Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.9 LAdmitted-Fee/PreQual/Technical/Finance | ₹2.9 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹3.2 LAdmitted-Fee/PreQual/Technical/Finance | ₹3.2 L | L2 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | M K ALIAS L1 | Sivadasan K L2 |
|---|---|---|---|---|---|
| 1.00Repair of tyre shoes, tyre Keepers of Granulator, Cooler and Dryer in NP plant, FACT-CD. | |||||
| 1.01 | Replacement of Tyre Keepers of Dryer, Product Cooler and Granulator at NP Plant.
The work involves collecting and transporting the required materials from CD stores to the site. Tyre keepers are to be cut and fabricated from 16 mm or 25 mm thick plates as per instructions. After lifting the shell of the Dryer, Product Cooler, or Granulator, adjust the position of the tyre as needed. Damaged tyre keepers at the feed or discharge end must be cut/ground, and removed from the existing tyre shoe. New tyre keepers should then be properly positioned onnthe tyre shoe and fully welded according to instructions. | 300 | NO | 60,000 ₹60,000 Lowest | 90,000 ₹90,000 |
| 1.02 | Repair of damaged welding of tyre shoes of Dryer, Product cooler and Granulator at NP Plant.
The work involves grinding and removing the damaged or cracked weld joints between the rotary shell and the tyre shoe. The tyre shoe and tyre keepers must remain in their original positions and should not be disturbed. The affected areas shall then be fully re-welded to the rotary shell as per instructions. | 300 | NO | 1,35,600 ₹1,35,600 | 1,20,000 ₹1,20,000 Lowest |
| 1.03 | Fixing of Tyre Shoes on Granulator,Product Cooler and Dryer at NP Plant.
The work involves transporting the tyre shoe from the stores to the site. The damaged tyre shoe shall be removed from the rotary shell by grinding and removing the existing welds. If necessary, the tyre shall be lifted to facilitate removal and insertion of the tyre shoe. The new tyre shoe shall be properly positioned and fully welded to the rotary shell on both sides of the tyre. Tyre keepers shall then be installed on both sides of the tyre shoe and fully welded as per instructions. | 50 | NO | 90,000 ₹90,000 Lowest | 1,10,000 ₹1,10,000 |
Tender Value
Refer Docs
EMD Value
₹5,000
Closing Date
28 Jul 2026, 2:00 pmClosed
NITHIN C S
SM (P and P)-CD
REPAIR OF TYRE SHOES AND TYRE KEEPERS OF GRANULATOR, COOLER AND DRYER IN NP PLANT, FACT CD
2026_FACT_917055_1
4096/2026-2027/E33832
Limited
Miscellaneous Works
Item Rate
365 days
AMBALAMEDU
This tender is issued on limited tender basis from the registered bidders of FACT (CD)
4 documents required · 4 mandatory
₹0
₹5,000
Yes
30 Jul 2026
13 Jul 2026
29 Jul 2026
13 Jul 2026
28 Jul 2026
13 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Repair of tyre shoes, tyre Keepers of Granulator, Cooler and Dryer in NP plant, FACT-CD. | |||||
| 1.01 | Replacement of Tyre Keepers of Dryer, Product Cooler and Granulator at NP Plant.
The work involves collecting and transporting the required materials from CD stores to the site. Tyre keepers are to be cut and fabricated from 16 mm or 25 mm thick plates as per instructions. After lifting the shell of the Dryer, Product Cooler, or Granulator, adjust the position of the tyre as needed. Damaged tyre keepers at the feed or discharge end must be cut/ground, and removed from the existing tyre shoe. New tyre keepers should then be properly positioned onnthe tyre shoe and fully welded according to instructions. | 300 | NO | - | - |
| 1.02 | Repair of damaged welding of tyre shoes of Dryer, Product cooler and Granulator at NP Plant.
The work involves grinding and removing the damaged or cracked weld joints between the rotary shell and the tyre shoe. The tyre shoe and tyre keepers must remain in their original positions and should not be disturbed. The affected areas shall then be fully re-welded to the rotary shell as per instructions. | 300 | NO | - | - |
| 1.03 | Fixing of Tyre Shoes on Granulator,Product Cooler and Dryer at NP Plant.
The work involves transporting the tyre shoe from the stores to the site. The damaged tyre shoe shall be removed from the rotary shell by grinding and removing the existing welds. If necessary, the tyre shall be lifted to facilitate removal and insertion of the tyre shoe. The new tyre shoe shall be properly positioned and fully welded to the rotary shell on both sides of the tyre. Tyre keepers shall then be installed on both sides of the tyre shoe and fully welded as per instructions. | 50 | NO | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.12 MB
BOQ_963731.xls
BOQ • 0.23 MB
Compliance.pdf
Tender Documents • 0.09 MB
SpecialConditions.pdf
Tender Documents • 0.18 MB
Tenderdocuments.pdf
Tender Documents • 1.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].