| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.5 CrAccepted-AOC PUNJAB INDIA | FATEHGARH SAHIB | PUNJAB | 140402 | ₹2.5 Cr | L1 | Accepted-AOC accepted |
| 2 | L2₹2.8 Cr+₹30.4 L (12.0%)Rejected-Finance | ₹2.8 Cr+₹30.4 L (12.0%) | L2 | Rejected-Finance due to higher rate |
| Sl No | Description | Qty | Unit | THE G.D. CONSTRUCTIONS L2 | JATTANA CONSTRUCTION CO L1 |
|---|---|---|---|---|---|
| 1.00 | Ordinary jungle clearance of both banks of Distributries, minors and drains with discharge 0 to 1.50 cumecs including boundary road | 1 | Km | 1 ₹3,970.97 Lowest | 1.3 ₹5,162.26 |
| 2.00 | Excavation in soil (any type) using hydraulic excavator CK 90 with hydraulic excavator of 0.90 cum bucket capacity including cutting and loading in trolley, trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections including all lifts and combined lead upto 30 m | 1 | Cum | 848 ₹7,318.24 Lowest | 848 ₹7,318.24 Lowest |
| 3.00 | Preparing,watering and ramming surface of laying for Laying Concrete for irrigation channels Horizontal. | 1 | Sqm | 28 ₹1,49,654.68 | 25 ₹1,33,620.25 Lowest |
| 4.00 | Reinforced cement concrete M-20 mechanically batch mixed using batch type concrete mixer as per IS:1791 and vibrated by needle vibrator but excluding steel reinforcement centering and shuttering in foundation and plinth. | 1 | Cum | 35 ₹3,08,959.7 Lowest | 35.82 ₹3,16,198.18 |
| 5.00 | C. Conc. 1:3:6 (M-10) with stone ballast using concrete mixer volume metric type | 1 | Cum | 718 ₹10,27,594.42 | 300 ₹4,29,357 Lowest |
| 6.00 | Cold twisted deformed(Ribbed/TOR Steel) Bars (Fe 500 grade as per IS 1786:2008), For RCC works i/c bending binding and placing in position complete in all respects | 1 | Qtl | 221 ₹34,92,127.08 | 190 ₹30,02,281.2 Lowest |
| 7.00 | Filling Contraction/Construction Joint with sealing compound complete in all respect | 1 | Metre | 4 ₹16,344.88 Lowest | 4.56 ₹18,633.16 |
| 8.00 | providing and fixing PVC water stop seal 150 x 10 mm. | 1 | Metre | 7,310 ₹1,14,255.3 | 5,800 ₹90,654 Lowest |
| 9.00 | Shuttering for faces of concrete foundations and foundation beam & plinth beam (vertical or battering) | 1 | Sqm | 1,869 ₹8,055.39 Lowest | 1,869 ₹8,055.39 Lowest |
| 10.00 | Dismantling brick work, tile masonry or tile lining in cement. | 1 | Cum | 4,424 ₹32,781.84 Lowest | 4,588 ₹33,997.08 |
Tender Value
₹2.6 Cr
EMD Value
₹5.2 L
Closing Date
27 Jan 2026, 10:00 amClosed
Executive Engineer
Executive Engineer Bathinda Canal And Ground Water Division Bathinda
Estimate for Relining of Rectangular Section of Khai Minor From RD 0-14156 by R.C.C
2026_WR_157215_1
49/22A/2025-26
Open Tender
Civil Works - Canal
Item Rate
Raikot
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹5.2 L
bathinda
6 Feb 2026
5 Jan 2026
27 Jan 2026
5 Jan 2026
27 Jan 2026
5 Jan 2026
13 Jan 2026
Ordinary jungle clearance of both banks of Distributries, minors and drains with discharge 0 to 1.50 cumecs including boundary road
Excavation in soil (any type) using hydraulic excavator CK 90 with hydraulic excavator of 0.90 cum bucket capacity including cutting and loading in trolley, trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections including all lifts and combined lead upto 30 m
Preparing,watering and ramming surface of laying for Laying Concrete for irrigation channels Horizontal.
Reinforced cement concrete M-20 mechanically batch mixed using batch type concrete mixer as per IS:1791 and vibrated by needle vibrator but excluding steel reinforcement centering and shuttering in foundation and plinth.
C. Conc. 1:3:6 (M-10) with stone ballast using concrete mixer volume metric type
Cold twisted deformed(Ribbed/TOR Steel) Bars (Fe 500 grade as per IS 1786:2008), For RCC works i/c bending binding and placing in position complete in all respects
Filling Contraction/Construction Joint with sealing compound complete in all respect
providing and fixing PVC water stop seal 150 x 10 mm.
Shuttering for faces of concrete foundations and foundation beam & plinth beam (vertical or battering)
Dismantling brick work, tile masonry or tile lining in cement.
Dressing of earthwork.New work or Remodeling work
Re-handling of Earthwork recently Executed.
Earth work involved in dismantling open flume A.P.M. or O.S.M. type outlets with 'H' more than 0.50 m but upto 0.90 m (including excavation, refilling, consolidation and dressing) .
Dismantling O.F., A.P.M. or O.S.M. type outlets consisting of total dismantling with 'H' more than 0.50 m but upto 0.90 m.
Extra labour for dressing bricks on O.F. and A.P.M. type outlets with 'H' more than 0.50 m but upto 0.90 m.
First class burnt brick work laid in cement sand mortar 1:4 in foundation and plinth.
PCC 1:4:8 with Stone Ballast 40 mm gauge using concrete mixer volume metric type
C. Conc. 1:3:6 (M-10) with stone ballast using concrete mixer volume metric type
C. Conc. 1:2:4 with stone ballast using concrete mixer volume metric type
Painting distance marks with synthetic enamel paint two coat work for Distributaries
Dag belling single Kassi stroke minimum 7.5 cm depth.
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.94 MB
BOQ_318724.xls
BOQ • 0.28 MB
TB01.xls
Additional Documents • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .