Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹1.3 CrAccepted-AOC 23 VIKAS NAGAR NEAR SATYAM SCHOOL NANTA ROAD KUNADI KOTA | KOTA | KOTA | RAJASTHAN | ₹1.3 Cr Quoted ₹1.4 Cr | L-1 | Accepted-AOC L-1 |
| 2 | L-2₹1.5 Cr+₹9.5 L (6.58%)Accepted-AOC 29 4A N S B ROAD SCHOOL MORE RANIGANJ BARDHAMAN WEST BENGAL 713347 | PASCHIM BARDHAMAN | WEST BENGAL | 713347 | ₹1.5 Cr+₹9.5 L (6.58%) | L-2 | Accepted-AOC L-2 |
| 3 | L-3₹1.6 Cr+₹12.2 L (8.47%)Accepted-AOC | ₹1.6 Cr+₹12.2 L (8.47%) | L-3 | Accepted-AOC L-3 |
| 4 | Rejected-Technical | - | - | Rejected-Technical Not Qualified |
Tender Value
₹1.1 Cr
EMD Value
₹2.3 L
Closing Date
22 Aug 2024, 12:00 pmClosed
CHIEF ENGINEER KSTPS, KOTA
New Adm. Building, Kota Super Thermal Power Station, Sakatpura, Kota
Operation and Maintenance of Fly Ash Handling System of Unit 7 and Maintenance of ESP system for Unit No. 1 to 7 KSTPS, KOTA
2024_RRVUN_410393_1
TN-5291
Open Tender
Repair and Maintenance Works
Percentage
365 days
Kota Super Thermal Power Station
As per QR mentioned in Tender documents
2 documents required · 2 mandatory
₹1,180
digitally as mentioned in tender documents
₹2.3 L
Yes
28 Mar 2025
8 Aug 2024
23 Aug 2024
8 Aug 2024
22 Aug 2024
8 Aug 2024
PART-A-I -Operation & Maintenance of Fly Ash Handling System of Unit 7 and Maintenance of ESP system for Unit No. 1 to 7 KSTPS, KOTA , KSTPS, Kota
Providing Assistance in operation of the entire Dry Fly Ash System from ECO, APH, ESP stack Hopper to Intermediate Silo, Intermediate Silo to Main Silo, Wet Disposal from Intermediate Silo to Slurry Pump House round the clock in three shift: Note:- During period of Annual Shutdown one shift in-charge and one semi-skilled shall be deployed in each shift and payment shall be made accordingly. Manpower Required
Shift Incharge/ Supervisor
Highly Skilled/ fitter
Skilled Fitter/ Electrician
Semi-skilled worker
Un -skilled worker
Daily Routine / Preventive / Breakdown maintenance work and upkeeping of Dry/Wet Fly Ash Handling System from ECO, APH, ESP & Stack Hopper to Intermediate silo & Intermediate silo to Main Silo, all equipments including water system in shift i.e. round the clock or as per instruction of engineer Incharge, Details as per Scope of work Man Power required
Trained supervisor (diploma holder)
Highly Skilled/compressor fitter
Skilled Fitter/ Electrician
Semi-skilled worker
Un skilled worker
Un -skilled worker/sweepers
Annual maintenance contract of ESP System for Unit # I to VII
Daily Routine/Periodic/Preventive/ Maintenance and upkeeping of Mechanical System of ESP Unit-1 to 7, as per instruction of Engineer Incharge Man Power required.
Highly Skilled
Skilled Fitter/ Electrician
Semi-skilled worker
Un -skilled worker
Semi-skilled worker as and when requirement of site
Bidder Name
Amount
BALAJI ENGINEERING COMPANY (GSTN-08AAEFB4279N1ZZ) BID ID -2901838
Krishna Engineering Works (GSTN-08AQDPS2196L1Z9) BID ID -2904923
M/S BANKESH MEHTA CONSTRUCTION COMPANY (GSTN-08APJPM3752K1ZH) BID ID -2905413
BALAJI ENGINEERING COMPANY (BID ID -2901838)
M/S BANKESH MEHTA CONSTRUCTION COMPANY (BID ID -2905413)
BALAJI ENGINEERING COMPANY (BID ID -2901838)
M/S BANKESH MEHTA CONSTRUCTION COMPANY (BID ID -2905413)
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .