Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.6 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹2.7 L+₹14,429.82 (5.59%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹2.8 L+₹22,240.13 (8.62%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | L4₹3.5 L+₹88,785.38 (34.4%)Admitted-Finance | L4 | Admitted-Finance | ||
| 5 | L5₹3.5 L+₹92,287.76 (35.8%)Admitted-Finance | L5 | Admitted-Finance |
Tender Value
₹3.4 L
EMD Value
₹6,860
Closing Date
18 Sept 2026, 6:00 pmClosed
Executive Engineer
XEN
As BOQ
2026_RDPR_324393_14
118 REW Samba of 2026-27 Dated-12-09-2026
Open Tender
Civil Works
Percentage
45 days
Ramgarh
Please refer Tender documents.
3 documents required · 3 mandatory
₹600
Executve Engineer Rew Samba
₹6,860
24 Sept 2026
12 Sept 2026
19 Sept 2026
12 Sept 2026
18 Sept 2026
12 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth -1 m from cutting edge : All kind of soil. | 9.35 | Cum | 479.3 | ₹4,481.46 |
| 2 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) | 4.62 | Cum | 4,826.5 | ₹22,298.43 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 11.2 | Cum | 5,733.6 | ₹64,216.32 |
| 4 | Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in foundation and plinth including curing in : | 8.35 | Cum | 9,027.2 | ₹75,377.12 |
| 5 | Extra for brick work with common burnt clay bricks/cement concrete bricks in superstructure above plinth level upto floor five level | 1.53 | Cum | 1,455.9 | ₹2,227.53 |
| 6 | Providing and laying vitrified floor tiles in different sizes (thickness to be specified by the manufacturer) with water absorption less than 0.08% and conforming to IS:15622 of approved make, in all colours and shades, laid on 20mm thick cement mortar 1:4 (1cement :4 coarse sand) including grouting the joints with white cement and matching pigments etc. complete | 10.25 | Sqm | 1,395.5 | ₹14,303.88 |
| 7 | Providing and laying vitrified Wall tiles in different sizes (thickness to be specified by the manufacturer) with water absorption less than 0.08% and conforming to IS:15622 of approved make, in all colours and shades, laid on 20mm thick cement mortar 1:4 (1cement :4 coarse sand) including grouting the joints with white cement and matching pigments etc. complete | 11.71 | Sqm | 1,229.2 | ₹14,393.93 |
| 8 | Cement Concrete Flooring 40 mm Thick (1:2:4) Mix DPC | 18.82 | Sqm | 376 | ₹7,076.32 |
| 9 | Centering and shuttering including strutting, propping etc. and removal of form work for: foundations, footings, bases for columns etc. | 14.31 | Sqm | 286.35 | ₹4,097.67 |
| 10 | Suspended floor Soffit of Slabs | 10.25 | Sqm | 718.2 | ₹7,361.55 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.00 MB
BOQ_1094252.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .