| 1 | L1₹6.6 LAccepted-AOC SULTHAN BATHERY WAYANAD | SULTHAN BATHERY | WAYANAD | KERALA | L1 | Accepted-AOC L1 | |
| 2 | L2₹6.8 L+₹21,215.52 (3.22%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | L3₹7.0 L+₹42,028.94 (6.37%)Rejected-Finance CHEMBIL PADICHIRA PULPALLY WAYANAD KERALA | PULPALLY | WAYANAD | KERALA | L3 | Rejected-Finance L3 |
| Sl No | Description | Qty | Unit | SIMSON L2 | Shaji KC L1 | SANIL CR L3 |
|---|---|---|---|---|---|---|
| 1.02Construction of settler | ||||||
| 1.03 | Demolishing cement concrete manually / by mechanical means including disposal of
material within 50 metres lead as per direction of Engineer - in-Charge.Nominal
concrete 1:3:6 or richer mix (i/c equivalent design mix) | 5.7 | m3 | 2,000 ₹11,402 | 1,854.23 ₹10,570.97 Lowest | 2,057 ₹11,726.96 |
| 1.04 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means
over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan)
including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed
earth to be levelled and neatly dressed.All kinds of soil | 50.8 | m3 | 208 ₹10,566.4 | 194.05 ₹9,857.66 Lowest | 215 ₹10,922 |
| 1.05 | Providing and laying in position cement concrete of specified grade excluding the cost
of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse
sand : 6 graded stone aggregate 20 mm nominal size) | 1.96 | m3 | 7,190 ₹14,121.16 Lowest | 7,191.33 ₹14,123.77 | 7,413 ₹14,559.13 |
| 1.06 | Reinforced cement concrete work in walls (any thickness), including attached
pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers,
abutments, posts and struts etc. up tot floor five level excluding cost of centering,
shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded
stone aggregate 20 mm nominal size) | 11.65 | m3 | 10,691 ₹1,24,550.15 Lowest | 10,692.01 ₹1,24,561.91 | 11,022 ₹1,28,406.3 |
| 1.07 | Steel reinforcement for R.C.C work including straightening, cutting, bending, placing
in position and binding all complete upto plinth levelThermo - Mechanically Treated
bars of grade Fe-500D or more | 932 | kg | 95 ₹88,540 | 89.13 ₹83,066.29 Lowest | 98 ₹91,336 |
| 1.08 | Centering and shuttering including strutting, etc. and removal of form for:Walls (any
thickness) including attached pilasters, butteresses, plinth and string courses etc. | 101.64 | m2 | 700 ₹71,148 | 649.6 ₹66,025.56 Lowest | 721 ₹73,282.44 |
| 1.09 | Supply of PVC Pipe, 6kg/cm2, 200mm Dia. | 210 | m | 1,073 ₹2,25,330 | 1,041.17 ₹2,18,646.16 Lowest | 1,107 ₹2,32,470 |
| 1.10 | Laying uPVC pipes of class 2 to class 6 and specials, lowering to the trenches already
made, placing in position aligning the pipeline to the lines and levels and jointing the
pipes and specials with solvent cement and testing the pipeline with water to the
required test pressure (excluding cost of pipes and specials): 200 mm nominal outside
diameter pipes. | 210 | m | 278 ₹58,380 Lowest | 278.87 ₹58,561.71 | 287 ₹60,270 |
| 1.11 | Providing and fixing 100 mm sand cast Iron grating for gully trap. | 20 | no | 51 ₹1,020 Lowest | 51.22 ₹1,024.32 | 52 ₹1,040 |
Tender Value
₹7.0 L
EMD Value
₹17,567
Closing Date
25 Oct 2025, 6:00 pmClosed
Regional Project Director
RPMU Kannur
GREY WATER MANAGEMENT PROJECT (SBM DEPOSIT WORK) CONSTRUCTION OF SETTLER IN PERAMBRA FISH MARKET IN PERAMBRA GRAMAPANCHAYTH, KOZHIKODE, KERALA
2025_KRWSA_810328_1
28/KRWSA/KNR/SBM/PRM/24-25
Open Tender
Civil Works - Water Works
Item Rate
90 days
Perambra
As per NIT
2 documents required · 2 mandatory
₹1,405
₹17,567
RPMU Kannur
20 Nov 2025
16 Oct 2025
27 Oct 2025
16 Oct 2025
25 Oct 2025
16 Oct 2025
16 Oct 2025 - 25 Oct 2025
18 Oct 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1352375.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.04 MB
BOQ_1352375.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .