| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹61.8 CrAdmitted-Finance 1849 JUGRAJPUR SACHENDI KANPUR KANPUR NAGAR UTTAR PRADESH 208023 UDYAM UP 43 0012110 | KANPUR NAGAR | UTTAR PRADESH | 208023 | ₹61.8 Cr | L1 | Admitted-Finance |
| 2 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical No EMD or Fee received |
| Sl No | Description | Qty | Unit | M/s Balaji Construction Company L1 |
|---|---|---|---|---|
| 1.00DI K-7 Pipeline : Rising Main / Cluster / Distribution Pipelines Providing,lowering, Laying, aligning fixing in position and jointing in trenches Ductile Iron(DI) ISI marked K-7 grade S&S pipes as per IS 8329-2000 (ammended upto date) with internal cement mortar lining suitable for potable water with rubber ring (EPDM) joints as per IS 5382-1985 including all taxes (Central&local) transportation and freight charges inspection charges loading / unloading charges stacking of pipes including cost of labour and material, specials (Tee,Bend etc.) sectional testing, and commissioning of pipe lines, including earthwork, bedding, construction of anchors blocks, thrust blocks, cross walls, transverse blocks, pipe support structures; road /canal /NH /Oil & Gas pipeline crossing works; repairs of crossed roads/canals/NH, cross drainage crossing works; dismantling and reconstruction of all types of roads; installation of specials; clearing the site; disinfections etc. complete in all respect as per the specification & scope of work for following diameter. | ||||
| 2.0080 mm dia K-7 | ||||
| 3.00 | 60% on supply | 20,868 | Rmt | 1,021 ₹2.1 Cr |
| 4.00 | 20 % on laying | 20,868 | Rmt | 340.33 ₹71.0 L |
| 5.00 | 10% on Hydro testing | 20,868 | Rmt | 170.17 ₹35.5 L |
| 6.00 | 5% on pre comissioning | 20,868 | Rmt | 85.08 ₹17.8 L |
| 7.00 | 5% Trial Run | 20,868 | Rmt | 85.08 ₹17.8 L |
| 8.00100 mm dia K-7 | ||||
| 9.00 | 60% on supply | 8,053 | Rmt | 1,221 ₹98.3 L |
| 10.00 | 20 % on laying | 8,064 | Rmt | 407 ₹32.8 L |
Tender Value
₹41.3 Cr
EMD Value
₹82.7 L
Closing Date
12 Aug 2024, 6:00 pmClosed
Chief Engineer Project PHED Jodhpur
Office of The Chief Engineer Project PHED Jodhpur
Execution of Balance works related to Coverage of 38 villages of RWSS MANAKLAO-DAIJAR-BANAR Constituency Luni, Osian and Bhopalgarh District Jodhpur under JJM on Risk and Cost
2024_PHCJO_406930_1
NIB No 02/2024-25 of CE Project PHED Jodhpur
Open Tender
Civil Works - Water Works
330 days
Jodhpur
Please refer Tender documents.
4 documents required · 4 mandatory
₹20,000
23587 EE PHED Project Dn ist Jodhpur
₹82.7 L
Yes
Jodhpur
4 Sept 2024
19 Jul 2024
13 Aug 2024
19 Jul 2024
12 Aug 2024
2 Aug 2024
30 Jul 2024
Amount
DI K-7 Pipeline : Rising Main / Cluster / Distribution Pipelines Providing,lowering, Laying, aligning fixing in position and jointing in trenches Ductile Iron(DI) ISI marked K-7 grade S&S pipes as per IS 8329-2000 (ammended upto date) with internal cement mortar lining suitable for potable water with rubber ring (EPDM) joints as per IS 5382-1985 including all taxes (Central&local) transportation and freight charges inspection charges loading / unloading charges stacking of pipes including cost of labour and material, specials (Tee,Bend etc.) sectional testing, and commissioning of pipe lines, including earthwork, bedding, construction of anchors blocks, thrust blocks, cross walls, transverse blocks, pipe support structures; road /canal /NH /Oil & Gas pipeline crossing works; repairs of crossed roads/canals/NH, cross drainage crossing works; dismantling and reconstruction of all types of roads; installation of specials; clearing the site; disinfections etc. complete in all respect as per the specification & scope of work for following diameter.
80 mm dia K-7
60% on supply
20 % on laying
10% on Hydro testing
5% on pre comissioning
5% Trial Run
100 mm dia K-7
60% on supply
20 % on laying
10% on Hydro testing
5% on pre comissioning
5% Trial Run
150 mm dia K-7
60% on supply
20 % on laying
10% on Hydro testing
5% on pre comissioning
5% Trial Run
200 mm dia K-7
60% on supply
20 % on laying
10% on Hydro testing
5% on pre comissioning
5% Trial Run
250 mm dia K-7
60% on supply
20 % on laying
10% on Hydro testing
5% on pre comissioning
5% Trial Run
300 mm dia K-7
60% on supply
20 % on laying
10% on Hydro testing
5% on pre comissioning
5% Trial Run
350 mm dia K-7
60% on supply
20 % on laying
10% on Hydro testing
5% on pre comissioning
5% Trial Run
400 mm dia K-7
20 % on laying
10% on Hydro testing
5% on pre comissioning
5% Trial Run
450 mm dia PE -80 PN-6
60% on supply
20 % on laying
10% on Hydro testing
5% on pre comissioning
5% Trial Run
HDPE PN 6 PE 80 Pipeline : Cluster / Distribution Pipelines Providing,lowering,laying and jointing in trenches,standard lengths HDPE ISI marked pipes of following grade and nominal diameter as per Is: 4984 :1995 (amended upto date) with necessary jointing material like mechanical connecters,i.e. thread/ insert joint/ quick release coupler joint/ compression fitting joint or flanged joint and jointing pipes in proper position including all specials by butt fusion/ electro fusion welding method ,including all taxes (Central and local ), tranportation and frieght charges, inspection charges, dismantling and reconstruction of all types of roads; loading/inloading charges, stacking of pipes, including cost of labour and material, specials (Tee, bend etc.),satisfactory hydraulic testing,disinfection etc. complete as per technical specifications and direction of Enginer in-charge including earth work
75 mm dia PE -80 PN-6
60% on supply
20 % on laying
10% on Hydro testing
5% on pre comissioning
5% Trial Run
90 mm dia PE -80 PN-6
60% on supply
20 % on laying
10% on Hydro testing
5% on pre comissioning
5% Trial Run
110 mm dia PE -80 PN-6
60% on supply
20 % on laying
10% on Hydro testing
5% on pre comissioning
5% Trial Run
125 mm dia PE -80 PN-6
60% on supply
20 % on laying
10% on Hydro testing
5% on pre comissioning
5% Trial Run
140 mm dia PE -80 PN-6
60% on supply
20 % on laying
10% on Hydro testing
5% on pre comissioning
5% Trial Run
160 mm dia PE -80 PN-6
60% on supply
20 % on laying
10% on Hydro testing
5% on pre comissioning
5% Trial Run
180 mm dia PE -80 PN-6
60% on supply
20 % on laying
10% on Hydro testing
5% on pre comissioning
5% Trial Run
200 mm dia PE -80 PN-6
20 % on laying
10% on Hydro testing
5% on pre comissioning
5% Trial Run
225 mm dia PE -80 PN-6
60% on supply
20 % on laying
10% on Hydro testing
5% on pre comissioning
5% Trial Run
Railway Crossings : Railway crossing of the pipelines, complete job as per scope, specifications and approved drawing of Railways. Job will include all required fees, lease amount, labour & material, construction cost etc. complete job.
Highway Crossings : NH/SH/NHAI/MDR road crossing of the pipelines, complete job as per scope, specifications and approved drawing. Job will include all required fees, lease amount, labour & material, construction cost etc. complete job.
House Connections: Providing Household Tap Connection as per technical specification and approved drawing as per relevant IS code (amended up to date) from uPVC/DI/AC/MS/GI pipe line up to consumer meter/premises by using PVC/MS saddle piece (Complete job).This job includes digging out suitable size of pits and trench for laying service line in all kinds of soil (excluding road); depositing and refilling of pit & jhiri with watering & ramming /compacting in layers and disposal of surplus excavated soil as directed with in a lead of 100 meter ; providing & fixing of all fitting duly approved in accordance with specification for potable water including MS/PVC saddle piece, gunmetal ferrule 4.0 mm , GM Full-way Valve (IS:778 Mark) or wheel valve and specials, below ground level 20 mm nominal dia MDPE pipe PE 80 PN 16 as per ISO 4427 / 20 mm nominal dia PPR-C (Three layered) pipe PN16 SDR 7.4 (IS:15801:2008) (ISI mark) and above ground level using 20 mm dia PPR-C pipe with standard PPR fittings/ 15 mm dia GI pipe with fittings in the premises for fixing a tap / meter box (excluding) ,including accessories with flushing, cleaning, disinfecting and testing of pipe line complete required for making of service connection complete in all respect including labour charges . The service line should be laid at least 45 cm below ground level. Complete job including dismantling and reconstruction of all types of roads.
75 %after making functional household water connection and repairing of Roads
20 % after 7 days of water supply being available through the connection and making entry of consumer in IMIS website.
5% Trail Run
Supply & installation of Electromagnetic Flow meters including the cost of sluice valve, dismantling joints/expansion bellow, specials; pipes; pressure gauge; etc. complete, as per the scope of work and specifications, complete in all respect size: Location : rising mains at respective Pump House
Supply & installation of Bulk Flow meters with removable mechanism class "B" confirming to ISO:4064:2005/ IS: 2373 of approved make of following dia sized pipelines and specifications complete: Media : Water (Clear ), Temp. 50 deg., Pr. rating: PN16, Protection type: IP- 68, Body Material : IS-210 Gr. FG-200, Accuracy Class :Class B (±2 % @ Nominal flow rate), Magnetic Drive, Dry Dial, Epoxy powder coated, Pulse out put option, Anti-magnetic protection including all materials and making connection with existing pipeline required for Bulk Flow Meter including cutting the existing pipeline including the cost of sluice valve, dismantling joints/expansion bellow, specials; pipes; pressure gauge; etc. complete, as per the scope of work and specifications, complete in all respect size: Location : Near 20 ESRs and 37 VTCs. The work at VTCs will also include all type of piping work and minor civil repair work etc. to make good existing VTC structures.
Supply and installation of manually operated sectionlising & scour valve DI D/F Resilient seated (soft seated) Sluice Valves (Gate Valves) , and Stain less steel AISI 304 Expansion bellows of 10/16 bar rating with tie rods/dismantling joints as per direction EIC complete in all respect as per the scope of work and specification.For sizes
30% on Installation
5% on pre comissioning
5% on Trial run
30% on Installation
5% on pre comissioning
5% on Trial run
30% on Installation
5% on pre comissioning
5% on Trial run
30% on Installation
5% on pre comissioning
5% on Trial run
30% on Installation
5% on pre comissioning
5% on Trial run
30% on Installation
5% on pre comissioning
5% on Trial run
30% on Installation
5% on pre comissioning
5% on Trial run
Supply and installation of manually operated CI D/F Sluice Valves , as per IS 14846 10/16 bar rating with tie rods/dismantling joints as per direction EIC complete in all respect as per the scope of work and specification.For sizes
30% on Installation
5% on pre comissioning
5% on Trial run
30% on Installation
5% on pre comissioning
5% on Trial run
30% on Installation
5% on pre comissioning
5% on Trial run
30% on Installation
5% on pre comissioning
5% on Trial run
30% on Installation
5% on pre comissioning
5% on Trial run
30% on Installation
5% on pre comissioning
5% on Trial run
30% on Installation
5% on pre comissioning
5% on Trial run
30% on Installation
5% on pre comissioning
5% on Trial run
30% on Installation
5% on pre comissioning
5% on Trial run
Chambers for 100 mm to 150 mm
Chambers for 200 mm to 300 mm
Chambers for 350 mm to 600 mm
Supply and installation of manually operated sectionlising & scour valve DI D/F Resilient seatedSupply & installation of DI Body Flanged End Tamper proof Kinetic Air Valve of min. PN1.6 with isolating sluice valves, with cost of specials etc., as per the scope of work and specifications & drawings, complete in all respect.
30% on Installation
5% on pre comissioning
5% on Trial run
30% on Installation
5% on pre comissioning
5% on Trial run
30% on Installation
5% on pre comissioning
5% on Trial run
30% on Installation
5% on pre comissioning
5% on Trial run
Construction of Air valve chamber/pillar , as per the scope of work and specifications & drawings, complete in all respect
Air valve Pillars
Clear Water Pumping Station at Banar Head work For Installation of 3W+3S Pumps & 2 pumps for future) Minimum area of 60 sqm
Clear Water Pumping Station at Naiyo ki Payu Head work For Installation of 2W+2S Pumps & 2 pumps for future) Minimum area of 48 sqm
Clear Water Pumping Station at Manaklao Head work (Exetension of existing pump house) For Installation of 6W+6S Pumps & 2 pumps for future) Minimum area of 80 sqm
Clear Water Pumping Station at Palri-Khichiya Head work For Installation of 3W+3S Pumps & 2 pumps for future) Minimum area of 60 sqm
Pump House - Mechanical and Electrical Equipment & Accessories: - Designing, Providing, installation, testing, trial run and commissioning of following pumps & energy efficient motors with base plate and other accessories, as per the scope of work & specifications given: Discharge and Tentative duty Head of pumpsets are as under:
Centrifugal horizontal split casing pumps & motor all other accessories of following duty conditions
Manaklao Pumping Station Clear Water Pumping Station at Manaklao to 450mm line 125.74 LPS /62 m head/156.66 KW (1W+1S), Total 313.32 KW
Banar Pumping Station
For ESR Banar 36.98 LPS / 30 m head/22.38 KW (1W+1S), Total 44.76 KW
For Nandra-Kallan CWR 23.92 LPS/30 m head/14.92 KW (1W+1S) Total 29.84 KW
Centrifugal Mono Block pumps & motor all other accessories of following duty conditions
Banar Pumping Station
For Deoliyan & Vishnoyo KD 5.80 LPS/48 m head/5.595 KW (1W+1S), Total 11.19 KW
Manaklao Pumping Station
For ESR Manai 4.53 LPS / 75 m head/7.46 KW (1W+1S), Total 14.92 KW
For ESR Basni Karwar 2.4 LPS/39 m head/3.73 KW (1W+1S), Total 7.46 KW
For ESR Rampura Bhatiyan 7.14 LPS/52 m head/7.46 KW (1W+1S), Total 14.92 KW
For CWR Palri-Khichiya Head work 11.16 LPS/58 m head/14.92 KW (1W+1S), Total 29.84 KW
Ralawas & Jajiwal Bhatiyan 18.26 LPS/57 m head/22.38 KW) (1W+1S) Total 44.76 KW
Naiyo ki Piou Pumping Station
For ESR Naiyo ki Paiyu 11.22 LPS / 30 m head/7.46 KW (1W+1S), Total 14.92 KW
For ESR Jajiwal Bhramna 9.69 LPS/39 m head/7.46 KW (1W+1S) Total 14.92 KW
Palri-Khichiya Pumping Station
ForESR Palri-Khichiya 14.55 LPS / 30 m head/9.325 KW (1W+1S), Total 18.65 KW
For ESR Palri Mangaliya 7.78 LPS/47 m head/7.46 KW (1W+1S), Total 14.92 KW
Distribution for Palri Natha & Palri Panwara 6.94 LPS/55 m head/7.46 KW (1W+1S) Total 14.92 KW
Nandra Kallan Pumping Station
Uchiyara CWR & kharda Randhir ESR 12.85 LPS / 66 m head/18.65 KW (1W+1S), Total 37.30 KW
Jajiwal Kallan Pumping Station
Distribuion for Jaiwal Kallan-Bhandariya Kallan and Kakarla 19.58 LPS / 30 m head/14.92 KW (1W+1S), Total 29.84 KW
Designing, providing, laying, jointing & testing of MS piping work complete job including suction / delivery piping, header pipes with provision of future expansion, pipes to pump inlets includes compound gauge, gate valve & dismantling joint, Sluice Valves and integral starter of Class PN 1.6 on suction & delivery individual common header with dismantalling joints, all fittings etc. complete, delivery manifold, outlet pipes with specials, one sluice valve, one butterfly valve with dismantling joint on individual and common delivery header, one dual plate check valve , expansion bellow, fittings, and other accessories as per scope of work and specifications as mentioned in the tender document and as per enclosed drawings, for following pumping stations.
Clear Water Pumping Station At Banar Head work
Clear Water Pumping Station At Naiyo ki Piayu Head work
Clear Water Pumping Station At Manaklao Head work
Clear Water Pumping Station At Palri Khichiyan Head work
Existing Clear Water Pumping Station At Jajiwal Kallan Head work
Existing Clear Water Pumping Station At Nandra Kallan Head work
Motor control panels for the pumps as per given scope of work and specifications for all motors for following pumping stations. (DOL starters for the motors upto 5 KW, Star Delta starters for motors beyond 5 KW and up to 30KW and soft starters above 30KW)
Clear Water Pumping Station At Banar Head work
Clear Water Pumping Station At Naiyo ki Piayu Head work
Clear Water Pumping Station At Manaklao Head work
Clear Water Pumping Station At Palri Khichiyan Head work
Existing Clear Water Pumping Station At Jajiwal Kallan Head work
Existing Clear Water Pumping Station At Nandra Kallan Head work
APFC panel as per given scope of work and specifications for the pumping station for following pumping stations.
Clear Water Pumping Station At Banar Head work
Clear Water Pumping Station At Naiyo ki Piayu Head work
Clear Water Pumping Station At Manaklao Head work
Clear Water Pumping Station At Palri Khichiyan Head work
Existing Clear Water Pumping Station At Jajiwal Kallan Head work
Existing Clear Water Pumping Station At Nandra Kallan Head work
LT cables with cable trays and accessories for motors & electrical equipment to be provided in pump houses as per given scope of work and specifications for following pumping stations.
Clear Water Pumping Station At Banar Head work
Clear Water Pumping Station At Naiyo ki Piayu Head work
Clear Water Pumping Station At Manaklao Head work
Clear Water Pumping Station At Palri Khichiyan Head work
Existing Clear Water Pumping Station At Jajiwal Kallan Head work
Existing Clear Water Pumping Station At Nandra Kallan Head work
Submersible type dewatering pump (10KLH,10 mt head), 1W+1S with level control switch & all necessary electric accessories. The work also includes drainage piping up to nearest drain outside pump house building.
Design and supply installation of Earthing system for LT equipments, instrumentation and motors to be installed in the contract at pumping station.
Clear Water Pumping Station At Banar Head work
Clear Water Pumping Station At Naiyo ki Piayu Head work
Clear Water Pumping Station At Manaklao Head work
Clear Water Pumping Station At Palri Khichiyan Head work
Existing Clear Water Pumping Station At Jajiwal Kallan Head work
Existing Clear Water Pumping Station At Nandra Kallan Head work
Supply & Installation of manually operated O.H.T.cranes with Electric hoists as per scope of the work and specifications for following pumping stations.
Clear Water Pumping Station At Banar Head work
Clear Water Pumping Station At Naiyo ki Piayu Head work
Clear Water Pumping Station At Manaklao Head work
Clear Water Pumping Station At Palri Khichiyan Head work
Providing & installation of pressure sensor, transmitter and indicator on each delivery common header pipe installed in the pump house on 16 rising mains and level sensor for total 20 ESRs and 6 CWRs including instrumentation control panel, complete in all respect as per given scope of work and specifications.
Clear Water Reservior: Design & Construction of RCC Clear Water reservoirs, as per specifications including fixing inlet; outlet & overflow pipes, installation of valves on inlet & outlet pipes, puddle collars, duck foot bends, pipe interconnecting the incoming & out going mains with all specials, water indicator, plinth protection works, with inter connection with existing system finishing, testing and commissioning complete as per the specifications and scope of work at following Head Works
At Banar Head Work-750 KL ( balance work)
At Palri - Khichaiyan-250 KL
At Naiyo Ki Piayu-250 KL ( balance work)
Construction of Elevated Service Reservoir Design & Construction of Over Head Service reservoirs of required staging, as per specifications including fixing inlet; outlet; washout & overflow pipes, installation of valves on inlet; outlet; washout & overflow pipes, puddle collars, duck foot bends, pipe interconnecting with the incoming & out going mains with all specials; water indicator, remote monitoring device with remote meter reading system at head works necessary instrumentation works, specifications and drawing plinth protection works on each SR / ESR, finishing,testing with multi purpose room in each ESR campus, commissioning complete as per the specifications and scope of work of following capacities at:
Manai-150KL, 20 m staging ( balance work)
Basni Karwar-100 KL, 24 m staging
Palri Mangliya -250 KL , 20 m staging ( balance work)
Jajiwal Bhatiyan -150 KL, 22 m staging ( balance work)
Jajiwal Gehlota-150 KL , 18 m staging ( balance work)
Thabukara -150 KL , 18 m staging ( balance work)
Daijar -350 KL, 20 m staging ( balance work)
Kharda-Randhir -250 KL , 20 m staging ( balance work)
Vishnoiyo KD-75 KL , 18 m staging ( balance work)
Deoliya -100 KL , 18 m staging ( balance work)
Design, providing, installation and testing commissioning of SCADA System for Automation in Project as per scope of work and specifications.
SCADA Master Control Station at Manaklao
SCADA Local Control Stations at following locations including CWRs at respective Pump House
Pumping station Manaklao and WTP Mananklao
Pumping station Palari khichiya
Pumping station Naiyo ki Piou
Pumping station Banar
Pumping station Jajiwal Kallan
Pumping station Nandra Kallan
Remote Stations at 37 VTCs for data transfer of Flow and pressure to LCS and MCS
Remote Stations at 20 ESRs for data transfer of water level to LCS and MCS
Construction of Boundary wall at Nandra Kallan (Extension), Jajiwal Kallan (Extension), Palri Khichiyan PS and at 10 No ESR sites including Gates, Cowcatcher,etc. as per scope and specification, as per 1direction of EIC.
Campus development at Palri Khichiyan and Naiyo ki Paiyu head works including general grading of the campus,Horticulture water supply, sanitation arrangement, Construction of RCC (M-20) approach road at IPS head works etc.
Construction of roof top rain water harvesting structure 40 KL capacity tanka at Govt. building
Raising of height 1.2 mtr of existing Boundary Wall with 1.8 mtr barbed wired fencing at Banar HW. This includes raising of height over the existing boundary wall with erection of GI barbed wire fancing on it. Complete work as per specification and scope of work.
Reparing of WTP at Manakalo HW. Making the plant operation through PLC/SCADA for automation, including installation of new electrically operated sluice valves of WTP. Installation of ultrasonic flow meter on raw water inlet channel. Calibration and rectification of existing parashall flume with SS flume or new construction if required. Installatioon of new 600 mm EM Flow Meter on 800 mm incomer pipeline. All valves and flow meter shall be integrated with SCADA for automation and monitoring. Necessary Panels, Consols, wiring desktop computer etc. shall be part of job as per standard practice.New PACl storage and dosing mechanism including one month storage in yard and one day storage in chemical house for dosing. Also include all required pumps, piping, cabling, tanks etc. complete job for PACl storage and handling/dosing. Complete job as per scope of work
Reparing of RWR (Diggi) at Manaklao HW. Reparing of damaged side lining as per scope of work.
Tools and tackles a per scope of work. Complete
Spare parts for Pipeline, Mechanical/Electrical/Instrumentation works complete job as per scoppe of work
O & M of complete Project for 10 years including existing components Cost for Basic Service Charges, Administration and Management, Running of Office, Staff Quarters, Comprehensive Operation, Maintenance and Repairs including Preventive Maintenance, Cost of material required for maintenance & repairs, Cost of Lubricants, cost of required chemicals (PACl, Lime, Chlorine etc.), bleaching powder (if necessary), Consumables, Spare Parts (if the spare parts supplied to PHED are used in emergency) as per Scope of Work & terms & conditions of contract. Complete job for 10 years after 1 year defect liability period including all required man power, chemicals, consumables, repairs, replacements etc.
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.42 MB
BOQ_733146.xls
BOQ • 0.39 MB
TD_2_VoI_I_II_III.pdf
Tender Documents • 17.46 MB
TD_2_VoI_IV_Preamble_Price_Schedule.pdf
Other Document • 0.15 MB
Download all tender documents and submit your bid