| 1 | L1₹20.2 LAccepted-AOC VISHNU PRABHA HOUSE KAVIL P O NADUVANNUR VIA KOYILANDY KOZHIKODE DISTRICT KERALA 673614 | KOZHIKODE | KERALA | 673614 | L1 | Accepted-AOC L1 bidder | |
| 2 | L2₹21.1 L+₹88,938.31 (4.41%)Rejected-AOC 22045 R 100 M S PANJIPILLAI GINDADA P O KERALA | IDUKKI | KERALA | 685501 | L2 | Rejected-AOC L2 bidder | |
| 3 | L3₹24.6 L+₹4.5 L (22.1%)Rejected-AOC | L3 | Rejected-AOC L3 bidder |
| Sl No | Description | Qty | Unit | JISHA U L3 | BAIJU L2 | SREENATH. M.C. L1 |
|---|---|---|---|---|---|---|
| 1.00Jungle clearing, debris removal and weathered rock cutting | ||||||
| 1.00 | 2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | 22,800 | sqm | 15.5 ₹3,53,400 | 13.84 ₹3,15,552 | 13.25 ₹3,02,100 Lowest |
| 1.00 | 2.33.3:Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyond 120 cm girth up to and including 240 cm girth | 4 | each | 9,940 ₹39,760 | 8,674.06 ₹34,696.24 | 8,307.8 ₹33,231.2 Lowest |
| 1.00 | 60.1.1:RING BUND Type-I-Putting up ring bund as per approved shape 2.5m bottom width, 1m top width using empty gunny/polythene bags filled with earth placed in 2 rows at 0.6m apart and filled in between with puddle clay to form bund for an average height 2.00m including labour dismantling the bund after completion of the work etc. complete. | 41 | metre | 1,630 ₹66,830 | 1,360.73 ₹55,789.93 | 1,303.34 ₹53,436.94 Lowest |
| 1.00 | 60.2.4:BAILING OUT WATER USING PUMP ABOVE 10HP AND UP TO 20HP - Bailing out water with engine and pump set above 10HP and up to 20HP, including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete | 288 | hour | 570 ₹1,64,160 | 487.78 ₹1,40,480.64 | 467.18 ₹1,34,547.84 Lowest |
| 1.00 | OD6415/2026-2027:Wedging and Chiselling and trimming to proper shape where blasting is prohibited in hard rock/RCC with all leads and lifts for levelling the bed of foundations including stacking materials for measurement and all labour, materials, incidental charges etc complete as per direction of departmental officers at site. | 350 | cum | 3,052 ₹10,68,200 | 2,555.93 ₹8,94,575.5 | 2,448.02 ₹8,56,807 Lowest |
| 1.01 | OD6416/2026-2027:Removing rubble dumped below stilling basin, clearing away and carefully stacking materials useful for reuse including disposal of debris within a distance of 1.50 km at yards specified by the Engineer in charge. | 210 | cum | 963 ₹2,02,230 | 823.24 ₹1,72,880.4 | 788.5 ₹1,65,585 Lowest |
| 1.01 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 1,190 | cum | 229 ₹2,72,510 | 196.18 ₹2,33,454.2 | 188 ₹2,23,720 Lowest |
| 1.01 | OD6417/2026-2027:Conveying excavated earth to suitable dumping yard within a distance of 1Km and including all loading unloading and other
incidental expenditure etc. complete as per the direction of departmental officers at site. | 1,540 | cum | 166 ₹2,55,640 | 145.22 ₹2,23,638.8 | 139.09 ₹2,14,198.6 Lowest |
| 1.01 | 56.12.a:Total station surveying and preparation of site plan - Plain and open area without hindrance to line of sight with 1 m contour intervals , with 5m x 5m interval. | 3.67 | Hectare | 9,509 ₹34,898.03 | 8,043.8 ₹29,520.75 | 7,704.18 ₹28,274.34 Lowest |
Tender Value
₹25.4 L
EMD Value
₹50,000
Closing Date
23 Jun 2026, 6:55 pmClosed
Executive Engineer KyIP Division Perambra
Executive Engineer KyIP Division Perambra
Jungle clearing debris removal and weathered rock cutting in the stilling basin portion for the geological mapping survey-
2026_Irrig_856148_1
IRR/PI/TR/1239/2026_5_2_1/1
Open Tender
Civil Works - Others
Item Rate
90 days
Peruvannamoozhi
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
Yes
₹50,000
Yes
15 Jul 2026
16 Jun 2026
26 Jun 2026
16 Jun 2026
23 Jun 2026
16 Jun 2026
16 Jun 2026 - 23 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Jungle clearing, debris removal and weathered rock cutting | |||||
| 1.001 | 2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | - | sqm | - | - |
| 1.002 | 2.33.3:Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyond 120 cm girth up to and including 240 cm girth | - | each | - | - |
| 1.003 | 60.1.1:RING BUND Type-I-Putting up ring bund as per approved shape 2.5m bottom width, 1m top width using empty gunny/polythene bags filled with earth placed in 2 rows at 0.6m apart and filled in between with puddle clay to form bund for an average height 2.00m including labour dismantling the bund after completion of the work etc. complete. | - | metre | - | - |
| 1.004 | 60.2.4:BAILING OUT WATER USING PUMP ABOVE 10HP AND UP TO 20HP - Bailing out water with engine and pump set above 10HP and up to 20HP, including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete | - | hour | - | - |
| 1.005 | OD6415/2026-2027:Wedging and Chiselling and trimming to proper shape where blasting is prohibited in hard rock/RCC with all leads and lifts for levelling the bed of foundations including stacking materials for measurement and all labour, materials, incidental charges etc complete as per direction of departmental officers at site. | - | cum | - | - |
| 1.006 | OD6416/2026-2027:Removing rubble dumped below stilling basin, clearing away and carefully stacking materials useful for reuse including disposal of debris within a distance of 1.50 km at yards specified by the Engineer in charge. | - | cum | - | - |
| 1.007 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | - | cum | - | - |
| 1.008 | OD6417/2026-2027:Conveying excavated earth to suitable dumping yard within a distance of 1Km and including all loading unloading and other
incidental expenditure etc. complete as per the direction of departmental officers at site. | - | cum | - | - |
| 1.009 | 56.12.a:Total station surveying and preparation of site plan - Plain and open area without hindrance to line of sight with 1 m contour intervals , with 5m x 5m interval. | 1 | Hectare | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.06 MB
SBD.pdf
Tender Documents • 1.64 MB
BOQ_1447091.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .