL ISLAM
Dhaneswar Kalita
NIPAN NATH
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .