| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.5 LAccepted-AOC | ₹9.5 L | L1 | Accepted-AOC L1 |
| 2 | L2₹10.9 L+₹1.4 L (15.0%)Rejected-Finance | ₹10.9 L+₹1.4 L (15.0%) | L2 | Rejected-Finance L2 |
| 3 | L3₹10.9 L+₹1.5 L (15.5%)Rejected-Finance | ₹10.9 L+₹1.5 L (15.5%) | L3 | Rejected-Finance L3 |
Tender Value
₹9.7 L
EMD Value
₹19,312
Closing Date
25 Feb 2026, 3:00 pmClosed
Executive Engineer
Executive Engineer,DWS Division-II
Please refer to the DNIe-T
2026_CEDWS_70160_1
66/DNIeT/EE/DWS/AGT-II/2025-26
Open Tender
Civil Works - Water Works
Percentage
180 days
Agartala
Please refer to the DNIe-T
4 documents required · 4 mandatory
₹1,000
₹19,312
8 Sept 2026
17 Feb 2026
25 Feb 2026
17 Feb 2026
25 Feb 2026
17 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m | |||||
| - | a) All Kinds of Soil | 10 | Cum | 231.6 | ₹2,316 |
| 2 | Filling available excavated earth (ex/c rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming & watering, lead up to 50m & lift upto 1.5m. A)All kinds of soil | 7 | Cum | 161.3 | ₹1,129.1 |
| 3 | Supplying & filling in plinth, under floor, foundations etc. with sand (fine) from local quarry with all lifts including spreading in horizontal layers, watering, grading to required slope, ramming, consolidating & compacting each layer by using plate compactor or by any suitable method complete. | 9 | Cum | 1,177.3 | ₹10,595.7 |
| 4Providing & laying in position cement concrete of specified grade ex/c the cost of centering & shuttering a) All work upto plinth livel | |||||
| 4.01 | i) 1:2:4 (1 Cement: 2 fine sand : 4 graded brick aggregate 40 mm nominal size) cum well burnt | 5 | Cum | 10,204.6 | ₹51,023 |
| 4.02 | iii) 1:4:8 (1 cement : 4 fine sand : 8 graded well burnt brick aggregate of 40 mm nominal size) | 5.5 | Cum | 8,980 | ₹49,390 |
| 5 | First class brick work in foundation and plinth including cost of all materials as required complete: i) In cement mortar 1:4 ( 1 cement : 4 fine sand ) | 7.5 | Cum | 9,845.2 | ₹73,839 |
| 6 | Half brick masonry work with first class bricks in foundation & plinth in/c cost of all materials as required complete:- i) In cement mortar 1:4 ( 1 cement : 4 fine sand ) | 20 | Sqm | 1,311.8 | ₹26,236 |
| 7 | Extra for brick masonry work in triangular, square and rectangular pillars including cost of all materials as required complete. | 2 | Cum | 519.8 | ₹1,039.6 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_71400.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.74 MB
BOQ_71400.xls
BOQ • 0.30 MB
DNIeT66.pdf
Tender Documents • 4.98 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .