| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹7.7 CrAccepted-AOC KILLA NO 19 19 1 1 OPP HSIIDC RAI JATHERI SONIPAT HARYANA SONIPAT HARYANA 131029 | SONIPAT | HARYANA | 131029 | ₹7.7 Cr | 1 | Accepted-AOC Work Allotted |
| 2 | 2₹8.8 Cr+₹1.1 Cr (14.3%)Rejected-AOC 39 ANAND INDUTRIAL ESTATE MOHAN NAGAR GHAZIABAD UTTAR PRADESH 201007 | GHAZIABAD | UTTAR PRADESH | 201007 | ₹8.8 Cr+₹1.1 Cr (14.3%) | 2 | Rejected-AOC Work Not Allotted |
| 3 | 3₹9.2 Cr+₹1.5 Cr (19.9%)Rejected-AOC 81 ARYA NAGAR ASSANDH ROAD PANIPAT HARYANA 132103 | PANIPAT | HARYANA | 132103 | ₹9.2 Cr+₹1.5 Cr (19.9%) | 3 | Rejected-AOC Work Not Allotted |
| 4 | Rejected-Technical 14 CHAHAR CONSTRUCTION CO ADARSH NAGAR NEAR ROHILLA COMMUNICAION 124103 | JHAJJAR | HARYANA | 124103 | - | - | Rejected-Technical as per technical evaluation |
| 5 | Rejected-Technical | - | - | Rejected-Technical as per technical evaluation |
| Sl No | Description | Qty | Unit | Sombansi Enviro Engg Pvt Ltd. L2 | PURE WATERTECH Pvt. Ltd. L1 | Anil Kumar Contractor L3 |
|---|---|---|---|---|---|---|
| 1.00 | Design, Construction, Supply, Erection, Testing, Commissioning of 4.5 MLD average flow with peak factor Main Pumping Station (MPS) and 4.5 MLD capacity Sewage Treatment Plant based on Sequential Batch Reactor (SBR) Technology along with Tertiary Treatment complete in all respect including Landscaping, all other contingent i.e. Civil, Electrical, Mechanical, Piping and Instrumentation work with PLC and SCADA arrangement for STP integrated with MPS at STP including Tertiary treatment, Entire infrastructure including construction of Staff quarter, Administrative building cum Laboratory with equipment and tools, Boundary wall and plants as per detail given in the bid document comprises of 900 mm dia incoming sewer lines to be connected with last Manhole prior to MPS, Main Receiving Chamber Bv Pass Channel. Inlet Chamber, Coarse Screen Chamber, Distribution Chamber, wet well sump suitable for 4.5 MLD average flow with peak factor including Providing and installing non clog sewage submersible pump sets each equipped with VFD and suitable LT panel boards, all safety devices. automatic capacitor bank and suitable size submersible cable from LT panel to pumps, K9 DI pipe of suitable dia at MPS including welding and screwing of flanges, ISl marked D.1. fittings, Knife gate valves non-return valves as per requirements even for bye-pass arrangements along with necessary Knife gate valves etc., Piping Gallery, Stilling Chamber, Fine Screen Chamber, Grit Chamber, SBR Basin, Sludge Thickener, Necessary piping work with the required DI D/F Resilient seated Sluice Valve and sluice Valve Chambers, Belt Filter Press including Belt Filter Press feed pump, Chlorine Contact Tank, Chlorinator room,Pressure Sand Filter and Activated Carbon filters, Providing and laying of RCC pipe cater 4.5 MLD flow with peak factor as per CPHEEO manual from plant outlet to disposal point (Existing Nalla, named as Drain no. 6) for Disposal of Treated effluent of 4.5 MLD, complete in all respects as per complete scope of work mentioned in Annexure-l including 6 Years Defect Liability-cum-Maintenance Period (after 3 Months trial run) at Devru, Sonipat town.
(a) Entire Civil works, mechanical, electric and instrumentation works as per DNIT (As per detail attached at annexure- A and inclusive of O and M).
Detail of components are attached as annexure A1
Unit: 01 Job Brake up of cost for payment plan:-
Capital work 80%
DLP-cum-maintenance period 20% Scheduled of payment for DLP-cum-maintenance period is attached with DNIT
O and M includes all the scope of work included in the DNIT Payment scheduled is attached as annexure A2
Main-Component: Civil works/ Process Unit
Main Pumping Station
Stilling Chamber
Fine Screen Chamber
Grit Chamber
SBR Basin
Chlorination Disinfection Tank
Belt filter feed sump
Polyelectrolyte Dosing Tank
Main-Component: Civil Works/ Building Works
Chlorination cum Chlorine Tonner House
MCC and SCADA Building
Centrifugal Building
Centrifugal Feed Pump House (Sludge Pump and Blower House)
SBR Air Blowe
Admin Building
HT Substation
DG Room
Thickened Sludge Storage Shed
Guard Room
Store room
Staff Quarters
Boundary Wall
Electrical Works
Electric Estimate STP
Main-Component: Mechanical Works
Main Pumping Station
Inlet Chamber and fine Screen Chamber at STP
Grit Chamber at STP
SBR Basin at STP
Chlorination Disinfection
Sludge Thickener
Belt Filter Press
Pressure Sand Filter
Main-Component: Instrumentation Works
Instrumentation Works
Main-Component: 6 years defect liabilitv-cum-maintenance period 6 years defect liability-cum-maintenance period. | 1 | Job | 8,05,39,310 ₹8,05,39,310 | 6,83,74,205 ₹6,83,74,205 Lowest | 8,16,00,000 ₹8,16,00,000 |
Tender Value
₹8.3 Cr
EMD Value
₹16.7 L
Closing Date
4 May 2026, 11:00 amClosed
MOHD ASHIQUE
Infra-II (Public Health)
Design, construction, supply, installation, testing and commissioning of 4.50 MLD Sewage Treatment Plant (STP) at Devru, Sonipat on SBR Technology along with tertiary treatment and other works contingent thereto including three months successful tria
2026_HRY_514846_1
202619ABFF0A 5A40 43A6 A772 ADC7915F1B5F2247005
Open Tender
Civil Works
Works
750 days
Sonepat
2 documents required · 2 mandatory
₹20,000
₹16.7 L
Yes
23 Jul 2026
13 Apr 2026
4 May 2026
13 Apr 2026
4 May 2026
13 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Design, Construction, Supply, Erection, Testing, Commissioning of 4.5 MLD average flow with peak factor Main Pumping Station (MPS) and 4.5 MLD capacity Sewage Treatment Plant based on Sequential Batch Reactor (SBR) Technology along with Tertiary Treatment complete in all respect including Landscaping, all other contingent i.e. Civil, Electrical, Mechanical, Piping and Instrumentation work with PLC and SCADA arrangement for STP integrated with MPS at STP including Tertiary treatment, Entire infrastructure including construction of Staff quarter, Administrative building cum Laboratory with equipment and tools, Boundary wall and plants as per detail given in the bid document comprises of 900 mm dia incoming sewer lines to be connected with last Manhole prior to MPS, Main Receiving Chamber Bv Pass Channel. Inlet Chamber, Coarse Screen Chamber, Distribution Chamber, wet well sump suitable for 4.5 MLD average flow with peak factor including Providing and installing non clog sewage submersible pump sets each equipped with VFD and suitable LT panel boards, all safety devices. automatic capacitor bank and suitable size submersible cable from LT panel to pumps, K9 DI pipe of suitable dia at MPS including welding and screwing of flanges, ISl marked D.1. fittings, Knife gate valves non-return valves as per requirements even for bye-pass arrangements along with necessary Knife gate valves etc., Piping Gallery, Stilling Chamber, Fine Screen Chamber, Grit Chamber, SBR Basin, Sludge Thickener, Necessary piping work with the required DI D/F Resilient seated Sluice Valve and sluice Valve Chambers, Belt Filter Press including Belt Filter Press feed pump, Chlorine Contact Tank, Chlorinator room,Pressure Sand Filter and Activated Carbon filters, Providing and laying of RCC pipe cater 4.5 MLD flow with peak factor as per CPHEEO manual from plant outlet to disposal point (Existing Nalla, named as Drain no. 6) for Disposal of Treated effluent of 4.5 MLD, complete in all respects as per complete scope of work mentioned in Annexure-l including 6 Years Defect Liability-cum-Maintenance Period (after 3 Months trial run) at Devru, Sonipat town.
(a) Entire Civil works, mechanical, electric and instrumentation works as per DNIT (As per detail attached at annexure- A and inclusive of O and M).
Detail of components are attached as annexure A1
Unit: 01 Job Brake up of cost for payment plan:-
Capital work 80%
DLP-cum-maintenance period 20% Scheduled of payment for DLP-cum-maintenance period is attached with DNIT
O and M includes all the scope of work included in the DNIT Payment scheduled is attached as annexure A2
Main-Component: Civil works/ Process Unit
Main Pumping Station
Stilling Chamber
Fine Screen Chamber
Grit Chamber
SBR Basin
Chlorination Disinfection Tank
Belt filter feed sump
Polyelectrolyte Dosing Tank
Main-Component: Civil Works/ Building Works
Chlorination cum Chlorine Tonner House
MCC and SCADA Building
Centrifugal Building
Centrifugal Feed Pump House (Sludge Pump and Blower House)
SBR Air Blowe
Admin Building
HT Substation
DG Room
Thickened Sludge Storage Shed
Guard Room
Store room
Staff Quarters
Boundary Wall
Electrical Works
Electric Estimate STP
Main-Component: Mechanical Works
Main Pumping Station
Inlet Chamber and fine Screen Chamber at STP
Grit Chamber at STP
SBR Basin at STP
Chlorination Disinfection
Sludge Thickener
Belt Filter Press
Pressure Sand Filter
Main-Component: Instrumentation Works
Instrumentation Works
Main-Component: 6 years defect liabilitv-cum-maintenance period 6 years defect liability-cum-maintenance period. | - | Job | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.88 MB
BOQ_593676.xls
BOQ • 0.30 MB
OT0157179.pdf
Other Document • 17.72 MB
QIAPNXZ157179.pdf
Additional Documents • 17.72 MB
REPLYQUERIES1STP4point5MLD.pdf
PDF • 0.82 MB
514846STPDEVRUBOQCorrigendum.pdf
PDF • 0.35 MB
Drawing450LD.pdf
PDF • 1.01 MB
ANNEXURESCOPOFWORKFORUPLOADING45MLDSTP.pdf
PDF • 7.65 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .