Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
Refer Docs
Closing Date
10 Mar 2026, 11:00 amClosed
M BASKAR
VSC, BHEL, TRICHY
Soot blower Lance assembly fabrication
2026_BHEL_58924_1
ENVSB4898
Limited
Job Works
90 days
Ward 35, BHEL, Trichy
Please refer Tender documents.
1 document required · 1 mandatory
₹0
Exempted
10 Mar 2026
3 Mar 2026
10 Mar 2026
3 Mar 2026
10 Mar 2026
3 Mar 2026
Select, Excess (+), Less (-)
Tender Inviting Authority: M BASKAR
Name of Work: Sootblower Lance Assembly Fabrication
Contract No: ENVSB4898
Name of the Bidder/ Bidding Firm / Company : Vendor Code:
Sl. No. Material Description Material Code Quantity Units Estimated Rate in Rs. P Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency Rate In Figure (INR- Indian Rupee) / Unit GST (If applicable in Percentage) GST Amount in Rs. P SCOPE HSN / SAC Code
10 LANCE ASSEMBLY 842000191526 7 Nos Excess(+) Full Conversion INR OA:3107610-7NOS MACHINING, FITUP AND WELDING AS PER DRAWING AND BHEL APPROVED VENDOR WPS. GRINDING, LPI AND RT AS PER SQP:VS:06/* FILLET AND BUTT WELD LPI TO BE SEEN NOTE: 1. EXCESS PENETRATION DURING WELDING SHOULD BE REMOVED. 2. INSIDE DIMENSION OF LANCE ASSEMBLY SHOULD BE CHECKED WITH THE SUITABLE GAUGE OR MANDREL. 3. STRAIGHTNESS OF THE LANCE TUBE IS NOT IN VENDOR SCOPE AND WILL BE DONE AT BHEL SHOP. 4. MATERIAL SHOULD COME WITH RUST PREVENTIVE OIL.
20 LANCE EXTENSION ASSEMBLY(CS) 842002113600 2 Nos Excess(+) Full Conversion INR OA:3107610-2nos MACHINING, FITUP AND WELDING AS PER DRAWING AND BHEL APPROVED VENDOR WPS. GRINDING, LPI AND RT AS PER SQP:VS:06/* FILLET AND BUTT WELD LPI TO BE SEEN NOTE: 1. EXCESS PENETRATION DURING WELDING SHOULD BE REMOVED. 2. INSIDE DIMENSION OF LANCE ASSEMBLY SHOULD BE CHECKED WITH THE SUITABLE GAUGE OR MANDREL. 3. STRAIGHTNESS OF THE LANCE TUBE IS NOT IN VENDOR SCOPE AND WILL BE DONE AT BHEL SHOP. 4. MATERIAL SHOULD COME WITH RUST PREVENTIVE OIL.
30 LANCE ASSEMBLY 842040190106 2 Nos Excess(+) Full Conversion INR MACHINING, FITUP AND WELDING AS PER DRAWING AND BHEL APPROVED VENDOR WPS.GRIND AND LPI. NOTE: 1. EXCESS PENETRATION DURING WELDING SHOULD BE REMOVED. 2. STRAIGHTNESS OF THE LANCE TUBE IS NOT IN VENDOR SCOPE AND WILL BE DONE AT BHEL SHOP. 3. MATERIAL SHOULD COME WITH RUST PREVENTIVE OIL.
40 LANCE ASSEMBLY-30191200 842083190534 1 Nos Excess(+) Full Conversion INR MACHINING, FITUP AND WELDING AS PER DRAWING AND BHEL APPROVED VENDOR WPS. GRINDING, LPI AND RT AS PER SQP:VS:06/* FOR SUPER CRITICAL BOILER INCONEL WELDING FOR BUTT JOINTS. NOTE: 1. EXCESS PENETRATION DURING WELDING SHOULD BE REMOVED. 2. INSIDE DIMENSION OF LANCE ASSEMBLY SHOULD BE CHECKED WITH THE SUITABLE GAUGE OR MANDREL. 3. STRAIGHTNESS OF THE LANCE TUBE IS NOT IN VENDOR SCOPE AND WILL BE DONE AT BHEL SHOP. 4. MATERIAL SHOULD COME WITH RUST PREVENTIVE OIL.
50 LANCE ASSEMBLY-30191200 842083191641 2 Nos Excess(+) Full Conversion INR MACHINING, FITUP AND WELDING AS PER DRAWING AND BHEL APPROVED VENDOR WPS.GRIND AND LPI. NOTE: 1. EXCESS PENETRATION DURING WELDING SHOULD BE REMOVED. 2. STRAIGHTNESS OF THE LANCE TUBE IS NOT IN VENDOR SCOPE AND WILL BE DONE AT BHEL SHOP. 3. MATERIAL SHOULD COME WITH RUST PREVENTIVE OIL.
Total in Figures Paintint details will be confirmed by OP&C
Quoted Rate in Figures Select %
Please Enable Macros to View BoQ information
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.71 MB
Scope.pdf
Tender Documents • 0.48 MB
BOQ_63717.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid