Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.6 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹3.0 L+₹39,492.06 (15.4%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹3.2 L+₹67,104.11 (26.1%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | ||
| 4 | L4₹3.4 L+₹85,212.14 (33.2%)Admitted-Fee/PreQual/Technical/Finance | L4 | Admitted-Fee/PreQual/Technical/Finance | ||
| 5 | Not Admitted-Fee/PreQual/Technical/Finance | - | Not Admitted-Fee/PreQual/Technical/Finance Others-invalid affidavit |
Tender Value
₹3.6 L
EMD Value
₹7,200
Closing Date
10 Aug 2026, 6:00 pmClosed
EXECUTIVE ENGINEER REW BARAMULLA
REW BARAMULLA
C/O Fencing around Jamia masjid Bongam. (HalqaPariswani, Block Kunzer) under ADP (PRI) 2026-27
2026_RDPR_317116_23
140/Xen/Rew/Bla/2026-27 Dated 21/07/2026
Open Tender
Civil Works
Percentage
30 days
BARAMULLA
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
EXECUTIVE ENGINEER REW BARAMULLA
₹7,200
14 Aug 2026
30 Jul 2026
11 Aug 2026
30 Jul 2026
10 Aug 2026
30 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 9.37 | cum | - | - |
| 2 | Providing and laying of dry stone solling(plum) including hand rammingincl.carriage | 2.34 | cum | - | - |
| 3 | Centering and shuttering including strutting, propping etc. and removal of form for foundation in Footing up to plinth level | 51.3 | sqm | - | - |
| 4 | 12mm thick cement sand plaster 1:6mix. | 51.3 | sqm | - | - |
| 5 | Providing and fixing of build up sections of angle iron,flat iron including cutting, fixing in position and applying a priming coat of approved steel primer all complete. | 1,896.36 | kgs | - | - |
| 6 | Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade incl priming coat of zinc oxide. | 46.17 | sqm | 1 | ₹46.12 |
| 7 | Carriage of cement av.lead 5km | 2.34 | ton | - | - |
| 8 | carriage of bajri by MT upto an average 5km | 8.44 | cum | - | - |
| 9 | Carriage of sand by MT up to an avariage 30 kms | 4.83 | cum | - | - |
| 10 | Providing and fixing of CIB Sign Board and Photograph. | 1 | Job | - | - |
stage.html
html • 0.02 MB
finance_1048009.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.16 MB
BOQ_1048009.xls
BOQ • 0.26 MB
corigendum8agust.pdf
PDF • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .