Tender Value
₹43.2 L
EMD Value
₹43,151
Closing Date
12 Oct 2026, 5:00 pm
Superintending Engineer, GIDC, Ahmedabad
Providing and fixing barbed wire fencing with CC pole at Khoraj land.
349359
E-TENDER NOTICE NO. 06 OF 2026-27
Open
Miscellaneous Works
Works
Ahmedabad
4 documents required · 4 mandatory
₹1,770
Executive Engineer, GIDC, Ahmedabad
₹43,151
26 Sept 2026
26 Sept 2026
26 Sept 2026
12 Oct 2026
26 Sept 2026
TENDER PAPERS FOR TECHNICAL BID
for the work of
Providing and fixing barbed wire fencing with CC pole at Khoraj land.
Office of the Executive Engineer,
Ground Floor, Khadi Gramodyog Board, Near Indian Red Cross Society, Near Old Vadaj Circle,
Gandhi Ashram Road, Ahmedabad -
GIDC, Ahmedabad
INDEX OF TECHNICAL BID
Name of work: Providing and fixing barbed wire fencing with CC pole at Khoraj land.
Sr. No. Particulars Page No.
2 Instructions to Bidder for Two Cover Bid
3 Performance Bond
4 Free Maintenance Guarantee Bond
5 General Technical Specification
6 General Specification for Quality Control on Works & Materials
7 Specification of Materials
8 Code of Practice
9 List of Indian Standards & Approved Makes / Brands
10 Detailed Specification of Civil Items (Item-wise Specification)
INSTRUCTIONS TO BIDDER FOR TWO COVER BID
If any price-bid contains any conditions, the same shall have to be rejected outright.
A. The bidder shall clearly indicate deviation(s) from specifications or the tender conditions very explicitly
in the appropriate section and submit a copy of the same with the documents to be submitted by hand
delivery. It should be very clearly understood by all tenderers that the technical bid should be restricted
only to technical matters and stipulations of conditions. If any, by tenderer having financial
implications, the prices of the main tender should not be disclosed in the technical bid.
B. The technical bid with pre-qualification application will be opened first in the presence of those bidders
who remain present.
C. First, application for pre-qualification submitted by the tender along with the technical bid will be
scrutinized & based on information given by the bidder. GIDC will pre-qualify the application of
applicant. The price bid of dis-qualified tenderer by GIDC will not be opened and opened technical bid
will not be considered. The GIDC will determine the time and date of opening of price bid, and the
same will be intimated to the qualified bidders. if required after the technical bid proposal are opened
and analyzed and all clarifications / price variations, if any are obtained.
D The conditions specified in the Technical Bid should invariably be accompanied by proper financial
evaluation with mode of calculation, specifying assumptions, quantities, and rates and ceiling amounts
for each condition and shall also accompany the information in the form stating.
b. Description of the condition.
c. Financial evaluation
d. Ceiling amount.
E. Ceiling amounts shall be binding on the contractors and are liable to be added to the tender amount.
F. It is necessary that the contractor or his authorized representative remain present at the time of opening
of technical bid as specified in (F) above so that wanting details and clarifications in respect of
conditions can be furnished by him or conditions withdrawn on the spot by him. If the technical bid is
incomplete in respect of any of the details referred to in sub clauses (G) above and the contractor does
not furnish the wanting details as required above on the spot in the presence of other bidders after
opening the technical bid, the tender would be liable for rejection.
G. The evaluation as given by the contractor with the ceiling limit will then be intimated to all the bidders
who remain present and then, if convenient, the price bid may be opened on the same day and the
combined evaluation of the tender of price-bid and the technical bid would be worked out. No further
opportunity shall be given to the contractor to modify/ withdraw conditions at that stage as the price bid
would be known to all GIDC. However, reserves the right to negotiate about the tender (s) further with
any or all the contractors. In case the price bids cannot be opened on the same day then another date
will be intimated to the tenderers as in para (F) above.
H. The Competent Authority of GIDC shall open tenders in the presence of any intending contractors who
have submitted tenders or their representatives who may choose to remain present at the time and he
will enter the amount of the several tenders in a comparative statement in a suitable form. In the event
of a tender being accepted, the contractor shall thereupon for the purpose of identification, sign copies
of the specifications and other documents mentioned in this tender.
I. The GIDC shall have the right of rejecting all or any of the tenders, without assigning any reason
J. The contractor shall exhibit a board as per requirement of GIDC with detailed specification and details
of work and amount at site at his own cost as directed by the Engineer-in - charge.
K. CONDITION FOR EMPLOYEES PROVIDENT FUND AND MISC.PROVISION ACT-1952.
The contractor shall responsible for complying with the provision of the employee provident fund and
miscellaneous provision Act-1952 scheme and modifications of the Act from time to time. The
contractor shall get themselves enrolled with the Regional Provident Fund commissioner of any
competent officer appointed under the Act and shall have to get a separate number in respect of their
respective establishment as defined in Sec. 3 of the employees Provident Fund Act and shall discharge
all the liabilities arising out of the aforesaid Act as provided in Para 36A of the scheme and other
provisions of the Act.
“The Engineer – in – charge on receiving a report from the competent inspecting officer under the said
Act shall have the power to deduct from the payment to the contractor any sum required or estimated to
be required for making good the loss/suffered by the worker or workers by reason of non-fulfillment of
the condition of the contractor for the benefit of the workers under the said Act. The contractor shall
indemnity GIDC against any payment to be made for the observance of the regulations aforesaid.
The contractor shall produce the certificate and registration number with R.P.F.C. while entering into
agreement, the same shall be produced within one month from the date of work order. If the contractor
fails to produce proof of its registration R.P.F.C. and an amount of equal to 3% of the gross amount
payable to the contractor shall be recovered from his running account bills from the 1st R. A. Bill at the
rate of 3% of the gross amount of the R. A. Bill till the registration from R.P.F.C. is obtained and
produced to the GIDC. In all 3% on the total gross payment made for the work shall stands to be
recovered from the running account bills to contractor. If even till completion of works and deducting
the amount 3% contractor has not registered its establishment with R.P.F.C., Security Deposit when
payment shall also not be refunded till the clearance certificate of the compliance of the provisions of
the Act is obtained by the contractor and Produced to the Executive Engineer, contractor shall sign
indemnity bond in favor of GIDC but amount shall be withheld till R.P.F.C. registration certificate is
received by GIDC.
L. LABOUR CONTRACT ACT:
The contractor tendering for the work shall have to obtain licensee under the labour contractor
(Registration and Abolition) Act-1970 within a week of award of work and comply with all the
amenities for the amenity if not provided by the contractor such amenity shall be provided by the
Executive Engineer, as principal employees as his representative within the prescribed time and the
expenses incurred by the principal employer Providing the amenity shall be recovered by the amount
payable the contractor. The contractor shall Act in accordance with the provision of the Act in all
respect and shall above the principal employer from any consequence whatsoever.
Every Principal employer shall nominate a representative duly authorized by him to be present
at the time of disbursement of wages and it shall be the duty of such representative to certify the amount
paid as wages in such manner as may be prescribed.
In case, the contractor fails to make payment of wages within the prescribed period of payment of
wages in full or the unpaid balance due as the case may be, the correct Labour employed by the
contractor and recover the amount so paid from the contractor by deducting from any amount payable
to the contractor under any contract.
The contractor shall provide every facility to the principal employer to maintain registers and records
giving particulars of contract Labour employed. The nature of work performed by the contract Labour
the rates of wages paid to the contract Labour and such other particulars that are prescribed or may be
prescribed under the provisions of the said Act.
M. The Unit rates specified for various items to be executed as per Schedule – B attached with the Price
Bid are excluding GST but inclusive of all labors, materials, testing charges, Labour Cess & Other
taxes, equipment’s, all incidental charges involving in the work and as specified in the Mode of
measurement & payment of detailed specifications of items incl. all taxes, royalty, octroi, transportation
cost etc. all as applicable presently as to be enforced for future by any / all including Central/State
Government & Statutory bodies from time to time.
N. Income tax with surcharge shall be recovered from bill of contractor as per govt. Notification. Agency
may produce certificate from competent officer of sale tax department if deduction at source is not to be
O. All works shall be carried out as per PWD HB Vol. I & II and the specifications attached with the
technical bid or as directed by Engineer- in-charge.
P. Material delivered either in broken condition of non-confirming to the quality ordered shall not be
accepted and claim for whatever reason shall not be entertained.
Q. The tenderer shall have to give testing in presence of concern Engineer and test report shall be produce
along with materials.
R. Earnest money as mentioned in the memorandum of work in brief attached herewith shall be paid in the
form of DD/FDR for the minimum period of 180 days and documents for the same should be attached
with the technical bid only.
S. If the tender is taken in favor of the company a power of attorney/necessary authorization in favor of
the person who may have signed the tender for the company must accompany the tender.
T. The rate quoted include clearance of site (Prior to commencement of work & at its close) in all respects
and hold good for work under all conditions including site moisture, weather etc.
U. Any sort of correction or erasure in the tender shall not be done by the tenderer by applying white fluid
or any other chemical. The tenders with corrections made in aforesaid manner shall be out rightly
rejected by the Corporation if not initiated at corrected figures & words.
V. If any corrections, erasures or overwriting are required by the tenderer before submitting the tender, all
the corrections, shall be initiated by the tenderer only before submission of the tender, otherwise the
tender shall be rejected by the corporation.
W. The contractor shall have to furnish the Permanent Account No. Assessment No. & Ward under which
he is assessed.
X. The contractor shall have to furnish the True copy of the GST Registration and R.P.F.C. registration
Y. The contractor shall have to obtain the Insurance of all the labour, staff working at site and hand over
the receipt of Insurance Policy etc.
Z. The contractor will be required to pay cess of 1% of construction cost to the industrial safety and health
department Valsad/competent authority or by challan at respective treasury office or it will be deducted
All testing of material /output of processed material shall have to be got tested in a GERI/GIDC
approved laboratory, as defined in general/technical Specification/Item wise specification. The payment
for the testing charges to the laboratory shall be made by GIDC as per bill received. The testing charges
of an amount limited to 1% of estimated cost put to tender shall be deducted from the bills.
There are chances to occur some excess / extra items in the tender qty. based on actual work as finalised
by GIDC department. But the bidder shall not claim anything beyond tender terms and conditions.
Form B-1, if the quantity of any item exceeds the quantity as in the tender by more than 10% the
contractor will be paid for the quantity in excess of 10% at the rate entered in the SOR of the year
during which the excess in quantity is first executed or tender whichever is less. The same shall have to
be got approved from GIDC before execution by the bidder.
There are also chances that some items may not be required to execute / to execute in very less qty than
tendered quantity, as per finally approved decisions from GIDC. In this situation, the bidder shall not
have any right to claim anything extra for such items.
All Kinds of Material Test and Core Tests, NDT Tests for RCC works and Other Tests laboratory
charges for Asphalt Road works & all other components shall be paid by Bidders.
Bidder shall to submit all the required Mix Designs of the materials as per material specification for
approval of EIC prior to commencement of work.
BB. Joint Venture (J.V.) is not allowed.
CC. MAINTENANCE GUARANTEE PERIOD: As per B1 agreement
DD. SUPERVISION OF WORK:
GIDC reserves rights to get check the quality of works through THIRD PARTY INSPECTION also
in addition to the Engineer-in-charge & Quality Control Units of the GIDC.
EE. SECURED ADVANCE & MOBILIZATION ADVANCE:
Secured advance and mobilization advance shall not be paid by GIDC.
FF. PRICE ESCALATION:
GG. SURVEYING & MEASURING EQUIPMENTS:
Equipment for surveying & measurement on the work shall be procured by the contractor for his
use. The same also is made available to the Engineer at site or any work connected with the contract
without any additional charges.
HH. UNITS RATES UNDER SCHEDULE “B”:
The Unit rates specified for various items to be executed as per Schedule – B attached with the
Price Bid are excluding GST but inclusive of all labors, materials, testing charges, Labour Cess &
Other taxes, equipment’s, all incidental charges involving in the work and as specified in the Mode
of measurement & payment of detailed specifications of items incl. all taxes, royalty, octroi,
transportation cost etc. all as applicable presently as to be enforced for future by any / all including
Central/State Government & Statutory bodies from time to time.
II. PERFORMANCE BOND / BANK GUARANTEE OF NATIONALIZED BANK:
The contractor shall have to execute the Performance Bond / Bank Guarantee of Nationalized
schedule bank amounting to (5 % of estimated cost put to tender) in the given format attached
herewith or in the format as approved by the GIDC and shall be for validity period of 5 Years with
effect from the date of work order. The banker shall confirm this every year.
N.S.C. / F.D. / S.S.N.N.L. shall also be acceptable in favor of the EE, GIDC, Vapi
The performance Bond / B.G. or N.S.C. / F.D. / S.S.N.N.L. shall become refundable as per clause
The tenderer shall have to make arrangement for providing accommodation for housing office for
the departmental staff and laboratory for quality control etc. at two locations of work site, details of
which are as under:
(i) Office:6.00 MX 6.00 M(Minimum-Facility should be as mentioned Memorandum of work)
(ii) Laboratory:6.00 M X 6.00 M (Minimum)
The above structure shall be semi- permanent type.
Bidders signature Executive Engineer
PERFORMANCE BOND
(See Clause No. 1) –
(The date of the bond must not be prior to the date of the instrument in connection with which it is given)
Sum of Bond (in words and figures): ______________________________________________
Contract No. & Date of Contract: ______________________________________________
KNOW ALL MEN BY THESE PRESENTS, THAT WE, THE PRINCIPAL AND SURETY above named, are
held and firmly bound unto the Executive Engineer, GIDC, Ahmedabad (hereinafter called the “Employer”) in
the amount stated above, for payment of which sum, well and truly to be made, we bind ourselves, our heirs,
executors, administrators and successors, jointly and severally, firmly by these presents, subject to the
provisions of which the aforesaid Contractor on demand and without demand on a claim being made by the
THE CONDITION OF THIS OBLIGATION IS SUCH, that whereas the Principal has entered into a contract
with the Employer, numbered and dated as shown above, and hereto attached, for the execution of the work:
“Providing and fixing barbed wire fencing with CC pole at Khoraj land. ”
NOW THEREFORE, if the Principal shall well and truly perform and fulfil all the undertakings, covenants,
terms, conditions and agreements of the said contract during its original term and any extensions granted by the
Employer, with or without notice to the surety, and during the life of any guarantee required under the contract,
and shall also well and truly perform and fulfil all the undertakings, covenants, terms, conditions and
agreements of any duly authorised modifications of the said contract that may hereafter be made (notice of
which modifications to the surety being hereby waived), or shall pay over, make good and reimburse to the
Employer all loss and damage which the Employer may sustain by reason of failure or default on the part of the
said Principal so to do, then this obligation shall be void; otherwise it shall remain in full force and effect.
We further agree that the guarantee herein contained shall remain in full force and effect during the entire
period that would be taken for the performance of the said contract and shall continue to be enforceable till all
the dues of the Employer under or by virtue of the contract have been fully paid and its claims satisfied or
discharged, or till the Employer certifies that the terms and conditions of the contract have been fully and
properly carried out by the said Contractor and accordingly discharges this guarantee. Unless a demand or claim
under this guarantee is made on us in writing on or before _______________, we shall be discharged from all
liability under this guarantee thereafter.
IN WITNESS WHEREOF, the above-bound parties have executed this instrument under their several seals on
the date indicated above, the name and corporate seal of each corporate party being hereto affixed, and these
presents duly signed by its undersigned representative, pursuant to the authority of its governing body.
IN THE PRESENT OF WITNESS INDIVIDUAL
(1) as to (Seal)
(2) as to (Seal)
(3) as to (Seal)
(4) as to (Seal)
by affix corporate seal
Attested Corporate Surety
Business address:
Affix by Corporate
BIDDER’S SIGNATURE
FREE MAINTENANCE GUARANTEE BOND
Whereas ____________________ (Name of Agency) ____________________ has been awarded a contract
dated ____________ for the work of “Providing and fixing barbed wire fencing with CC pole at Khoraj
Whereas the said Agency has approached ____________________ (Name of Bank) ____________________ to
provide a Free Maintenance Guarantee Bond to GIDC, Ahmedabad Division, for the work undertaken by the
said Agency, and whereas the said Bank has agreed to provide such a Free Maintenance Guarantee Bond;
NOW, THEREFORE, we, the said Bank, provide the following Free Maintenance Bank Guarantee by way of
this bond to GIDC, Ahmedabad Division.
1) The contract value of the contract awarded to the said Agency by GIDC is Rs. ____________________
(Rupees ____________________________________). This guarantee, in the nature of a Free Maintenance
Guarantee, is provided so as to ensure and indemnify GIDC for full and proper performance of the contract by
the said Agency and the Bank. We hereby indemnify GIDC for all losses and/or damages to the pipeline,
valves, chambers, thrust blocks and other works executed under this contract, and agree and promise that in the
event of the Agency not repairing or remedying any problem, loss or damage to the said works, we shall
indemnify and pay GIDC such expenses, losses and damages as may be incurred by GIDC as a result of GIDC
getting the work done itself or from another source.
2) We agree and understand that the decision as to whether any loss or damage to the works has taken place,
and whether the remedial work has been carried out to the satisfaction of the Executive Engineer, GIDC,
Ahmedabad, shall rest with the Executive Engineer, GIDC, Ahmedabad, and such decision shall be final and
binding on us. On the Executive Engineer notifying us of the total expenses incurred for such remedial work,
we undertake to pay GIDC the said amount forthwith, and in any case not later than thirty days from such
This Free Maintenance Guarantee is limited to 5% of the contract value, i.e. Rs. ____________________
(Rupees ____________________________________). Our liability shall in all cases be limited to this amount.
4) We agree that this Free Maintenance Guarantee shall be valid for a period of FIVE YEARS from the date on
which the contract work is certified as completed by the Agency. The Executive Engineer, GIDC, Ahmedabad
shall notify us of such completion date.
5) We agree that this Free Maintenance Guarantee, being a demand guarantee, shall be binding and enforceable
against us irrespective of any dispute or difference between GIDC and the Agency, or between us and the
6) In case any dispute arises as to the interpretation of this Free Maintenance Guarantee, the matter shall be
referred to the Civil Court at Ahmedabad, whose decision shall be final. In case any recourse to a court of law is
necessitated, the Civil Court at Ahmedabad alone shall have jurisdiction.
Notwithstanding anything contained herein above, our liability under this guarantee is restricted to Rs.
____________________ (Rupees ____________________________________), and it shall remain in force for
FIVE YEARS from the date of issue. Unless a demand or claim under this Free Maintenance Guarantee Bond is
filed against us on or before ______________ (date), all rights under this bond shall stand forfeited with effect
from that date, and we shall be relieved and discharged from all liability hereunder, whether or not the original
guarantee is returned to us.
Date this ______ day of ____________ 20____, at Ahmedabad.
For (Name of Bank)
GENERAL TECHNICAL SPECIFICATION
Providing and fixing G.I. barbed wire fencing of 1.60 m height using pre-stressed precast reinforced cement
concrete posts of size 100 mm × 100 mm and 2.13 m overall height, reinforced with 4 Nos. of 3 mm diameter
mild steel bars, including excavation and fixing of posts at 3.00 m centre-to-centre spacing in cement concrete
foundation blocks of size 0.50 m × 0.50 m × 0.50 m in C.C. 1:2:4, including all materials, labour, tools and
equipment required for proper execution of the work.
The fencing shall consist of 5 horizontal strands and 2 diagonal strands of G.I. barbed wire, properly stretched
and securely fixed to the concrete posts with suitable G.I. binding/fixing arrangements. Two diagonal cross-
supports shall be provided at corners, ends and at suitable locations at intervals not exceeding 30 m length, as
required for maintaining adequate stability and tension of the fencing.
The item shall include all necessary excavation, disposal of surplus earth, preparation of foundation, supply and
fixing of precast concrete posts, foundation concrete, G.I. barbed wire, binding/fixing materials, diagonal
supports, alignment, levelling, stretching, tensioning and all incidental works complete in all respects as
directed by the Engineer-in-Charge.
Measurement: The fencing shall be measured in running meter (Rmt.) of completed fencing along the center
line, including all posts, foundation blocks, barbed wire, supports and fixing arrangements.
Barbed G.I. wire Fencing barbed G.I. wire, barbed wire weighing 9.38 kg per 100 m (minimum) between the
two posts fitted and fixed with G.I. staples, turn buckles etc. complete. Accessories - G.I. staples and turn
buckles G.I. Barbed Wire The barbed wire shall be of galvanized steel as specified and it shall conform to IS
278. The sampling criteria is given in Table 1. The wire shall be manufactured from steel by any process and
shall not contain Sulphur and phosphorous exceeding 0.065 per cent.
The galvanized steel barbed wires shall be of Type B (Glidden Type): The barbs shall have four points and shall
be formed by twisting two-point wires, each two turns, tightly around one line wire making altogether four
complete turns. Details of G.I. Barbed wire. The galvanized steel barbed wire shall be of the size designations
given in Table 1. Note: The mass in g/m shall be obtained by dividing the total mass of the reel by the linear
length in meters. The number of lays between the two consecutive barbs shall very between 2 to
The barbed wire shall be formed by twisting together two-line wires, one or both containing the barbs. The size
of the line and point wires and barb spacings shall be as specified. The permissible deviation from the nominal
diameter of the line wire and the point wire shall not exceed + 0.08 mm. The line and point wires shall be
circular in section, free from scales and other defects and shall be uniformly galvanized. The line wire, shall be
in continuous lengths, and shall not contain any welds other than those in the rod before it is drawn.
It shall have the tensile properties as specified in
A list of Bureau of Indian Standards (BIS) codes, CPHEEO Manual on Water Supply & Treatment provisions,
and relevant Government of Gujarat/GIDC circulars have been made use of in the preparation of these
specifications. The latest edition of all specifications/standards in force up to 30 (thirty) days before the final
date of submission of tender shall be adopted.
2) DEFINITIONS:
The words ‘Contract’, ‘Contractor’, ‘Engineer’ (synonymous with Engineer-in-charge), ‘Drawings’,
‘Employer’, ‘Government’, ‘GIDC’, ‘Works’ and ‘Work Site’ used in this specification shall carry the
meanings assigned to them in the General Conditions of Contract. Abbreviations used: ASTM – American
Society for Testing and Materials; BS – British Standard; CPHEEO – Central Public Health & Environmental
Engineering Organisation; IS – Indian Standard published by the Bureau of Indian Standards; MoHUA –
Ministry of Housing & Urban Affairs; PWD – Public Works Department.
3) MATERIAL & TEST STANDARDS:
The relevant standards of materials, as well as the testing procedures, have been indicated at the appropriate
places in the item-wise specifications or the referenced IS Codes/CPHEEO Manual.
4) SCOPE OF WORK:
The work to be carried out under the contract shall consist of the various items generally described in the tender
documents and in the Bill of Quantities (Schedule ‘B’) furnished with the tender. The scope shall include
compliance by the contractor with all General Conditions of Contract, whether specifically mentioned or not,
and shall include all materials, apparatus, plant, equipment, tools, fuel, watering, shoring/strutting, timbering,
transport, offices, stores, workshop, staff, labour, and the provision of proper and sufficient protective works,
diversions, temporary fencing and lighting. It shall also include safety of workers, first-aid equipment, suitable
accommodation for staff and workmen with adequate sanitary arrangements, effecting and maintaining all
insurances, payment of wages/salaries/fees/royalties/duties/other charges, and the regular clearance of rubbish,
reinstatement and cleaning up of the site on completion, safety of the public, and protection of the works and
adjoining land/property/utilities.
The contractor shall ensure that quality assurance is built into the planning and execution of the work, covering
setting out, selection of materials, selection of construction method, selection of equipment and plant,
deployment of personnel and supervisory staff, and quality control/testing at all stages. This shall be deemed to
be covered within the scope of work.
5) REFERENCE STANDARDS & BOOKS:
The work included in this contract shall be carried out in accordance with the specifications, rules and
regulations laid down in: (i) CPHEEO Manual on Water Supply & Treatment, Ministry of Housing & Urban
Affairs, Government of India – latest revision; (ii) relevant IS Codes referred to in the item-wise specifications
(IS 3589, IS 5822, IS 13095, IS 14845, IS 1538, IS 456, IS 383 etc.); (iii) GWSSB/GIDC Schedule of Rates and
standard specifications; (iv) PWD Handbook Vol. I & II. If the above reference documents fall short for any
item of this contract, reference shall be made to the latest Indian Standard Specification; and where an item is
not covered by any of the above, the details/specification directed by the Engineer-in-charge/Consultant/TPI
authority appointed by GIDC shall be final.
6) GENERAL CONDITIONS REGARDING USE OF EQUIPMENT:
(i) The contractor shall give a trial run of the equipment to establish its capability to achieve the laid-down
specifications and tolerances, to the satisfaction of the Engineer, before commencement of the work. (ii) All
equipment provided shall be proven efficient and shall be operated and maintained at all times in a manner
acceptable to the Engineer. (iii) All plant/equipment to be deployed shall be got approved by the Engineer for
fitness and efficiency before commencement of work. (iv) Any material or equipment not meeting the
Engineer's approval shall be removed from site forthwith. (v) No equipment or personnel shall be removed from
site without the Engineer's permission. (vi) The contractor shall make available equipment for site quality
control work as directed by the Engineer.
7) CONTRACT DRAWINGS:
The contract drawings provided for tendering purposes are included in the tender documents for reference only.
Working/good-for-construction drawings, on the basis of which actual execution is to proceed, shall be
furnished by the contractor with proof-checking as suggested by the Department. Examination and/or approval
by the Engineer of any drawings or documents submitted by the contractor shall not relieve the contractor of his
responsibilities and liabilities under the contract.
8) PROGRAMMING: The Executive Engineer may, at any time, give directions as to the order and manner in
which the several parts of the work shall be carried out, and the contractor shall strictly observe such directions.
The contractor shall at all times be responsible for any damage or trespass committed by his agents and
workpeople in carrying out the work, unless such action is authorised by the Executive Engineer.
9) PERMITS & LICENSES: The contractor shall procure, at his sole expense, all permits and licences and
pay all charges/fees required for lawful execution of the work, including any permissions required from
road/railway/highway/canal/gas-oil pipeline/electrical/telecommunication authorities for the trenchless
crossings under this contract.
10) INSPECTION OF WORKS & MATERIALS: The inspection of work shall not relieve the contractor of
his obligation to fulfil the terms of the contract as prescribed by the plans and specifications. The contractor
shall furnish written information to the Engineer-in-charge regarding the original source of supply and dates of
manufacture of all materials brought to site, at least two weeks (or as directed) in advance of their
use/incorporation in the work. Failure to reject defective work or material at any time shall not prevent its later
rejection when the defect is discovered, up to final acceptance.
Bidder's Signature Executive Engineer,
GIDC, Ahmedabad
GENERAL SPECIFICATION FOR QUALITY CONTROL ON WORKS &
a. The contractor shall be responsible for the quality of work in the entire construction within the contract, and
shall have his own independent and adequate set-up for ensuring the same. He shall provide necessary co-
operation and assistance in obtaining samples for tests and carrying out field tests as required by the
Engineer-in-charge from time to time, including labour, attendance, packing and dispatch, and any other
assistance considered necessary in connection with the test.
b. All materials used, methods adopted and works performed shall be strictly in accordance with the
requirements of this specification and the item-wise specifications. The contractor shall set up a field
laboratory at a location approved by the Engineer, equipped with adequate equipment and personnel to
carry out all required tests and quality control work – particularly for pipe coating/lining integrity (holiday
testing), welding (visual/NDT), concrete for thrust blocks and chambers, and hydrostatic/pressure testing of
the pipeline. The list of equipment and facilities shall be got approved by the Engineer-in-charge in
advance. The contractor's laboratory shall be manned by a qualified materials/civil engineer, assisted by
experienced technicians, and the set-up shall be approved by the Engineer.
c. The contractor shall carry out quality control tests to the frequency stipulated in the item-wise specifications
and the CPHEEO Manual. In the absence of clear indication of method/frequency for any item, the
instructions of the Engineer shall be followed. Quality control tests will also be conducted independently by
the Site Engineer-in-charge and by the Third Party Quality Assurance (TPQA) agency or consultant
appointed by GIDC, and additional tests may be conducted wherever the Engineer considers necessary.
d. Construction of a subsequent layer, pour, or jointing operation shall proceed only after obtaining the
Engineer's permission for the preceding stage (e.g., trench bed/bedding before pipe laying, weld acceptance
before joint coating, chamber base slab before walls). The contractor shall carry out modifications in the
procedure of work, if found necessary, as directed by the Engineer during inspection. Work falling short of
the specified quality shall be rectified/redone by the contractor at his own cost, and defective work/material
shall be removed from site at his own cost.
e. For testing of samples of soil, granular material, cement, steel, concrete cubes, pipe coating/lining and other
materials, samples in the required quantity and form shall be supplied to the Engineer by the contractor at
his own cost. Where essential tests are required to be carried out at the manufacturer's plant or at a
laboratory other than the site laboratory (e.g., factory hydrostatic testing and coating/lining tests of M.S.
pipe, valve testing as per IS 13095/IS 14845), the cost of samples, sampling, testing and furnishing of test
certificates shall be borne by the contractor, who shall also furnish the test certificates to the Engineer. All
testing charges involved in the entire work shall be borne by the contractor.
(2) DEFECTIVE MATERIALS:
All materials which the Engineer/QC Unit of GIDC/Third Party Inspector appointed by GIDC determines as not
conforming to the requirements of the contract shall be rejected, whether in place or not, and shall be removed
immediately from the site as directed. Rejected material subsequently collected shall not be used in the work
unless approval is accorded in writing by the Engineer. Upon failure of the contractor to comply with any such
order, the Engineer/QC Unit/TPI shall have the authority to cause removal of the rejected material and to deduct
the removal and allied cost from any payment due to the contractor.
(3) CONTROL OF ALIGNMENT, LEVELS & TOLERANCES:
All work performed shall conform to the lines, grades, invert levels and dimensions shown on the drawings or
as directed by the Engineer-in-charge, subject to the following permitted tolerances, unless a more stringent
tolerance is specified in the item-wise specification or by the pipe/valve manufacturer:
Parameter Permitted Tolerance
Trench alignment (horizontal, centre line of pipe) ± 25 mm
Pipe invert level / trench bed level ± 15 mm
RCC chamber/manhole plan dimensions ± 10 mm
Thickness of sand bedding / PCC levelling course – 0 mm, + 10 mm
Concrete member dimensions (thrust block, chamber As per IS 456, Table
Bidder's Signature Executive Engineer,
GIDC, Ahmedabad
SPECIFICATION OF MATERIALS
Ordinary Portland Cement
Conforming to IS 269 / IS 8112 / IS 12269, of grade as specified for the relevant concrete grade (M-15/M-
25/M-30). Cement shall be fresh, free from lumps, and stored as per IS 4082. Test certificates shall be furnished
for each batch/lot used.
Fine & Coarse Aggregate
Conforming to IS 383, clean, hard, durable, free from organic impurities, clay lumps and deleterious material.
Coarse aggregate (granite/quartzite trap metal) of size 12 mm to 20 mm and/or 6 mm to 12 mm as specified in
the item-wise specification.
Reinforcement Steel
High Strength Deformed (HSD) TMT bars of Fe-500 grade conforming to IS 1786, cut, bent and placed as per
IS 2502 and the approved structural drawings.
Clean, potable, free from oil, acid, alkali, salts and organic matter, conforming to IS 456 Clause 5.4, suitable for
both concrete mixing/curing and pipeline flushing/disinfection.
Barbed G.I wire
Barbed G.I. wire Fencing barbed G.I. wire, barbed wire weighing 9.38 kg per 100 m (minimum) between the
two posts fitted and fixed with G.I. staples, turn buckles etc. complete. Accessories - G.I. staples and turn
buckles G.I. Barbed Wire The barbed wire shall be of galvanized steel as specified and it shall conform to IS
278. The sampling criteria is given in Table 1. The wire shall be manufactured from steel by any process and
shall not contain Sulphur and phosphorous exceeding 0.065 per cent. The galvanized steel barbed wires shall be
of Type B (Glidden Type) : The barbs shall have four points and shall be formed by twisting two-point wires,
each two turns, tightly around one line wire making altogether four complete turns.
Details of G.I. Barbed wire. The galvanized steel barbed wire shall be of the size designations given in Table
Note : The mass in g/m shall be obtained by dividing the total mass of the reel by the linear length in metres.
The number of lays between the two consecutive barbs shall very between 2 to 7. The barbed wire shall be
formed by twisting together two-line wires, one or both containing the barbs. The size of the line and point
wires and barb spacings shall be as specified. The permissible deviation from the nominal diameter of the line
wire and the point wire shall not exceed + 0.08 mm. The line and point wires shall be circular in section, free
from scales and other defects and shall be uniformly galvanized. The line wire, shall be in continuous lengths,
and shall not contain any welds other than those in the rod before it is drawn.
M.S. Pipe & Specials
Electric Submerged Arc Welded (ESAW) Mild Steel pipe of 610 mm OD x 10 mm thickness conforming to IS
3589:2001, internal solvent-free liquid epoxy lining (406 micron) and external 3-LPE coating (or cement-mortar
guniting, as finally confirmed – see the item-wise specification note on Items 6 & 8), with fabricated M.S.
specials (bends/tees/reducers) above 300 mm dia.
Shuttering Material
Steel or approved plywood shuttering (Marino/Duro/Green/Century/Archidply/Monarch or equivalent) for
centering/formwork of thrust blocks, chambers and other RCC components.
All materials shall be procured only after the contractor has submitted samples, test certificates and (where
applicable) manufacturer's type-test/QAP documents for approval of the Engineer-in-charge. Materials not
conforming to the above standards or found unsuitable shall be rejected and removed from site at the
contractor's cost. Where a material is not specifically covered above, the relevant clause of the item-wise
specification, or the latest IS Code, shall govern.
Bidder's Signature Executive Engineer, GIDC,
CODE OF PRACTICE
The method of execution of the items of work shall conform to the relevant specifications of the latest
version of the applicable Indian Standard, unless specified otherwise in the item-wise specification, and as
far as applicable. Wherever a reference to any Indian Standard appears in this specification, it shall be taken
to mean the latest version of that standard, in force up to 30 days before the final date of submission of
The contractor shall invariably carry out material and work tests as specified in the tender document (B-1
Form) and in the applicable IS Code, in addition to any further tests that the Engineer-in-charge may
reasonably require. All tests shall be carried out in Government or Engineer-approved laboratories, entirely
at the contractor's cost. No collection of material shall be made before it is approved by the Engineer-in-
charge. Satisfactory test results at one stage shall not absolve the contractor from dismantling and redoing
any work later found to be defective, without any claim for payment or compensation on that account.
Detailed, item-specific codes of practice, applicable methods of construction, measurement and mode of
payment for each of the 22 civil items of this contract – excavation, sand bedding, M.S. pipe supply,
specials, laying/jointing/welding, valves, concrete for thrust blocks, reinforcement, RCC chambers,
trenchless crossings, refilling, dewatering, trial pits, job connections and ROU/ROW – are given in Section
10, ‘Detailed Specification of Civil Items’, so as to avoid repeating the same matter twice in this Volume.
This is a deliberate structural simplification from the sample document (where ‘Code of Practice’ and ‘Detail
Specification of civil items’ were two separate, overlapping item-wise sections); please confirm this
consolidation is acceptable, or ask me to split them back into two sections if GIDC's format requires it.
The following principal codes/standards govern the work under this contract: IS 3589 (Electric
resistance/submerged arc welded steel pipes for water/sewage), IS 5822 (Code of practice for laying welded
steel pipes), IS 13095 (Butterfly valves), IS 14845 (Kinetic air valves), IS 1538 (Cast iron fittings for
pressure pipes), IS 780 (Sluice valves), IS 456 (Plain & reinforced concrete), IS 3370 (Concrete structures
for storage of liquids), IS 383 (Coarse & fine aggregates), IS 1786 (HSD bars/TMT), IS 2502 (Bending &
fixing of bars), IS 2720 (Methods of test for soils), IS 3114 (Code of practice for laying of cast iron pipes),
IS 1200 (Method of measurement of building & civil engineering works), and the CPHEEO Manual on
Water Supply & Treatment (MoHUA).
Bidder's Signature Executive Engineer,
GIDC, Ahmedabad
LIST OF INDIAN STANDARDS & APPROVED MAKES / BRANDS
List of Indian Standards Referred
- IS 3589:2001 – Electric resistance/submerged arc welded steel pipes for water & sewage
- IS 5822 – Code of practice for laying of welded steel pipes
- IS 13095 – Butterfly valves for general purposes
- IS 14845 – Kinetic air valves for water works purposes
- IS 1538 – Cast iron fittings for pressure pipes
- IS 780 – Sluice valves for water works purposes
- IS 1536 – Centrifugally cast (spun) iron pressure pipes
- IS 456 – Code of practice for plain & reinforced concrete
- IS 3370 – Code of practice for concrete structures for storage of liquids
- IS 383 – Coarse & fine aggregates for concrete
- IS 1786 – High strength deformed steel bars & wires
- IS 2502 – Code of practice for bending & fixing of bars for concrete reinforcement
- IS 10262 – Concrete mix proportioning – guidelines
- IS 2720 (relevant parts) – Methods of test for soils
- IS 1200 – Method of measurement of building & civil engineering works
- IS 4098 – Specification for lead for caulking cast iron pipe joints (if applicable to any DI fitting)
Recommended Brands / Manufacturers of Civil Items
Material Approved Make / Manufacturer
Ordinary Portland Cement Ultratech, Ambuja, Birla, Sanghi, or any other
make approved by GIDC
Barbed G.I. wire Preferable Makes: TATA, ZINDAL or equivalent
Bidder's Signature Executive Engineer,
DETAILED SPECIFICATION OF CIVIL ITEMS
ITEM WISE SPECIFICATION: - PROVIDING AND FIXING BARBED WIRE FENCING
WITH CC POLE AT KHORAJ LAND.
Providing and fixing chain link / barbed wire fencing 1.60 m height using pre-stressed precast
concrete posts of size 10 cm x10 cm and 2.13 m height (reinforced with 4 nos. of 3 mm mild
steel bars), fixed at 3.0 m center-to-center spacing in foundation blocks of 0.50 x 0.50x
MTR in cement concrete (1:2:4), including two diagonal cross-supports at corners/ends for
every 30 m length. The fencing comprises 5 horizontal strands and 2 diagonal strands of G.I.
barbed wire (9.38 Kg/100mt)
Providing and fixing G.I. barbed wire fencing of 1.60 m height using pre-stressed precast reinforced cement
concrete posts of size 100 mm × 100 mm and 2.13 m overall height, reinforced with 4 Nos. of 3 mm diameter
mild steel bars, including excavation and fixing of posts at 3.00 m centre-to-centre spacing in cement concrete
foundation blocks of size 0.50 m × 0.50 m × 0.50 m in C.C. 1:2:4, including all materials, labour, tools and
equipment required for proper execution of the work.
The fencing shall consist of 5 horizontal strands and 2 diagonal strands of G.I. barbed wire, properly stretched
and securely fixed to the concrete posts with suitable G.I. binding/fixing arrangements. Two diagonal cross-
supports shall be provided at corners, ends and at suitable locations at intervals not exceeding 30 m length, as
required for maintaining adequate stability and tension of the fencing.
Excavation for concrete pole in line including stacking excavated stuff including up to all required lead cleaning
the site etc. complete for all lifts and strata as specified. To speed up & complete the barbed-wire fencing work
in time line, use a tractor-mounted PTO post-hole digger (auger).
The item shall include all necessary excavation, disposal of surplus earth, preparation of foundation, supply and
fixing of precast concrete posts, foundation concrete, G.I. barbed wire, binding/fixing materials, diagonal
supports, alignment, levelling, stretching, tensioning and all incidental works complete in all respects as
directed by the Engineer-in-Charge.
Measurement: The fencing shall be measured in running meter (Rmt.) of completed fencing along the center
line, including all posts, foundation blocks, barbed wire, supports and fixing arrangements.
Barbed G.I. wire Fencing barbed G.I. wire, barbed wire weighing 9.38 kg per 100 m (minimum) between the
two posts fitted and fixed with G.I. staples, turn buckles etc. complete. Accessories - G.I. staples and turn
buckles G.I. Barbed Wire The barbed wire shall be of galvanized steel as specified and it shall conform to IS
278. The sampling criteria is given in Table 1. The wire shall be manufactured from steel by any process and
shall not contain Sulphur and phosphorous exceeding 0.065 per cent.
The galvanized steel barbed wires shall be of Type B (Glidden Type): The barbs shall have four points and shall
be formed by twisting two-point wires, each two turns, tightly around one line wire making altogether four
complete turns. Details of G.I. Barbed wire. The galvanized steel barbed wire shall be of the size designations
given in Table 1. Note: The mass in g/m shall be obtained by dividing the total mass of the reel by the linear
length in meters. The number of lays between the two consecutive barbs shall very between 2 to
The barbed wire shall be formed by twisting together two-line wires, one or both containing the barbs. The size
of the line and point wires and barb spacings shall be as specified. The permissible deviation from the nominal
diameter of the line wire and the point wire shall not exceed + 0.08 mm. The line and point wires shall be
circular in section, free from scales and other defects and shall be uniformly galvanized. The line wire, shall be
in continuous lengths, and shall not contain any welds other than those in the rod before it is drawn.
It shall have the tensile properties as specified in
A list of Bureau of Indian Standards (BIS) codes, CPHEEO Manual on Water Supply & Treatment provisions,
and relevant Government of Gujarat/GIDC circulars have been made use of in the preparation of these
specifications.
The measurement & payment shall be based on per "Rmt" basis.
Clearing and grubbing road land including uprooting rank vegetation grass bushes, shrubs,
sapling and trees girth up to 300 mm removal of stumps of trees cut earlier and disposal of
unserviceable materials (C) By mechanical means in area of light jungle.
This work shall consist of cutting, removing and disposing of all materials such as trees,
bushes, shrubs, stumps, roots, grass, weeds, top organic soil not exceeding 150 mm in
thickness, rubbish etc., which in the opinion of the Engineer are unsuitable for incorporation
in the works, from the area of road land containing road embankment, drains, cross-drainage
structures and such other areas as may be specified on the drawings or by the Engineer. It
shall include necessary excavation, backfilling of pits resulting from uprooting of trees and
stumps to required compaction, handling, salvaging, and disposal of cleared materials.
Clearing and grubbing shall be performed less than one month in advance of earthwork
operations and in accordance with the requirements of these specifications. Areas requiring
clearing and grubbing shall be determined by the Engineer. The contractor shall arrange for
all the permissions from competent government authorities for completion of this item.
2.2. Preservation of Property/Amenities
Roadside trees, shrubs, any other plants, pole lines, fences, signs, monuments, buildings,
pipelines, sewers and all highway facilities within or adjacent to the highway which are not to
be disturbed shall be protected from injury or damage. The Contractor shall provide and
install at his own expense, suitable safeguards approved by the Engineer for this purpose.
During clearing and grubbing, the Contractor shall take all adequate precautions against soil
erosion, water pollution, etc., and where required, undertake additional works to that effect
vide Clause 306. Before start of operations, the Contractor shall submit to the Engineer for
approval, his work plan including the procedure to be followed for disposal of waste materials
etc., and the schedules for carrying out temporary and permanent erosion control works as
stipulated in Clause 306.3.
2.3. Methods, Tools and Equipments
Only such methods, tools and equipment as are approved by the Engineer and which will not
affect the property to be preserved shall be adopted for the Work. If the area has thick
vegetation/roots/trees, a crawler or pneumatic tyred dozer of adequate capacity may be used
for clearance purposes. The dozer shall have ripper attachments for removal of tree stumps.
All trees, stumps, etc., falling within excavation and fill lines shall be cut to such depth below
ground level that in no case these fall within 500 mm of the subgrade. Notwithstanding the
above provisions, the Contractor shall obtain the Engineers express approval before
removing any trees with diameter greater than 100mm. Also, all vegetation such as roots,
under-growth, grass and other deleterious matter unsuitable for incorporation
in the embankment/subgrade shall be removed between fill lines to the satisfaction of the
Engineer. On areas beyond these limits, trees and stumps required to be removed as
directed by the Engineer shall be cut down to 1 m below ground level so that these do not
present an unsightly appearance.
All branches of trees extending above the roadway shall be trimmed as directed by the
All excavations below the general ground level arising out of the removal of trees, stumps,
etc., shall be filled with suitable material and compacted thoroughly so as to make the
surface at these points conform to the surrounding area.
Ant-hills both above and below the ground, as are liable to collapse and obstruct free subsoil
water flow shall be removed and their workings, which may extend to several meters, shall
be suitably treated.
2.4 Disposal of Materials
All materials arising from clearing and grubbing operations shall be the property of
Government and shall be disposed of by the Contractor as hereinafter provided or directed
by the Engineer.
Trunks, branches and stumps of trees shall be cleaned of limbs and roots and stacked. Also
boulders, stones and other materials usable in road construction shall be neatly stacked as
directed by the Engineer. Stacking of stumps, boulders, stones etc., shall be done at
specified spots with all lifts.
All products of clearing and grubbing which, in the opinion of the Engineer, cannot be used or
auctioned shall be cleared away from the roadside in a manner as directed by the Engineer.
Care shall be taken to see that unsuitable waste materials are disposed of in such a manner
that there is no likelihood of these getting mixed up with the materials meant for
embankment, subgrade and road construction.
2.5. Measurements for Payment
Clearing grubbing for road embankment, drains and cross-drainage structures shall be
measured on area basis in terms of hectares. Clearing and grubbing of borrow areas shall be
deemed to be a part of works preparatory to embankment construction and shall be deemed
to have been included in the rates quoted for the embankment construction item and no
separate payment shall be made for the same. Cutting of trees up to 300 mm in girth
including removal of stumps and roots, and trimming of branches of trees extending above
the roadway shall be considered incidental to the clearing and grubbing operations.
The payment shall be made on unit of a Hectare.
Bidder's Signature Executive Engineer, GIDC,
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Khoraj PQ.pdf
Khoraj Praice Bid.pdf
Khoraj Technical Bid.pdf
B1 Agreement Part 1-compressed.pdf
B1 Agreement Part 2-compressed.pdf
B1 Agreement Part 2-compressed.pdf
CORRIGENDUM
B1 Agreement Part 1-compressed.pdf
CORRIGENDUM
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .