| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹12.1 LAccepted-Finance H NO 113 1 SHOP NO IX HAVELI CURTI PONDA GOA | PONDA | SOUTH GOA | GOA | ₹12.1 L | 1 | Accepted-Finance L1 Bidder |
| 2 | 2₹14.6 LRejected-Finance H NO 443 6 DEULWADA MARCELA GOA | NORTH GOA | GOA | 403508 | ₹14.6 L | 2 | Rejected-Finance L2 Bidder |
| 3 | 3₹14.8 LRejected-Finance | ₹14.8 L | 3 | Rejected-Finance L3 Bidder |
| Sl No | Description | Qty | Unit | Kiyansh Constructions L1 | Siddharaj Chintamani vaghurmekar L2 | Kafmar Environmental Services Private Limited L3 |
|---|---|---|---|---|---|---|
| 1.00 | Earth work in excavation in all type of strata comprising any of the materials such as soil, silt, sand, clay gravel, moorums of all varieties shingles. pebble all type of conglomerates, laterite rock, soft rock, disintegrated rock, fissured shattered, decomposed rock or weathered rock and all such other materials, as describe under appendix to those specifications either in full or in parts as the case may be adopting any approved method or methods as may be convenient or permitted inclusive of chiselling, wedging etc. excluding blasting in all conditions such as dry moist, saturated Submerged, foul conditions etc. including pumping or bailing out water, including setting out construction of shoring and bracing removal stumps and other deleterious matters, dressing of side and bottoms and back filling the excavated earths to the extent required and disposing the remaining excavated soil/rock as directed by Engineer in charge for all leads and in all lifts as specified and directed etc. complete. | 75.78 | Cu.m | 280 ₹21,218.4 | 300 ₹22,734 | 314 ₹23,794.92 |
| 2.00 | Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete. | 15.38 | Cu.m | 1,000 ₹15,380 | 2,310 ₹35,527.8 | 2,340 ₹35,989.2 |
| 3.00 | Providing & laying cement concrete 1:2:4 (1 cement: 2 coarse sand: 4 graded granitic or basaltic stone aggrt. 20 mm. nominal size) excluding cost of centering, shuttering and finishing in:
a) All works upto plinth level | 7.69 | Cu.m | 342 ₹2,629.98 | 7,100 ₹54,599 | 7,200 ₹55,368 |
| 4.10 | Providing and laying in position (1:11/2:3) Reinforced cement conrete excluding the cost of centering, shuttering, finishing and reinfrocement (1 cement: 1½ coarse sand:3 graded stone agg 20mm nominal size)
a) All works upto plinth level | 36.66 | Cu.m | 6,500 ₹2,38,290 | 7,500 ₹2,74,950 | 7,600 ₹2,78,616 |
| 4.20 | b)In walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and structs etc. upto floor five level | 21.56 | Cu.m | 6,900 ₹1,48,764 | 8,400 ₹1,81,104 | 8,450 ₹1,82,182 |
| 4.30 | c)In beams, suspended floors, roofs having slope upto 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases upto floor five level | 0.75 | Cu.m | 7,000 ₹5,250 | 8,470 ₹6,352.5 | 8,470 ₹6,352.5 |
| 5.00 | Providing TMT steel reinforcement bars of (SAIL, TATA. VIZAG, JSW Steel Ltd.) ) (Confirming to IS 1786 of 1986) for RCC work (conforming to I.S. 1786 of 1986) including bending, binding & placing in position in all the floors along with the factory made precast concrete cover blocks of specified sizes whose compressive strength is not less than that of surrounding concrete in the structural member. | 4,750 | kg | 100 ₹4,75,000 | 110 ₹5,22,500 | 111 ₹5,27,250 |
| 6.10 | Centering & shuttering including Strutting, Propping & removal of forms for :
i) Foundations, Footings, Bases for columns | 76.61 | Sq.m | 342 ₹26,200.62 | 440 ₹33,708.4 | 450 ₹34,474.5 |
| 6.20 | ii)Vertical surfaces such as retaing walls, return walls, Partitions, walls (any thickness) including attached Pilasters, Buttresses, Plinth and string courses, Fillets and the like | 188.88 | Sq.m | 402 ₹75,929.76 | 480 ₹90,662.4 | 484 ₹91,417.92 |
| 6.30 | xiii) Suspended floors, roofs landings, shelves & their supports | 5 | Sq.m | 644 ₹3,220 | 670 ₹3,350 | 672 ₹3,360 |
Tender Value
₹14.0 L
EMD Value
₹28,005
Closing Date
3 Jun 2026, 4:00 pmClosed
EE III
EE, WD III, WRD, Ponda
Reconstruciton of retaining wall to nallah adjacenet to H No 108 near Mahatma Gandhi Centenary School Rajinwada Gaunem Bandora in Ponda Taluka.
2026_WRD_29340_1
10/26-27/ACT/WDIII/WRD/92/s3
Open Tender
Miscellaneous Works
45 days
Ponda
Please refer Tender documents.
3 documents required · 3 mandatory
₹3,000
₹28,005
9 Jul 2026
21 May 2026
4 Jun 2026
21 May 2026
3 Jun 2026
21 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation in all type of strata comprising any of the materials such as soil, silt, sand, clay gravel, moorums of all varieties shingles. pebble all type of conglomerates, laterite rock, soft rock, disintegrated rock, fissured shattered, decomposed rock or weathered rock and all such other materials, as describe under appendix to those specifications either in full or in parts as the case may be adopting any approved method or methods as may be convenient or permitted inclusive of chiselling, wedging etc. excluding blasting in all conditions such as dry moist, saturated Submerged, foul conditions etc. including pumping or bailing out water, including setting out construction of shoring and bracing removal stumps and other deleterious matters, dressing of side and bottoms and back filling the excavated earths to the extent required and disposing the remaining excavated soil/rock as directed by Engineer in charge for all leads and in all lifts as specified and directed etc. complete. | 75.78 | Cu.m | - | - |
| 2 | Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete. | 15.38 | Cu.m | - | - |
| 3 | Providing & laying cement concrete 1:2:4 (1 cement: 2 coarse sand: 4 graded granitic or basaltic stone aggrt. 20 mm. nominal size) excluding cost of centering, shuttering and finishing in:
a) All works upto plinth level | 7.69 | Cu.m | - | - |
| 4.1 | Providing and laying in position (1:11/2:3) Reinforced cement conrete excluding the cost of centering, shuttering, finishing and reinfrocement (1 cement: 1½ coarse sand:3 graded stone agg 20mm nominal size)
a) All works upto plinth level | 36.66 | Cu.m | - | - |
| 4.2 | b)In walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and structs etc. upto floor five level | 21.56 | Cu.m | - | - |
| 4.3 | c)In beams, suspended floors, roofs having slope upto 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases upto floor five level | 0.75 | Cu.m | 1 | ₹0.75 |
| 5 | Providing TMT steel reinforcement bars of (SAIL, TATA. VIZAG, JSW Steel Ltd.) ) (Confirming to IS 1786 of 1986) for RCC work (conforming to I.S. 1786 of 1986) including bending, binding & placing in position in all the floors along with the factory made precast concrete cover blocks of specified sizes whose compressive strength is not less than that of surrounding concrete in the structural member. | 4,750 | kg | 2 | ₹9,500 |
| 6.1 | Centering & shuttering including Strutting, Propping & removal of forms for :
i) Foundations, Footings, Bases for columns | 76.61 | Sq.m | 3 | ₹229.83 |
| 6.2 | ii)Vertical surfaces such as retaing walls, return walls, Partitions, walls (any thickness) including attached Pilasters, Buttresses, Plinth and string courses, Fillets and the like | 188.88 | Sq.m | 4 | ₹755.52 |
| 6.3 | xiii) Suspended floors, roofs landings, shelves & their supports | 5 | Sq.m | 5 | ₹25 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.01 MB
Tendernotice_2.pdf
PDF • 0.77 MB
BOQ_29764.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid