Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹27.5 LAccepted-AOC | L1 | Accepted-AOC Accepted | |
| 2 | Rejected-Technical | - | Rejected-Technical L2 |
Tender Value
₹25.3 L
EMD Value
₹50,000
Closing Date
3 Oct 2023, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
The Executive Engineer
The Executive Engineer PWD Roads Division kollam
GENERAL-General RM 2022-23 /Cluster 2/ One Year RC/Sasthamcotta/KLM-RM Zone 1 - One Year Running Contract for Various PWD Roads Under Roads Section Sasthamcotta in Kollam District - 3 road stretches for a length of 11.45 Km
2023_PWD_590179_4
18/ET/EE/2023-24
Open Tender
Civil Works - Roads
Item Rate
360 days
kollam
Please refer Tender documents.
10 documents required · 10 mandatory
₹2,760
Yes
₹50,000
Yes
30 Nov 2023
21 Sept 2023
5 Oct 2023
21 Sept 2023
3 Oct 2023
21 Sept 2023
Amount
Appendix B- Pre Monsoon work
10.3:Maintenance of Earth Shoulder (stripping excess soil) from the shoulder surface to achieve the approved level and compacting with plate compactor
2.1.1:Cutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable material with all lifts and up to a lead of 1000 metres and earth filling in the depression/pit. Girth from 300 mm to 600 mm
2.3.2.A:Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness In area of light jungle - By Mechanical Means
OD55802/2023-2024:Hire charges for wood cutting equipment,pullys etc. for cutting dangerously standing trees
OD55803/2023-2024:Lifting and Replacing the RCC covering slabs of any thickness on top of drain in position including all labour charges and miscellaneous expenses etc complete.
OD55804/2023-2024:Engaging tipper for conveying cut down branches of trees , silt and debris collected from drains
OD55805/2023-2024:Engaging man mazdoor for removing /cleaning the rubbish and other aligned activities etc.
2.4.2.A:Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres <br> Cement Concrete Grade M-15 & M-20 - By Mechanical Means <br>
12.4:Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
12.8.A.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. <br> PCC Grade M15 <br>
OD55806/2023-2024:Engaging mazdoor for lowering side berms, clearing side berms, clearing side drains, removing silt from culverts, cutting earthen drains, diverting blocked water, ,removing the branches of trees leaned towards the road threatening pedestrians and traffic and removal of fallen trees or branches on the road clearing traffic blockage , stack the wood at suitable place and various works as directed by engineer in charge etc.
12.8.1.C.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications <br> RCC Grade M20 - Using Concrete Mixer <br>
12.40:Supply, Fitting and Placing un- coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications
55.25:Lifting, conveying and fixing the newly casted RCC covering slabs of any thickness on top of drain in position including all labour charges and miscellaneous expenses etc complete
3.13.1.B:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work.<br> Ordinary soil - Mechanical Means - (Depth upto 3 m) <br>
12.8.B:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications <br> PCC Grade M20 (Without formwork) <br>
Appendix C- Proactive /Preventive maintenance
10.5.1a:Filling Pot-holes and Patch Repairs with Bituminous concrete, 40mm. Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504, compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 - For grading I Material
8.13:Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads on Bituminous Surface @ 250 gms per sqm area, the thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35. The finished surface to be level, uniform, and free from streaks and holes.
8.35:Providing and fixing reflective road studs (Raised Pavement Marker) of ' category A' made out of ASA/HIPS/ABS moulded body with shanks and conforming to ASTM D 4280, strong enough to support a load of more than 13.635 T when tested in accordance with ASTM D 4280, reflective panel confirming to ASTM D 788, and reflectivity conforming to clause 804.4. including installation, drilling, fixing with adhesive etc. with 2 years warranty for the road stud as well as for in field performance as per clause 804.7.3 Road Markers/Road Stud with Lense Reflector :-
Appendix D-Routine Inspection
OD55807/2023-2024:Engaging labour with passenger car not less than 1000 cc for conducting and reporting Routine Inspection upto 20 km per day for the entire length of the project Road frequency of 7 days throughout the agreement period of the Running Contract as directed by the departmental officers.
SALIM MOHAMMED KUNJU
Bidder Name
SALIM MOHAMMED KUNJU
J HARIKUMAR
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_902405.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .