Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.2 LAccepted-AOC MOONIDIH DHANBAD 828129 | DHANBAD | DHANBAD | JHARKHAND | 828129 | ₹11.2 L Quoted ₹8.6 L | L1 | Accepted-AOC L1 |
| 2 | L2₹8.7 LRejected-AOC COAL INDIA LIMITED | ₹8.7 L | L2 | Rejected-AOC L2 |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹8.4 L
EMD Value
₹10,537
Closing Date
28 Feb 2026, 5:00 pmClosed
S.K.Panja
Office of the Project Officer,WJ Area
Dressing , bolting at 3 Adip and preparation of walking path at E9 BG in XVI seam Moonidih Colliery, W J Area
2026_BCCL_353489_1
BCCL/WJA/MND/SUR/2025-26/100
Open Tender
Miscellaneous Works
20 days
Moonidih Colliery, WJ Area
Please refer to NIT
11 documents required · 11 mandatory
₹10,537
21 Apr 2026
18 Feb 2026
2 Mar 2026
18 Feb 2026
28 Feb 2026
18 Feb 2026
Dressing , bolting at 3 Adip and preparation of walking path at E9 BG in XVI seam Moonidih Colliery, W J Area
3 A dip in 250m distance dressing bolting 200number, (a) 3 skilled manshift dressing 10m. cost/m = (1474.6x3)/10= Rs 442.38/m ,(
(b) 3 skilled manshift is required for bolting and 1 unskilled manshift is required for transportation of 10 nos of bolting material. Therefor cost = ( ( 3 x 1474.6)+ (1x 1402.6))/10= Rs Rs 582.64/bolt .
preparation of walking path inbye side from 4 dip to 300m E9 BG, Aanalysis (a) 3 usskileed is require for laying & holding jali both side of belt stracure. for 20m. Cost /m = (3x 1402.6 )/20= 210.39/m
(b) cleaning dip side drain 300mx 1.50 x.40= 180m³, analysis for cleaning 4m³, 3unskilled manshift is required cost/m³ (3x1402.6)/4= 1051.95/m³
drilling blasting for drain making 300x .5x .6=90m3 analysis for 10m³ drilling blasting 3 skilled is required (3x 1474.6)/10=442.38/m
mucking 90m³ analysis for 10 m3 mucking 10 unskilled manshift is required= (10x 1402.6)/10= 1402.6
Add CP 15% as per clause 4.17.1 of Civil Eng. Manual & BCCL SOR
CMPF, Pension and admin. Charge of Employee Un Skilled
CMPF, Pension and admin. Charge of Employee Skilled
Total impact of GST for the purpose of CTC
stage.html
html • 0.04 MB
techsummary_366286.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.67 MB
BOQ_366286.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid