Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.3 LAccepted-AOC | ₹12.3 L | L1 | Accepted-AOC L1 |
| 2 | L2₹12.4 LRejected-Finance | ₹12.4 L | L2 | Rejected-Finance L2 |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 4 | Not Admitted-Fee/PreQual/Technical MOHALLA MEWALAL TALAB PURAB TOLA BALRAMPUR U P | JHANSI | UTTAR PRADESH | 284001 | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 5 | Rejected-Technical | - | - | Rejected-Technical FILE ADD |
| Sl No | Description | Qty | Unit | M/S SHREE ANSH CONSTRUCTION L2 | SHRI KRISHNA SHUKLA L1 |
|---|---|---|---|---|---|
| 1.00 | Earth work in making road diversion and approach ramp; including all lead & lift, all cost of labour, T & P with manual compaction and dressing etc. required for proper completion of work | 220.38 | Cum. | 144 ₹31,734 | 140 ₹30,852.50 |
| 2.00 | Dry brick on edge soling with first Class brick and prepration of sub grade and joints filled with local sand or sandy soil, including all cost of material, labour, T & P etc.complete work. | 131.25 | Sqm | 567 ₹74,418.75 | 566 ₹74,287.50 |
| 3.00 | Supply & fixing caution sign board ISA40x40x05mm size 1.20x2.10m. and 1.50mm thick M.S. plate, painting caution letter, including cost of all material, labour, T & P etc. complete work. | 2 | No. | 7,757 ₹15,514 | 7,750 ₹15,500 |
| 4.00 | Earth work in excavation foundation of masonry work in all type of soil including all lead and lift with disposal of earth as per direction of Engineer in charge. | 185.27 | Cum. | 90 ₹16,674.30 | 89 ₹16,489.03 |
| 5.00 | Laying P.C.C. M-10 (1:3:6) mix. in foundation with Kabrai crused stone grit 4.75 to 40 mm size & coarse sand of F.M. not less than 2.0, including all cost of material, labour, T & P etc. required for proper completion of work. | 6.9 | Cum. | 12,121.26 ₹83,673.06 | 12,100 ₹83,526.30 |
| 6.00 | Centering and shuttering for R.C.C.work; including all cost of material, labour, T & P etc. complete work. | 109.19 | Sqm | 1,295 ₹1.4 L | 1,280 ₹1.4 L |
| 7.00 | Cutting, bending, binding and placing of steel reinforcementin R.C.C. work; including all cost of steel, binding wire,labour, T & P etc. required for proper completion of work. | 3.53 | MT | 81,675 ₹2.9 L | 81,500 ₹2.9 L |
| 8.00 | Laying R.C.C. M-20 (1:1.5:3) mix with Kabrai crushed stone grit graded 4.75 to 20mm size with coarse sand of F.M. not less then 2.0; including all cost of material, labour T & P etc. required for proper completion of work. | 33.6 | Cum. | 12,800 ₹4.3 L | 12,700 ₹4.3 L |
| 9.00 | Earth work in back filling of foundation up to ground level in all type of soil, including all lead & lift, all cost of material, labour, T & P etc. complete with manual compaction. | 84.63 | Cum | 75 ₹6,347.55 | 74 ₹6,262.92 |
| 10.00 | Dismantling of old & damaged brick on edge soling from road diversion as per direction of engineer-in-charge;including all cost of labours, T & P etc. for proper completion of work. | 131.25 | Sqm. | 114 ₹14,962.50 | 110 ₹14,437.50 |
Tender Value
₹12.4 L
EMD Value
₹25,000
Closing Date
27 Jan 2026, 5:00 pmClosed
EE Saryu Nahar Khand-1 Balrampur
EE Saryu Nahar Khand-1 Balrampur
Construction of V.R.B. at Km 3.900 of Lalit Nagar Mr.
2026_UPIDC_1107737_11
03/EE/2025-26
Open Tender
Civil Works - Canal
180 days
Bahraich
Please refer Tender documents.
2 documents required · 2 mandatory
₹766
₹25,000
Yes
9 Mar 2026
21 Jan 2026
28 Jan 2026
21 Jan 2026
27 Jan 2026
21 Jan 2026
Earth work in making road diversion and approach ramp; including all lead & lift, all cost of labour, T & P with manual compaction and dressing etc. required for proper completion of work
Dry brick on edge soling with first Class brick and prepration of sub grade and joints filled with local sand or sandy soil, including all cost of material, labour, T & P etc.complete work.
Supply & fixing caution sign board ISA40x40x05mm size 1.20x2.10m. and 1.50mm thick M.S. plate, painting caution letter, including cost of all material, labour, T & P etc. complete work.
Earth work in excavation foundation of masonry work in all type of soil including all lead and lift with disposal of earth as per direction of Engineer in charge.
Laying P.C.C. M-10 (1:3:6) mix. in foundation with Kabrai crused stone grit 4.75 to 40 mm size & coarse sand of F.M. not less than 2.0, including all cost of material, labour, T & P etc. required for proper completion of work.
Centering and shuttering for R.C.C.work; including all cost of material, labour, T & P etc. complete work.
Cutting, bending, binding and placing of steel reinforcementin R.C.C. work; including all cost of steel, binding wire,labour, T & P etc. required for proper completion of work.
Laying R.C.C. M-20 (1:1.5:3) mix with Kabrai crushed stone grit graded 4.75 to 20mm size with coarse sand of F.M. not less then 2.0; including all cost of material, labour T & P etc. required for proper completion of work.
Earth work in back filling of foundation up to ground level in all type of soil, including all lead & lift, all cost of material, labour, T & P etc. complete with manual compaction.
Dismantling of old & damaged brick on edge soling from road diversion as per direction of engineer-in-charge;including all cost of labours, T & P etc. for proper completion of work.
Dumping of brick rora as per direction of engineer-in-charge;including all cost of labours, T & P etc. complete work but excluding cost of brick rora.
Relaying of dry brick on edge soling with preparation of sub grade, joints filled with local sand/earth excluding cost of bricks but, including all cost of local sand/earth labour, T & P etc. for proper completion of work.
E/W in restoration of bank making daula including all lead & lift with all cost of material, labour, T & P etc. required for completion of work
Maintinance of diversion road for traffic during work in progress; including all cost of labour, T & P etc. required for completion of work
Providing of drainge spouts for weep hole with 110 mm dia PVC pipe fixed at and required / angle of degree including all cost of material, labour, T & P etc. for completion of work
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.07 MB
BOQ_2044732.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid