Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹23.2 LAccepted-AOC BALUSSERY GRAMA PANCHAYATH | L1 | Accepted-AOC L1 | |
| 2 | L2₹23.7 L+₹43,373.84 (1.87%)Rejected-Finance KOYILANDY MUNICIPALITY KOYILANDY KERALA | L2 | Rejected-Finance L2 | |
| 3 | Rejected-Technical | - | Rejected-Technical L4 | |
| 4 | Rejected-Technical | - | Rejected-Technical L5 | |
| 5 | Rejected-Technical | - | Rejected-Technical L3 |
| Sl No | Description | Qty | Unit | BALAN NAIR C M L2 | MURALEEDHARAN T L4 | RASHID KM L3 | RAHUL C M L5 | SUMESH L1 |
|---|---|---|---|---|---|---|---|---|
| 1.00Pond | ||||||||
| 1.00 | 50.2.33.6:Cutting branches of trees overhanging above any structures of girth between 60cm to 90cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete | 3 | each | 583.65 ₹1,750.95 | 551.03 ₹1,653.09 | 2,700 ₹8,100 | 400 ₹1,200 Lowest | 569 ₹1,707 |
| 1.00 | 30.2.12:Uprooting rank vegetation and weeds by digging the area to a depth of 60 cm, removing all weeds and other growth with roots by forking repeatedly, breaking clods, rough dressing, flooding with water, uprooting fresh growths after 10 to 15 days and then fine dressing for planting new grass, including disposal of all rubbish with all leads and lifts. | 30 | sqm | 77.94 ₹2,338.2 | 74.23 ₹2,226.9 | 63 ₹1,890 | 50 ₹1,500 Lowest | 76 ₹2,280 |
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 225 | cum | 310.59 ₹69,882.75 | 311.14 ₹70,006.5 | 216 ₹48,600 Lowest | 270 ₹60,750 | 303 ₹68,175 |
| 1.00 | 50.2.3.1:Pumping or Bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pumpset, etc complete | 270 | hour | 298.34 ₹80,551.8 | 286.4 ₹77,328 | 63 ₹17,010 Lowest | 280 ₹75,600 | 290 ₹78,300 |
| 1.00 | OD195172/2025-2026:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site | 274.23 | cum | 3,330 ₹9,13,189.23 Lowest | 3,687.93 ₹10,11,344.73 | 3,930 ₹10,77,727.83 | 3,550 ₹9,73,520.05 | 3,363 ₹9,22,238.85 |
| 1.01 | 7.1.1:Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand) | 52.7 | cum | 7,225 ₹3,80,786.4 | 7,613.65 ₹4,01,269.81 | 7,200 ₹3,79,468.8 | 7,425 ₹3,91,327.2 | 7,026 ₹3,70,298.3 Lowest |
| 1.01 | 4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | 47.46 | sqm | 333.41 ₹15,823.64 | 341.47 ₹16,206.17 | 450 ₹21,357 | 330 ₹15,661.8 | 324 ₹15,377.04 Lowest |
| 1.01 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | 41.47 | cum | 9,056.08 ₹3,75,573.75 | 9,142.08 ₹3,79,140.34 | 11,000.7 ₹4,56,221.03 | 9,390 ₹3,89,422.08 | 8,834 ₹3,66,363.65 Lowest |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 3,317.76 | kilogram | 97.06 ₹3,22,021.79 | 80.27 ₹2,66,316.6 | 63 ₹2,09,018.88 Lowest | 98 ₹3,25,140.48 | 94 ₹3,11,869.44 |
Tender Value
₹25.4 L
EMD Value
₹50,000
Closing Date
20 Aug 2025, 6:00 pmClosed
Assistant Engineer Koyilandy Muncipality
Assistant Engineer Koyilandy Muncipality
Pond Renovation Work
2025_LSGD_785006_1
LSGD/CELSGD/42217/2025-2026 /Amruth
Open Tender
Civil Works - Others
Item Rate
240 days
Koyilandy Muncipality
Please refer Tender documents.
9 documents required · 9 mandatory
₹2,760
Yes
₹50,000
Yes
27 Oct 2025
12 Aug 2025
22 Aug 2025
12 Aug 2025
20 Aug 2025
12 Aug 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1289935.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .