Loading…
Loading…
Tender Value
₹7.0 Cr
EMD Value
₹7.0 L
Closing Date
16 Oct 2026, 5:30 pm
MS PRIYANKA SHARMA(DFLT)
CHIEF ENGINEER ( TENDER CELL)
NIT 1207 Renewal / Strengthening Road Under MMGSVY PKG No MMGSY-BSP-M-09, District-Bilaspur
200829
NIT 1207 Renewal / Strengthening Road Under MMGSVY PKG No MMGSY-BSP-M-09, District-Bilaspur
RESTRICTED TENDER
WORKS
PERCENTAGE
8 days
CHIEF ENGINEER ( TENDER CELL)
Required Past Technical Experience: As per Tender document
Required Financial Turnover (in INR): AS PER NIT
Required Bid Capacity (in INR): AS PER NIT
15 documents required · 15 mandatory
Panchayat and Rural Development (PARD)
WORKS
MS PRIYANKA SHARMA(DFLT)
RESTRICTED TENDER
PERCENTAGE
A B
CHIEF ENGINEER ( TENDER CELL)
TENDER CELL
CGRRDA RAIPUR
120
08
No
1
200829
16 Oct, 2026 5:30:00 PM IST
22 Oct, 2026 5:40:46 PM IST
1 Oct, 2026 6:30:00 PM IST
NIT 1207 Renewal / Strengthening Road Under MMGSVY PKG No MMGSY-BSP-M-09, District-Bilaspur
NIT 1207 Renewal / Strengthening Road Under MMGSVY PKG No MMGSY-BSP-M-09, District-Bilaspur
698000.00 INR
RTGS/CHALLAN (ONLINE) Internet Banking (ONLINE)
69772000.00
2
22 Oct, 2026 5:30:54 PM IST
69772000
AS PER NIT
AS PER NIT
As per Tender document
5000.00 INR
14d 22h 27m
15 documents required · 15 mandatory
₹5,000
₹7.0 L
1 Oct 2026
1 Oct 2026
22 Oct 2026
1 Oct 2026
22 Oct 2026
(A)-Construction Cost.
Contingency 1%
(B)-Maintanance Cost.
Total Cost
DPR Preperation Cost
Cost per Km
Say Rs. 123.96 Lakh
Executive Engineer
MMGSVY Bilaspur (C.G.)
ROAD FEATURES
1. Previous Detail (History)
B.T. Length: -
C.C. Length: -
2. Present Condition of Road
3. Provision made in Estimate
(i) Good Condition- where surface is Average such length is 650 m and chainage mentioned in Estimate. Only seal coat required on surface and hard shoulder filling upto average depth of 75 mm required.
MUKHYA MANTRI GRAM SADAK YOJANA
ABSTARCT
Name of Road :-
Length of Road in KM:-
Total Road Length
Sub Total
Total Cost of road without Maintenance Rs.
Contingency 1%
Total Cost of road with Maintenance Rs.
Total Cost of road With (18% GST+ 1% Contingency) Rs.
Cost of road without DPR Preperation and Maintenance Rs. Per km
Cost of road with Maintenance Rs. Per km
Cost of road Rs. Per km
Say Rs. 123.96 Lakh
Executive Engineer
Sub Engineer
PIU CGRRDA, Bilaspur (C.G.)
TECHNICAL REPORT
BILL OF QUANTITY
Package No-
District -
Block -
Length - 5.38 KM Block Kota
Quantity
Total Construction Cost
Total
Total
Total Maintainance cost (BT+CC)
Total Construction & Maintainance cost
GST 18%(Const+Maint)
Grand Total with (Cont+Main+GST)
Rs. In lacs
Excutive Engineer
PIU CGRRDA, Bilaspur (C.G.)
BILL OF QUANTITY
Package NO -
District-
Block-
Length-4.54 KM Block -KOTA
Quantity
Total Construction Cost
Maintainanc Total
Total Maintainance cost (BT + CC)
Construction & Maintainance Cost
Total Cost of Construction & Maintainance With GST
Say in Rs.
BILL OF QUANTITY
Name of Road-
Length of Road:-
Total Cost =
Total Maintainance cost (BT+CC)
Say Rs. 122.97 Lakh
Sub engineer Assistant Engineer
PIU CGRRDA, Bilaspur (C.G.) PIU CGRRDA, Bilaspur (C.G.)
Part B - DETAILS COST RENEWAL ESTIMATE
Name of Road-
Length of Road in KM:-
Flexible Length in KM:-
Rigid Length:-
Distt. :-
Estimate section B - Upgradation and Maintenance of Normal Repair
Add Profile Correction
Total
Add extra for widening and Curve portion 5%
Sides of wmm+Bm+pmc+seal
Add extra for widening and Curve portion 5%
Add extra for widening and Curve portion 5%
Add extra for widening and Curve portion 5%
Add extra for widening and Curve portion 5%
Add extra for widening and Curve portion 5%
CC Shoulder RD 0-300 and 1900-2200
Total
(A) For 7.50 M Formation Width
Total
At bell mouth
on curve portion (7)
on school (4)
near culvert
Total
Total Cost =
Maintenance Cost
Say Rs. 123.96 Lakh
FC Cost
Sub engineer Assistant Engineer
PIU CGRRDA, Bilaspur (C.G.) PIU CGRRDA, Bilaspur (C.G.)
MUKHYA MANTRI GRAM SADAK YOJANA
Part-C Maintenance of Road (For 5 Years)
ABSTRACT
Name of Road-
Total Length
Total Rs.
Total Rs.
TOTAL MAINTANANCE COST (BT+CC) =
Sub Engineer
PIU BILASPUR
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
5423138219147850775_153496_1278507194557121433_80616_Guidelines to Bidders.pdf
NIT • 0.13 MB
6677491536712418103_200829_NIT 1207 Tender Document MMGSVY Renewal.pdf
NIT • 1.48 MB
7220004713345599380_200829_30-MM-BSP- 09 Final.xls
BOQ • 1.20 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .