| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.0 CrAccepted-Finance | ₹2.0 Cr | L1 | Accepted-Finance it was put into lottery in presence of the bidders where Sri. Sanjaya Kumar Panda came as the winner |
| 2 | L1₹2.0 CrRejected-Finance AT PO GUNDICHA NAGAR MUNIPADA DIST RAYAGADA | RAYAGADA | RAYAGADA | ODISHA | 765017 | ₹2.0 Cr | L1 | Rejected-Finance it was put into lottery in presence of the bidders where Sri. Sanjaya Kumar Panda came as the winner |
| 3 | L1₹2.0 CrRejected-Finance | ₹2.0 Cr | L1 | Rejected-Finance it was put into lottery in presence of the bidders where Sri. Sanjaya Kumar Panda came as the winner |
| 4 | L1₹2.0 CrRejected-Finance | ₹2.0 Cr | L1 | Rejected-Finance it was put into lottery in presence of the bidders where Sri. Sanjaya Kumar Panda came as the winner |
| 5 | L1₹2.0 CrRejected-Finance | ₹2.0 Cr | L1 | Rejected-Finance it was put into lottery in presence of the bidders where Sri. Sanjaya Kumar Panda came as the winner |
Tender Value
₹2.3 Cr
EMD Value
₹2.3 L
Closing Date
27 Nov 2025, 5:00 pmClosed
PA ITDA BALLIUDA
PA ITDA BALLIUDA
Construction of 100 seated Hostel Building at Govt. UGHS Lankagada Under Tumudibandha Block
2025_STSCD_121091_7
PA (ITDA)-BLG-4/25-26
Open Tender
Civil Works - Buildings
Percentage
270 days
Govt. UGHS Lankagada Under Tumudibandha Block
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,000
₹2.3 L
Yes
18 Feb 2026
12 Nov 2025
28 Nov 2025
12 Nov 2025
27 Nov 2025
12 Nov 2025
Earthwork excavation of foundation in hard soil within initial lead & lift including rough dressing breaking of clods and leveling the bed and sides then depositing the excavated earth away from the work site etc. complete T & P required for the work as directed by the Engineer- in- Charge.
Filling in foundation and plinth with sand, well watered and rammed to required thickness with all leads and lifts, cost conveyance & royalty and all taxes of materials, cost of labour, T & P required for the work etc. complete in all respect as directed by the Engineer-In-Charge.
Cement concrete (1:3:6) with 40 mm in foundation using 40 mm size clean hard black hand broken granite metal of approved quality from approved quarry mixing with concrete mixture laying mannually including hoisting, lowering and laying in layers not exceeding 15 cm thick to the required level, ramming, watering with cost conveyance, royalty and all taxes of materials, cost of labour, T &P and machineries etc curing etc. complete. as directed by the Engineer-In-Charge.
Fly ash brick massonary of size 25 cm x 12cm x 8cm having a crushing strength not less than 75 Kg/sq.cm in cement mortar (1:6) in superstructure including splays cutting, circular moulding, chamfering and corbelling, and watering and curing etc. complete including cost conveyance, royalty and all taxes of materials with cost of labour, T & P etc. required for the work complete in all respect as directed by the Engineer-In-Charge..
FIRST FLOOR
SECOND FLOOR
R.C.C. in CC (1:1½:3) with clean hard broken granite chips of 12 mm size consistent with strength and strengthen cover of concrete, of approved quality and from approved quarry mixing with concrete mixture & laying mannually including hoisting with and laying concrete in layer not exceeding 15cm in depth to the required thickness and compacting as per the direction of the Engineer-in-charge including rigid & smooth centering , shuttering , watering and curing for four weeks and finishing the exposed surface smooth with cost, conveyance, taxes and royalities and taxes of all materials, labour T & P, hire and running charges of machineries required for the work, but excluding cost,conveyance, of M.S/T.S Rods and direction of Engineer-in-charge. (GROUND FLOOR) Column Footing
Plinth Beam
Lintel Bend
Column & Beam
Slab & Chajja
Lintel Bend (First Floor)
Column & Beam
Slab & Chajja
Lintel Bend (Second Floor)
Column & Beam
Slab & Chajja
Providing HYSD Bar reinforcement for R.C.C work including straighting, cutting, binding, welding, tying the grills, laying and placeing the proper position as per approved design and drawing including cost, conveyancye of 18 to 20 gauge binding wire cost and conveyance HYSD bars complete in all respect as per specification for road and bridge and direction of engineers in charge. (Ground Floor)
First Floor
Second Floor
25 mm thick Grading concrete with (1:2:2) over roof slab to proper slope finished smooth including cost of water proof compound with watering and curing including cost, conveyance, royalty and all taxes of materials with cost of labour and T & P etc. required for the work complete in all respect as per direction of Engineer-in-Charge. (Second Floor)
20 mm thick cement plaster in cement mortar (1:6) over stone masonary finished smooth including watering and curing, cost conveyance royalty and all taxes of materials with cost of labour and T & P etc, required for the work complete in all respect.
16 mm thick cement plaster in C.M. (1:6) over brick work (inside walls), after raking out joints finished smooth including watering and curing, cost conveyance royalty and all taxes of materials with cost of labour and T & P etc, required for the work complete in all respect. (Ground Floor)
First Floor
Second Floor
12 mm thick cement plaster in cement mortar (1:6) over stone masonary finished smooth including watering and curing, cost conveyance royalty and all taxes of materials with cost of labour and T & P etc, required for the work complete in all respect.
First Floor
Second Floor
6 mm thick cement plaster in C.M (1:4) to RCC surface finished smooth including watering and curing, cost conveyance royalty and all taxes of materials with cost of labour and T & P etc, required for the work complete in all respect.
First Floor
Second Floor
Fixing Vetrified tile in floors, trade or steps & landing on 25 mm thick cement plaster (1:1) jointed with neat cement slurry mixed with pigments to match the shade of the tiles rubing and polishing etc. Complete (Ground Floor)
First Floor
Second Floor
Fixing of Ceramic tiles of approved shade and design over 12 mm thick cement plaster (1:3) over brickwork for dadoes, finished smooth with proper thickness, watering, curing for seven days with cost conveyance, royality, taxes of all materials, labour etc complete. (Ground Floor)
First Floor
Second Floor
Fixing of Granite tiles of approved shade and design over 12 mm thick cement plaster (1:3) over brickwork for dadoes, finished smooth with proper thickness, watering, curing for seven days with cost conveyance, royality, taxes of all materials, labour etc complete.
First Floor
Second Floor
Supplying fitting fixing M.S. shutter for door & windows including all cost, conveyance and taxes of all materials and labour charge etc. complete in all respect as per direction of Engineer-in-Charge.
Supplying fitting fixing of M.S. grill for window & gate including all cost, conveyance and taxes of all materials and labour charge complete etc in all respect as per direction of Engineer-in-Charge.
Supplying fitting, fixing fully glazed aluminum framed openable windows using 15 micron anodized OEL aluminum section 2082 as out section, 9139 as mullion section, 4124 as a shutter section frame with tapered clip of section 4125, aluminum angle , rubber beading, friction stay and handle etc. with 5mm black glass.
Finishing of wall surface of wall with Acrytic wall putty (water based) of appoved make and finishing smooth and even surface. to receive paiting with all cost of scaffordrng slaging charges wnh cost of all materials, labour T& P and all taxesetc complete. (Ground Floor)
First Floor
Second Floor
Wall painting two coats with plastic emulsion paint of approved shade on new work over one coat of primer with approved primer on new wall surface. complete (Ground Floor)
First Floor
Second Floor
Weather coating two coats to the wall with approved shade over a coat of wall primer on new work to give on even shade including cost of weather conveyance, taxes of all materials, labour etc complete. (Ground Floor)
First Floor
Second Floor
Painting two coats with any approved paints over a coat of priming to new wood work and iron works including sand papering polishing the surface with all cost, conveyance, royalty and all taxes of materials including cost of paints and primer, cost of labour and T & P etc. required for the work complete in all respect. (Ground Floor)
First Floor
Second Floor
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.58 MB
BOQ_563489.xls
BOQ • 0.38 MB
DTCN.pdf
Tender Documents • 3.79 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .