Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance A 1693 2ND FLOOR GREENFIELDS FARIDABAD 121003 | FARIDABAD | FARIDABAD | HARYANA | 121003 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance 3 RUJETA 67 PANMALA SINHAGAD ROAD PUNE 411030 MAHARASHTRA | PUNE | PUNE | MAHARASHTRA | 411030 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance B 48 2ND FLOOR SECTOR 63 NOIDA 201302 UTTAR PRADESH | NOIDA | GAUTAM BUDDHA NAGAR | UTTAR PRADESH | 201302 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
Refer Docs
EMD Value
₹42,500
Closing Date
31 Aug 2020, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Dy.GM
RITES Ltd., RCED (5th Floor, Right Wing), RITES Bhawan, Plot 1, Sector 29,Gurgaon, Haryana - 122001
SERVICES FOR CARRYING OUT SURVEY AND ALLIED WORKS FOR DPR OF CONSTRUCTION OF HIGHWAY TUNNEL INCLUDING APPROACHES ACROSS SHINKUN LA, TANGLANG LA and LACHALUNG LA IN THE UNION TERRITORY OF LADAKH.
2020_RITES_54470_1
RITES/IS/RCED/T/LDK_DPR/SURY
Limited
Survey and Investigation services
Item Rate
75 days
LADAKH
As per tender document
3 documents required · 3 mandatory
₹2,500
Yes
RITES LTD
₹42,500
Yes
1 Sept 2020
5 Aug 2020
1 Sept 2020
5 Aug 2020
31 Aug 2020
7 Aug 2020
30 days
Amount
RECONNAISSANCE SURVEY; Carrying out reconnaissance survey of the project area for identifying the Control Points for carrying out DGPS survey and preparing plan of grid network of Control Points on SOI toposheets/ satellite imagery. The work included service of engineers, scientists, surveyors, draftsmen, CAD operators, labors, helpers and others (computer, printers & tracing etc.)
Establishing co-ordinates (in grid and ground co-ordinates system) of Control Points at every 5 kms (approx.) by carrying out DGPS survey along the approved alignment for setting out of works on the project and submission of DGPS survey report as approved by Employer. (a) Raw DGPS data for the entire length and adjoining areas of interest (b) shall be submitted in the format as directed by engineer-in-charge.
Double Tertiary Levelling Survey of the area for establishment of vertical co-ordinates of Control Points and submission of survey report as per format approved by Engineer in charge. Quantity considered is for total leveling length.
PERMANENT CONTROL POINT(CP) PILLERS; Construction of cast in-situ Permanent Control Point pillars of size 5OOmm x 5OOmm x 1OOOmm of RCC (Nominal Mix 1 :1.5,:3) with provision of 700mm long M.S. angle of size 5O x 5O x 5mm with brass nailing on the MS angle for marking the Control Points and embossing the CP pillar number on the MS plate of size 125mm x 125mm x 150mm embedded in concrete by four 6mm dia rods lSOmm long as per approved drawing. The work included cost of material such as cement, reinforcement, aggregates; Tool & Plants, all lead & lifts, labour, shuttering, curing etc as a complete job.
Conducting Aerial Topographical Survey using aerial Li DAR to capture ground features and assets of the area including hire charges for equipment and supply of survey teams comprising of project survey field staff etc. inclusive of cost of materials, labour, preparation of Drawings and their submission as per contract provision. (a) Point cloud data/ Data of points captured for the entire area of interest (b) Topographic map of scale 1:1000 of the entire areas of interest (c) Contour map of 50 cm of entire areas of interest (d) Cross section of the road at every 1 m (in *.dwg format) (e) 360 degree panoramic images of the entire length and adjoining area of interest (f) ortho-images of the entire length and adjoining areas of shall be submitted in the format as directed by engineer-in-charge.
Development of Plan and L section of the Access Roads including staking of Access Roads to various proposed major work sites on the alignment from the existing roads with 100mm x 100mm x 750 RCC pegs. The work included cost of material such as cement, reinforcement, aggregates; Tool & Plants, all lead & lifts, labour, shuttering, curing etc as a complete job for RCC pegs.
STAKING & FIXING ALIGNMENT AND BOUNDARY PILLARS; Casting and Fixing in place of Precast/Cast-in-situ RCC (nominal mix 1 :1.5,:3) pillars of size 150mm dia x 900mm length on both side of the approved alignment which includes painting as per approved colour scheme, numbering and engraving of NHIDCL logo on the pillars. The pillars shall be fixed at every 100m in straight alignment, at every 20m in curves( as well as at ST, TC, CT, TS, Crown points of curve), abutments and piers of bridges, start, centre & end of stations, at tunnels portals etc. and at proposed railway land boundary. The work includes cost of material such as cement, reinforcement, aggregates; Tool & Plants, all lead & lifts, labour, shuttering, curing etc as a complete job.
Ark Services Pvt. Ltd.
Monarch Surveyors and Engineering Consultants Pvt Ltd
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .