Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹24.9 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹26.4 L+₹1.5 L (5.85%)Rejected-Finance | L2 | Rejected-Finance rejected | |
| 3 | L3₹26.8 L+₹1.9 L (7.49%)Rejected-Finance | L3 | Rejected-Finance Rejected |
| Sl No | Description | Qty | Unit | SHREE GANPATI STORES L3 | ASHA STORES L1 | KREATIVE SYSTEMS L2 |
|---|---|---|---|---|---|---|
| 1.00Provision of Steel Shed as per following details :- | ||||||
| 1.01 | (a) Base plate with MS Piller 4'' x 4''. (b) 10 Steel columns to be installed. (c) Colour coated sheet for roofing of thickness 0.5 mm. (d) 5 x Steel trusses made of rectangular tubes of size 80 x 40 mm to be placed on columns. (e) Blue colour coated sheet to be used for walls of thickness 0.5mm. (f) 10 x wall fans heavy duty. (g) 10 LED light (1000 watt) to be installed for sufficient lighting inside the shed. (h) 06 x High performance roof mounted Oscillating fans. (j) Painting of steel. (k) Size of Shed 54' x 30' & 25' Height. (l) Side wall Height 4 x feet & Thickness 1 x feet. (m) 06 x Sliding Window with Glass & Iron Railing (Size 4.5 feet x 6 Feet). (n) 02 x Hydraulic Glass Door (Size 6 feet x 4.5 feet) | 1 | Job | 14,80,000 ₹14,80,000 | 14,69,000 ₹14,69,000 Lowest | 14,73,000 ₹14,73,000 |
| 2.00Material and labour for Asphalt Base | ||||||
| 2.01 | (a) Laying WBM (Hard Stone) Soling course (6.0 inch). (b) Laying of Asphalt BM in 80/100 Grade Bitumen for 30 mm thickness in 19 mm stone aggregate. (c) Laying of Asphalt BM in 80/100 Grade Bitumen for 25 mm thickness in 6-8 mm stone aggregate. (d) Spray of weed control chemical | 880 | Sq Ft | 570 ₹5,01,600 | 510 ₹4,48,800 Lowest | 535 ₹4,70,800 |
| 3.00Weather Acrylic Surface (8-Layer) | ||||||
| 3.01 | (a) 1 x Layer of Filler / Resurface (b) 2 x Layer of Heavy Cushion (c) 3 x Layer of Fine Cushion (d) 2 x Layer of Colour (e) Line Marking (f) Area 880 Sqr feet | 880 | Sq Ft | 350 ₹3,08,000 | 276 ₹2,42,880 Lowest | 360 ₹3,16,800 |
| 4.00Provision of Urinal with Room with Brick work (9'' wall) 10' x 6' x 10') with Roof profile sheet | ||||||
| 4.01 | (a) 10' x 6' x 10' Height with partition. (b) 01 x Urinal Point each for Men & Women in separate cabin. (c) 01 x Wash basin in each cabin. (d) Sufficient lighting arrangements (e) Exhaust Fan in each cabin | 1 | No | 3,92,000 ₹3,92,000 | 3,34,000 ₹3,34,000 Lowest | 3,80,000 ₹3,80,000 |
Tender Value
₹25 L
EMD Value
₹75,000
Closing Date
10 Nov 2025, 10:00 amClosed
CO, 152 Inf Bn (TA) SIKH
152 Inf Bn (TA) SIKH, Camping Ground Complex, Ludhiana-141001
Construction of Multiutility Shed at Camping Ground Complex, Ludhiana
2025_ARMY_729053_1
152TA/LDH-01/2025-26
Limited
Civil Works
Item Rate
45 days
Camping Ground Complex
As per NIT and RFP
3 documents required · 3 mandatory
₹500
OIC QD FUND ACCOUNT, HQ 715 (I) AD BDE
₹75,000
Yes
Conference Hall, 152 INF BN (TA) SIKH, CG Complex
8 Feb 2026
25 Oct 2025
11 Nov 2025
25 Oct 2025
10 Nov 2025
25 Oct 2025
25 Oct 2025 - 8 Nov 2025
28 Oct 2025
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.40 MB
BOQ_816191.xls
BOQ • 0.39 MB
RFP.pdf
Tender Documents • 2.87 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .