Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance F NO 302 SARANG RESIDENCY PLOT NO 29 OLD VIJAY NAGAR AGRA 282004 | AGRA | AGRA | UTTAR PRADESH | 282004 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
Refer Docs
EMD Value
₹1.9 L
Closing Date
27 Dec 2021, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Project Manager
Unit-17, C and DS UP Jal Nigam, Mathura
Construction of 1000 Capacity Auditorium between Mathura and Vrindavan Distt Mathura
2021_UPCDS_661427_1
1436/M-14/76 Dated 18.12.2021
Open Tender
Repair and Maintenance Services
Item Wise
90 days
Vrindavan
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,900
as per NIT
₹1.9 L
27 Dec 2021
21 Dec 2021
27 Dec 2021
21 Dec 2021
27 Dec 2021
21 Dec 2021
120 days
Amount
Survey with total station system with two person including carriage of equipment at site reuired for 8 hours
Clearing Jungle including uprooting of trunks, vegetations, grass and saplings or girth upto 20cm and removal of rubbish up to a distance of 50 mts.
Layout of building plan, marking of center lines for level pillars and checking of rectangles etc. including supply all materials, labour T&P etc. complete.
Making level pillers for marking level and center line of buildings. Upto 60 cm. to 75 cm height.
Making level pillers for marking level and center line of buildings. for 1.1 m length
Excavation of foundation in ordinary soil (loam clay or sand) including lift upto 1.50 meter and lead upto 30 meter and including filling, watering and ramming of excavated earth into the trenches or into the space between the building and sides of foundation trenches or into the plinth and removal and disposal of sur-plus earth as directed by the Engineer incharge up to a distance of 30 meters from the foundation trenches. Level 0.0 to 1.50 mt.
Level 1.50 to 3.00 mt.
Level 3.00 to 4.50 mt.
Laying in cement concrete 1:4:8 to 1:6:12 (Graded Stone/Brick aggregate 40 mm nominal size) and curing complete, including cost of form- work, in foundation and floors.
Sand filling in plinth under floors including watering, ramming, consolidating and dressing complete including lead up to 50m and lift upto 1.5m and including cost of sand.
Compaction of filled earth work in layers by rodding, watering, levelling, dressing etc. complete.
Labour Charges for layout of center for columns at different level.
Labour Charges for fixing & removal of Starter and casting of starter for column.
RCC Work in foundation, slab, beam, column & beam Lintels etc. excluding cost of all materials also including curing, all labour, T&P complete for proper completion or work. ( note - An Increase of 5% per floor will be allowed in labour rates only ) In Foundation upto plinth.
In Ground/First floor lintel, beam & slab etc.
In column & shear wall.
CC Work 1:2:4 in sill, boundary post, shelves & similar small work with 20mm gauge stone grit with centring and shuttring etc complete.
Brick Work in all ratio of cement and coarse sand mortar in foundation and plinth including supply of all labour T&P etc.
Brick work in all ratio of cement and coarse sand mortar in super structure above plinth level upto roof level of 3.50m including necessary cutting and moulding of bricks as required and also including honey combed brick work in thickness of wall more than 12cms with scafolding & curing etc. 1 Brick Wall
AS in item no. 14 but for wall thickness 12cms.
AS in item no. 14+ above but masonary 7.5cm thick in super structure (as in railing facia and fins etc.)
Laying damp proof course 40 mm thick with cement concrete 1:2:4 (1 cement: 2 coarse sand: 4 grades stone aggregate 10mm nominal size) and including proper shuttering & curing complete.
Painting on DPC with two coats of air blown bitumen 85/50 or 85/25 @ 1.7 Kg./m2 approx. including cost of bitumen fuel if any.
Providing and injecting chemical emulsion for preconstructional antitermite treatment and creating a chemical barrier under and around the column pits wall trenches basement excavation top surface if plinth filling junction of wall and floor, along the the external perimeter of binding expansion joints, surrounding of pipes and conduits etc, complete (plinth area of the building at ground floor only shall be measured as per I.S.6313(PartII 1981)Alderine emulsifiable concentrate or any other approved material such as Heptrachlor or Chlordane will be used. The rate of application of chemical emulsion shall be as follows : (1)Treatment for masonary & foundation 5 liters per sqm. (2) Back fill in immediate contact with foundation 7.5 liters/sqm (3) Treatment of top surface of plinth filling 5 liters/sqm (4) Treatment of soil along external perimeter of building 7.5 liters/sqm. (5) Treatment of soil under apron along external perimter 5 liters/sqm.
Mild steel or iron work in heavy size such as trusses, build up gates, record racks, roof work and gates etc. wrought to required from including drilling holes riveting or welding where necessary and their fixing required for proper completion of the work including errection at site.
Mild steel or iron work in small size and section such as holding down bolt, hole fasts, tie rods, grating, grill/stair case railing, Z section steel, chaukhat, window etc.
Mild steel or iron work in plain work such as reinforced concrete or reinforced brick work (when not wrought to included in an overall rates) wrought to required shape as necessary including bending for proper completion of the work up to floor two level. excluding cost of steel & its wastage but including cost of binding wire. Note: Rates are valid up to G+1 only, above G+1 labour rates increased by 5% only. 8mm to 32 mm TMT Bar
Providing & laying brick coba 12mm thick laid with M-150 brick bat coba 7.5cm thick with gap of 15mm to each other over 20mm thick base of cement, mortar 1:4 cement & coarse sand mixed with water proofing compound spreading cement slurry mixed with arelic cement, concrete water proofing compound filled gap of coba & top of coba mortar mixed with water proofing cement compound in 1:4 cement & course sand, mortar finished smooth & top mashed falls wquare 30cmX30cm and side wall parapet shall be monolithic plaster wall up to 30cm complete the work only labour rate including water proofing compound up to 2000m.
Plaster work Uptp 12mm thick
Plaster work 12mm to 20mm thick
Making drip course in sunshades or facia as per direction by Engneer I/C upto 4 storey.
Engraving lines in plaster for making groove as per direction of Engg. Incharge.
Flooring Kota stone flooring including, rubbing and polishing and including floor grinding machine and carborandom stone etc. complete.
Marble/Kota stone skirting 100 mm to 150 mm wide skirting.
Fixing of China glazed tiles (white/coloured) finished wall and floor tiles with white/coloured cement slurry as per direction of E/I.
Fixing of polished granite stone slab for floor dado of walls in cement mortar and joints with white cement/oxide colour with slab/tiles.
Laiyng vitrified tiles in floor including all work such as providing in base cement , mortar and grouting of joint.
Granite Tiles/ Glazed Tiles / vitrified tiles skirting 100 to 150 mm wids.
(a) 25mm thick 1:2:4 plain cement concrete floor laid in panels excluding, fixing of glass strip and finishing with floating coat of neat cement as per seecifications or as directed by E/I.
Cutting edges of granite/kota stone slab in moulded shape including cost of all labour and machine charges (a) Half round shape (one edge) kota stone
(b) Half round shape (one edge) Granite stone
(c) Full round shape (both edge) Kota stone
(d) Full round shape (both edge) Granite stone
Cutting of granite stone slab for owal/square shape WHB/sink size 55x40cm/60x45cm. Complete:
(a) Labour Charges for casting of pre cast RCC Lintel upt 1.5 mtr including Reinforcement and shuttering.
(b) Fixing of R.C.C. Precast lintels in positio. Upto 1.5 Mt. including carriage etc. as per direction.
Cinder filling in sunken floor of WC etc. complete GF roof level.
Fixing and removal of shuttering and centering for RCC work including applying shuttering oil (1m oil:4 diesel) on shuttering materials filling the joint gap in shuttering to give smooth finish to the satisfaction of engineer incharge cleaning of shuttering material before and after concreting, and also including stacking and shifting upto 3.6m height shuttering and centering., Foundations, footings, bases of columns, etc.
Suspended floors, roofs, landings, balconies and access platform
Lintels, beams, plinth beams, girders, bressumers and cantilevers
Columns, Pillars, Piers, Abutments, Posts and Struts
Arches, domes, vaults up to 6 m span
Cornices and mouldings note -Extra for shuttering in circular work (20% of respective centering and shuttering items)
Water Tanker 6000 litre capacity or more including tractor, driver and P.O.L.
Hire charges for 5 to 10 KVA generator with operator & out fuel.
Providing supervisor for supervision of works
Providing chawkidar for watch & wards
Providing majdoor/coolie for cleaning, shining, sweeping, washing of floor, rubbing etc.
Hire charges for supply of earth excavator (JCB) for misc. work with driver including P.O.L
Tractor with Trolley including driver and P.O.L
Fixing of CPVC pipe line internal or external open line including cutting and jointing. (a) 15mm dia.
(b) 20mm dia.
(c) 25mm dia.
(d) 32mm dia.
(e) 40mm dia.
Fixing of PVC pipe including joints and fixing clamp and accessories. (a) 75 mm dia.
(b) 100 mm dia.
(c) 150 mm dia.
Fixing of stoneware pipe in level and slope and jointing with stiff mixture of cement ratio of 1:1 including testing of pipes and joints complete including earth work excavation laying of PC in base/alround of pipe and refilling with E.W. complete.(a) 100 mm dia.
(b) 150 mm dia.
(c) 200 mm dia.
Labour charges for fixing water coset (indian tpe WC pan ) with 100 mm sand cast iron /PVC P or S trap, 10 ltr low level PVC cistern with manual controlled device (handle lever ) conforming to IS :7231 with all fitting and fixures compllete and making good the walls and floors wherever required
Labour charges for fixing water coset (European type WC pan ) with 100 mm sand cast iron /PVC P or S trap, 10 ltr low level PVC cistern with manual controlled device (handle lever ) conforming to IS :7231 with all fitting and fixures compllete and making good the walls and floors wherever required
fixing of cp fitting such as plain bib cock, angle cock, stop cock copper pipe , cp cap , extn PC , shower etc
fixing of nahani trap , floor trap compllete
fixing of european type white glazed cistern ware IVC pan backelite seat cover & llid with CP brass hinges and rubber bufferss
fixing of urinal , urinal partiton plate , pedstal (600*350) wit intergral longitudinall flush pipe and braackets
Fixing of wash basine with single hole/ no of holes for pillar tap with CI or MS, Bracket Paint including cutting holes and maaking good the same 550X400mm, 630X450mm
Fixing of Kitchen, laboratory sink with CP or MS, Bracket Paint including cutting holes and maaking good the same
Fixing of CP bottal trap bend, plastic sheet cover, urinal connection, spreader, dom grating, waste pipe.
Making of chamber complete including earth work, pcc, brick work , plaster and rcc slab etc (a) 600x600x900
Laying of conduit pipe in wall or slab includidng cutting & pre-plaster wiring cutting of shut and fixing of switches in shut complete in all respect as per site Engineer-in-charge.Switch 15 amp power point
Switch 5 amp (for light & fan)
Socket 5 amp (for light & fan)
Circuit
Distribution Board
Fixing of Tube Light/ Ceiling Light
Fixing of Ceiling Fan/Ehaust Fan
M.G. Construction
MITTAL ASSOCIATES
stage.html
html • 0.02 MB
finance_1048023.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .