| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 LAccepted-AOC | ₹1.5 L | L1 | Accepted-AOC Accepted as per agreement executed |
| 2 | L2₹1.6 L+₹10,310.92 (6.78%)Rejected-AOC | ₹1.6 L+₹10,310.92 (6.78%) | L2 | Rejected-AOC Rejected as per agreement executed |
| Sl No | Description | Qty | Unit | ANWAR CONSTRUCTION L1 | ASHARAFALI P T L2 |
|---|---|---|---|---|---|
| 1.00Anganavadi Maintenance | |||||
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 2 | cum | 232 ₹464 Lowest | 250 ₹500 |
| 1.00 | 15.7.1:Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In mud mortar | 5.77 | cum | 657 ₹3,788.26 Lowest | 728.74 ₹4,201.91 |
| 1.00 | 50.6.2.2:Solid masonry using pre cast solid blocks (factory made) of size 30x20x15cm or nearest available size confirming to IS 2185 part I of 1979 for super structure up to floor two level with thickness 15cm in : CM 1:6 ( 1 cement : 6 coarse sand) etc complete | 5.77 | cum | 6,957 ₹40,114.06 Lowest | 7,500 ₹43,245 |
| 1.00 | 13.88:Removing white or colour wash by scrapping and sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete. | 29.91 | sqm | 18 ₹538.4 Lowest | 20.48 ₹612.58 |
| 1.00 | 14.1.1:Repairs to plaster of thickness 12 mm to 20 mm in patches of area 2.5 sq meters and under, including cutting the patch in proper shape, raking out joints and preparing and plastering the surface of the walls complete, including disposal of rubbish to the dumping ground within 50 meters lead:With cement mortar 1:4 ( 1 cement : fine sand) | 110.56 | sqm | 522 ₹57,714.93 Lowest | 550 ₹60,810.75 |
| 1.01 | 13.7.1:12 mm cement plaster finished with a floating coat of neat cement of mix:1:3 ( 1 cement : 3 fine sand) | 2.1 | sqm | 423 ₹888.72 Lowest | 450 ₹945.45 |
| 1.01 | 5.30:Add for plaster drip course / groove in plastered surface or moulding to R.C.C. projections. | 26.19 | metre | 73 ₹1,911.87 Lowest | 81.15 ₹2,125.32 |
| 1.01 | 13.83.1:Wall painting with premium acrylic emulsion paint of interior grade, having VOC (Volatile including applying additional coats wherever required to achieve even shade and colour.One coat | 106.8 | sqm | 90 ₹9,612.09 Lowest | 100.62 ₹10,746.32 |
| 1.01 | 22.6:Providing and laying water proofing treatment on roofs of slabs by applying cement slurry mixed with water proofing cement compound consisting of applying : a) after surface preparation, first layer of slurry of cement @ 0.488 kg/ sqm mixed with water proofing cement compound @ 0.253 kg/ sqm. laying second layer of fibre glass cloth when the first layer is still green. Overlaps of joints of fibre cloth should not be less than 10 cm. c) third layer of 1.5 mm thickness consisting of slurry of cement @ 1.289 kg/ sqm mixed with water proofing cement compound @ 0.670 kg/sqm and coarse sand @ 1.289 kg/sqm. This will be allowed to air cure for 4 hours followed by water curing for 48 hours. The entire treatment will be taken upto 30 cm on parapet wall and tucked into groove in parapet all around. d) fourth and final layer of brick tilling with cement mortar (which will be paid for separately. For the purpose of measurement the entire treated surface will be measured) | 47.84 | sqm | 662 ₹31,670.08 Lowest | 700 ₹33,488 |
Tender Value
₹1.7 L
EMD Value
₹4,218
Closing Date
28 May 2026, 5:00 pmClosed
ASSISTANT ENGINEER
LID EW SECTION KOPPAM
Koppam Gramapanchayath 2025-26 Companypadi Anganavadi Renovation-Project no-374/26-Ward-12
2026_LSGD_851034_3
1/AE/LSGD/KPM/2026-27
Open Tender
Civil Works - Buildings
Item Wise
180 days
Koppam
Please refer Tender documents.
8 documents required · 8 mandatory
₹555
Yes
₹4,218
Yes
29 Aug 2026
19 May 2026
30 May 2026
19 May 2026
28 May 2026
19 May 2026
19 May 2026 - 28 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Anganavadi Maintenance | |||||
| 1.001 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | - | cum | - | - |
| 1.002 | 15.7.1:Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In mud mortar | - | cum | - | - |
| 1.003 | 50.6.2.2:Solid masonry using pre cast solid blocks (factory made) of size 30x20x15cm or nearest available size confirming to IS 2185 part I of 1979 for super structure up to floor two level with thickness 15cm in : CM 1:6 ( 1 cement : 6 coarse sand) etc complete | - | cum | - | - |
| 1.004 | 13.88:Removing white or colour wash by scrapping and sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete. | - | sqm | - | - |
| 1.005 | 14.1.1:Repairs to plaster of thickness 12 mm to 20 mm in patches of area 2.5 sq meters and under, including cutting the patch in proper shape, raking out joints and preparing and plastering the surface of the walls complete, including disposal of rubbish to the dumping ground within 50 meters lead:With cement mortar 1:4 ( 1 cement : fine sand) | 1 | sqm | - | - |
| 1.006 | 13.7.1:12 mm cement plaster finished with a floating coat of neat cement of mix:1:3 ( 1 cement : 3 fine sand) | 1 | sqm | - | - |
| 1.007 | 5.30:Add for plaster drip course / groove in plastered surface or moulding to R.C.C. projections. | - | metre | - | - |
| 1.008 | 13.83.1:Wall painting with premium acrylic emulsion paint of interior grade, having VOC (Volatile including applying additional coats wherever required to achieve even shade and colour.One coat | 0.4 | sqm | - | - |
| 1.009 | 22.6:Providing and laying water proofing treatment on roofs of slabs by applying cement slurry mixed with water proofing cement compound consisting of applying : a) after surface preparation, first layer of slurry of cement @ 0.488 kg/ sqm mixed with water proofing cement compound @ 0.253 kg/ sqm. laying second layer of fibre glass cloth when the first layer is still green. Overlaps of joints of fibre cloth should not be less than 10 cm. c) third layer of 1.5 mm thickness consisting of slurry of cement @ 1.289 kg/ sqm mixed with water proofing cement compound @ 0.670 kg/sqm and coarse sand @ 1.289 kg/sqm. This will be allowed to air cure for 4 hours followed by water curing for 48 hours. The entire treatment will be taken upto 30 cm on parapet wall and tucked into groove in parapet all around. d) fourth and final layer of brick tilling with cement mortar (which will be paid for separately. For the purpose of measurement the entire treated surface will be measured) | - | sqm | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1438014.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.62 MB
BOQ_1438014.xls
BOQ • 0.31 MB
sbd.pdf
Tender Documents • 1.67 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .