Loading…
Loading…
Tender Value
₹1.5 L
EMD Value
₹2,940
Closing Date
27 Aug 2026, 6:00 pm3d left
Executive Engineer
Office Of The Executive Engineer REW Samba
Please Refer as per BOQ
2026_RDPR_320944_4
70 REW Samba of 2026-27, Dated 14.08.2026
Open Tender
Civil Works
Percentage
30 days
Nud
Please refer Tender documents.
3 documents required · 3 mandatory
₹600
Executive Engineer REW samba
₹2,940
14 Aug 2026
14 Aug 2026
28 Aug 2026
14 Aug 2026
27 Aug 2026
14 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30 cm measured at a height of 1 m above ground level and removal of rubbish upto a distance of 50 m outside the periphery of the area cleared. | 297.4 | sqm | 12.49 | ₹3,714.53 |
| 2 | Providing and fixing fly proof wire gauze to windows, clerestory windows and doors with M.S Flat 15x3 mm and nuts and bolts complete.
10.29.1 Galvanized M.S wire gauze with 0.63 mm dia wire and 1.4 mm aperture on both sides | 24.16 | sqm | 775.5 | ₹18,736.08 |
| 3 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth lead upto 25m in All kinds of soil | 1.59 | cum | 479 | ₹761.61 |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) | 1.03 | cum | 4,826.5 | ₹4,971.3 |
| 5 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 3.6 | cum | 5,733.6 | ₹20,640.96 |
| 6 | Centering and shuttering including strutting propping etc and removal of formwork for foundations. | 9.29 | sqm | 286.35 | ₹2,660.19 |
| 7 | Repairs to plaster of thickness 12mm to 20 mm in patches of area 2.5 sq. meters and under, including cutting the patch in proper shape raking out joints and preparing and plastering the surface of the walls complete including disposal of rubbish to the dumping ground within 50 meters lead
14.1.1 With cement mortar 1:4 (1 cement : 4 fine sand) | 27.19 | sqm | 441.4 | ₹12,001.67 |
| 8 | Distempering with 1st quality Acrylic/oil bound washable distemper (ready-made) having VOC content less than 50 grams/litre of approved manufacturer and of required shade and colour complete as per manufacturers’ specifications, one or more coats on old work | 387.96 | sqm | 50.75 | ₹19,688.97 |
| 9 | Finishing walls with water proofing cement paint of required shade Old work (one or more coats applied @ 2.20 kg/10sqm) complete | 155.76 | sqm | 64.45 | ₹10,038.73 |
| 10 | Painting with synthetic enamel paint of approved brand and manufacture one or more coats on old work to give an even shade. | 80.59 | sqm | 86.75 | ₹6,991.18 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.96 MB
BOQ_1069045.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].