| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.3 CrAdmitted-Finance | ₹4.3 Cr | L1 | Admitted-Finance |
| Sl No | Description | Qty | Unit | ENERGYPACK BOILERS PRIVATE LIMITED L1 |
|---|---|---|---|---|
| 1.00CHARGES FOR 1st YEAR | ||||
| 2.00SERVICE CHARGES | ||||
| 3.00 | Chemical Internal cleaning if Required of coil includes activity form | 1 | each | 2,34,375 ₹2,34,375 Lowest |
| 4.00(a) Prepare Boiler and systems for pre-chemical internal cleaning if required.+C9:C18CC9:C23 | ||||
| 5.00(b) Connect the chemical circulation pump to coil inlet. | ||||
| 6.00(c) Connect flexible hose pipe to coil outlet for recirculation of chemical | ||||
| 7.00(d) Arrangement of fresh water transfer to temporary tank. | ||||
| 8.00(e) Addition& mixing of chemical in Tank. | ||||
| 9.00(f) Start the Chemical Circulation with Temporary pump. | ||||
| 10.00(g) Circulate the chemical & observe the water level in tank. | ||||
Tender Value
₹1.3 Cr
EMD Value
₹6.6 L
Closing Date
25 Mar 2021, 12:00 pmClosed
CAPT RAKHI RAM
FMU MUMBAI NAVAL DOCKYARD MUMBAI 400001
TENDER ENQUIRY FOR PRICE AGREEMENT FOR REPAIR OVERHAUL OF MS ENERGYPACK MAKE AUXILIARY BOILERS FITTED ONBOARD KOLKATA CLASS OF SHIPS
2021_NAVY_427943_1
FMU/344/PA/ENERGYPACK BOILER
Open Tender
Marine Services
Turn-key
360 days
FMU MUMBAI
Please refer Tender documents.
2 documents required · 2 mandatory
₹100
Yes
PCDA NAVY
₹6.6 L
Yes
31 Mar 2021
4 Mar 2021
26 Mar 2021
5 Mar 2021
25 Mar 2021
5 Mar 2021
5 Mar 2021 - 15 Mar 2021
Amount
CHARGES FOR 1st YEAR
SERVICE CHARGES
Chemical Internal cleaning if Required of coil includes activity form
(a) Prepare Boiler and systems for pre-chemical internal cleaning if required.+C9:C18CC9:C23
(b) Connect the chemical circulation pump to coil inlet.
(c) Connect flexible hose pipe to coil outlet for recirculation of chemical
(d) Arrangement of fresh water transfer to temporary tank.
(e) Addition& mixing of chemical in Tank.
(f) Start the Chemical Circulation with Temporary pump.
(g) Circulate the chemical & observe the water level in tank.
(h)Once the chemical cleaning is over flush the coil with Alkaline chemical to neutralize the water in coil.
(j) Drain the water from Coil & fill with fresh feed water.
(k) Install the inner jacket cover with its proper packing.
(l) Install the top cover of the boiler with its proper packing & mounting accessories.
(m) Reconnect the Boiler water feed pump again with new gaskets.
(n) Install the Burner again on to top plate with packing.
(p) Connect the Fuel piping, air atomization piping, electrode cables etc.
(q) Take trial for air/fuel Leakages.
Cleaning of Boiler by Water Washing (Coil/Jacket/Inner Jacket) Includes activity from.
(a) Disconnect the Burner, oil line, Electrode cables.
(b) Remove the Burner from Top plate.
(c) Remove Boiler top cover with its packing & top accessories.
(d) Remove Inner Jacket Cover & its packing.
(e) Prepare the boiler for its external cleaning.
(f) Once the access to the helical coil is made clean soot deposits accumulated in bottom part of the boiler by water washing and ensure furnace drain is clear.
(g) Examine accessible areas of coils, shells and boiler insulation refractory work for soot deposits, corrosion/Wastage and defect, or damages observed except refractory work by changing all the gaskets/packing & hardware.
(h) Clean the coil inner surface by wire brush.
(j) Again, clean the coil with water.
(k) Install the burner with oil line,electrodes& solenoid valve connection done & make the burner ready for firing.
(l) Box-up boiler and dry out boiler/refractory by firing the boiler in low fire gradually.
Servicing of Combustion Equipment
(a) Burner removal with oil hoses, airline& electrode removal.
(b) Assessment of air/fuel hose pipe condition/dismantling & assembly.
(c) Burner plate removal from top plate.
(d) Diffuser plate removal, cleaning & assembly.
(e) Photocell removal & its viewing port cleaning.
(f) Burner gasket replacement
(g) Check the photocell.
(h) Checking of electrodes, cleaning the same, Checking of sparking testing.
(j) Nozzle dismantling /cleaning /reassembly.
(k) Electrode removal /Cleaning, examine electrodes tips, firmly secured in the porcelain &their caps, installation & its setting.
(l) Electrode cap removal/cleaning.
(m) Fuel solenoid valve dismantling /Seat +diaphragm check & assembly.
(n) Sight glass (viewing) removal & cleaning.
Overhaul of Feed Pump and Associated Fitting
(a) Clean and examine feed pump suction strainer. Replace the sealing gasket if found damaged.
(b) Remove Pump front Valve Block & inspect cup Washers in suction Discharge port with NRV mechanism.
(c) Replace the Washers, NRV assembly if found damaged with new one & reassemble the pump.
(d) Overhauling of feed pump relief valve. Examine all parts of the valves & lap it if necessary. If the seat is damaged beyond repair replace the Valve with new one.
(e) Examine holding down arrangement of feed pump and its motor. Tighten foundation bolts as necessary.
(f) Check tension and alignment of feed pump belts and adjust as required. Check alignment of pump & motor pulley. Check for key way.
(g) Check the Flange joints of pump suction & discharges. Replace in necessary.
(h) Check the Flange hardware & replace if necessary.
(j) Apply grease to moving part as required.
Overhaul of FD fan (Blower)
(a) For Bearing greasing disconnect motor, remove fan from motor & do greasing.
(b) Fan motor terminal replacement.
(c) Fan leveling & foundation bolt tightening.
(d) Disassemble the fan with air duct, casing suction damper & Impeller. Assembly of Fan with leveling.
(e) Fan air sealing arrangement overhauling.
(f) Fan casing hardware replacement.
(g) Fan suction damper removal& it’s overhauling.
(h) Fan suction air duct removal & suction air control damper replacement if necessary.
(j)Fan foundation frame change with its hardware if necessary.
Overhaul of Fuel Oil Pump
(a) Dismantle fuel oil pump with its inlet & outlet fuel piping removal from base frame.
(b) Dismantle pump internals like Pressure regulating mechanism, Cleaning of the pump internals & reassembly.
(c) Removal of pump from base frame removal of coupling & pump mechanical seal assembly. If found leaking, replace with new one. Assemble the pump with motor & its alignment.
(d) If Fuel pump is not developing pressure, then dismantle it form base frame.
(e) Remove the coupling, replace it with new &reassembly of the pump & motor with alignment.
Overhaul of Safety Valves
(a) Check working of both safety valves with boiler pressure set at 10kg/cm2 as per the procedure in boiler manual.
(b) Open the valves from the Steam Header with inlet & discharge line opened if found leaking.
(c) Check the discharge pipe condition & replace if the pipe line is corroded.
(d) Dismantling of the valve & accessing the condition of the Blow down ring Valve seat assembly. Lap the seat if seat is leaking & reassemble the valve after complete overhaul.
(e) Fixing of valve on to steam header with New gasket &hardware set. Connect discharge pip line with new gasket
(f) Check the operation of the valve again on boiler & set the valves if required.
(g) Lock the safety valve setting.
Overhaul of various valves
(a) Remove the Gland nut of the valve which are leaking & assess the condition of the gland. Remove the Gland & replace it with gland rope & assemble the valve again.
(b) Remove the valve from the Piping if the Leakage through the seat is observed. Dismantle the valve & check the valve seat. If the valve seat is suitable for lapping, lap the valve & assemble it back.
(c) If the valve is leaking & not possible to lap or damage is
(d) economically non-repairable, replace with new one.
(e) Re-install valves on boiler systems.
Servicing of Boiler Safety Devices/ Systems
(a) Check performance of boiler safety device one by one as per its application.
(b) Check the setting of each safety device w r t its design /operating parameters.
(c) Set the safety device one by one as per the design / operating parameters.
(d) Replace the safety device which is found not working. (No repair will be carried out on Safety equipment except Safety Valves).
(e) Undertake post-repair/ overhaul adjustment/turning of safety device/systems as required.
(f) Function test of Sequence Controller & Photo Cell.
Servicing of Boiler Control System
(a) Check performance of boiler control system. In both auto and manual modes of boiler operation.
(b) Undertake Overhaul of defective control system fittings if found necessary.
(c) Servicing Modulating motor and its mechanical linkages.
(d) Check the movement of air damper with Modulation Motor.
(e) Do the setting of air & fuel as per requirement.
(f) Check the performance of the modulation on boiler for its operation.
Fitment of Inner Jacket Cover (Top)
(a) Remove Burner Assembly from Boiler.
(b) Dismantle all accessories fitted on the top cover of box.
(c) Dismantle top cover.
(d) Apply shellac compound and fit the Inner jacket cover.
Refractory casting Bottom Plate
(a) Dismantling of burner assembly with its fuel & air piping.
(b) Dismantle all accessories fitted on the top cover of boiler of Steam line /water line etc.
(c) Dismantling of Top cover, coil and top plate.
(d) Repairing of existing Refractory.
(e) Cleaning the bottom surface of the coil.
(f) Casting of Refractory cement where ever required / Insulate as per the EBPL refractory casting procedure.
(g) Normal air drying of the refractory.
(g) Inspection of the Cured refractory.
(h) Mounting burner assembly & steam & water pipe lines & making boiler ready for firing.
(j) Firing the boiler in Low Flame intermittently to ensure slow curing/Moisture removal of the Refractory.
Cleaning Fuel Gas Outlet Duct
(a) Removal of lagging up to 2 meters.
(b) Dismantling of ducts from Outer Jacket.
(c) Cleaning of ducts by wire brush.
(d) Cleaning of ducts by diesel.
(e) Cleaning of ducts by compressed air.
(f) Replaced damaged fastener with new fastener.
(g)Replace new gasket.
(h) Fitting of the duct on to its position.
Replacement of only blower motor (without impeller balancing)
(a) Disassemble the fan with air duct, casting, suction damper & impeller.
(b) Disassemble the impeller from motor.
(c) Disconnect the motor from base plate.
(d) Replace new motor with old one.
(e) Assemble the motor on the base frame.
(f) Assemble the impeller to the motor.
hydraulic testing of coil by opening of boiler top plate to check for leakage
SPARES
Globe Valve (GLV) A 105
Globe Valve (GLV) A 105 - FLANGE
Globe Valve (GLV) A 105 - FLANGE
Non-Return Valve (NRV) A 105
Non-Return Valve (NRV) A 105
Pr. Reducing Valve (PRV) A234 WPB
Pr. Reducing Valve (PRV) A234 WPB
Safety Valve (SV) A234 WPB
Safety Valve (SV) A234 WPB
Safety Valve (SV) A234 WPB
Safety Valve (SV) A234 WPB
Safety Valve (SV) A234 WPB
Safety Valve (SV) A234 WPB
Motor (M)
Motor (M)
Pressure Switch (PS)
Pressure Switch (PS
Pressure Transmitter (PT)
Pressure Transmitter (PT)
Steam Trap (FT)
Steam Trap (FT)
Steam Trap (TD)
Steam Trap (TD)
Steam Trap (TD)
Steam Trap (TD)
Steam Trap (TD)
Water Flow Meter (OM)
Water Flow Meter (OM)
Oil Flow Meter (OM)
Oil Flow Meter (OM)
Smoke Pump(SM)
Smoke Pump (SM)
Steam Flow Transmitter (SFT)
Steam Flow Transmitter (SFT)
Variable Freq. Drive (VFD)
Variable Freq. Drive (VFD)
Water Pump (P) 1200Lph/130MWC
Water Pump (P) 1200Lph/130MWC
Burner (B 1)
Burner (B 1)
Oil Pump (TA 2C4010 6W)
Oil Pump (TA 2C4010 6W)
Limit Switch (LS)
Limit Switch (LS)
Thermocouple RTD PT 100
Thermocouple RTD PT 100
Pressure Gauge
Weighing Scale
Temperature Indicator
Control Panel
Feed Water Pump Coupling
Non-Return Valve Assembly
Oil Seal
_Pump Packing Set
Gland Washer
Piston
Piston Ring
Valve Packing Set
Feed Pump Motor Bearing
Sequence Controller
Photo Resistor
Ignition Cable with Plug
Ignition Transformer
Ignition Electrode
Solenoid Valve
Solenoid Valve
Solenoid Valve Coil
Fuel Oil Filter Packing Ring
Burner Filter
Boiler coil
contractor
Blower Impeller
Servo Motor
Safety valves Spring
Electrical Panel Spares
switch fuse unit
HRC Fuse
Motor Protection
Push Button Green
Led Lamp
Push Button Red
HRC Fuse
HRC Fuse
contactor relay
Terminals with inbuilt relay
CHARGES FOR 2ND YEAR
SERVICE CHARGES
Chemical Internal cleaning if Required of coil includes activity form
(a) Prepare Boiler and systems for pre-chemical internal cleaning if required.+C9:C18CC9:C23
(b) Connect the chemical circulation pump to coil inlet.
(c) Connect flexible hose pipe to coil outlet for recirculation of chemical
(d) Arrangement of fresh water transfer to temporary tank.
(e) Addition& mixing of chemical in Tank.
(f) Start the Chemical Circulation with Temporary pump.
(g) Circulate the chemical & observe the water level in tank.
(h)Once the chemical cleaning is over flush the coil with Alkaline chemical to neutralize the water in coil.
(j) Drain the water from Coil & fill with fresh feed water.
(k) Install the inner jacket cover with its proper packing.
(l) Install the top cover of the boiler with its proper packing & mounting accessories.
(m) Reconnect the Boiler water feed pump again with new gaskets.
(n) Install the Burner again on to top plate with packing.
(p) Connect the Fuel piping, air atomization piping, electrode cables etc.
(q) Take trial for air/fuel Leakages.
Cleaning of Boiler by Water Washing (Coil/Jacket/Inner Jacket) Includes activity from.
(a) Disconnect the Burner, oil line, Electrode cables.
(b) Remove the Burner from Top plate.
(c) Remove Boiler top cover with its packing & top accessories.
(d) Remove Inner Jacket Cover & its packing.
(e) Prepare the boiler for its external cleaning.
(f) Once the access to the helical coil is made clean soot deposits accumulated in bottom part of the boiler by water washing and ensure furnace drain is clear.
(g) Examine accessible areas of coils, shells and boiler insulation refractory work for soot deposits, corrosion/Wastage and defect, or damages observed except refractory work by changing all the gaskets/packing & hardware.
(h) Clean the coil inner surface by wire brush.
(j) Again, clean the coil with water.
(k) Install the burner with oil line,electrodes& solenoid valve connection done & make the burner ready for firing.
(l) Box-up boiler and dry out boiler/refractory by firing the boiler in low fire gradually.
Servicing of Combustion Equipment
(a) Burner removal with oil hoses, airline& electrode removal.
(b) Assessment of air/fuel hose pipe condition/dismantling & assembly.
(c) Burner plate removal from top plate.
(d) Diffuser plate removal, cleaning & assembly.
(e) Photocell removal & its viewing port cleaning.
(f) Burner gasket replacement
(g) Check the photocell.
(h) Checking of electrodes, cleaning the same, Checking of sparking testing.
(j) Nozzle dismantling /cleaning /reassembly.
(k) Electrode removal /Cleaning, examine electrodes tips, firmly secured in the porcelain &their caps, installation & its setting.
(l) Electrode cap removal/cleaning.
(m) Fuel solenoid valve dismantling /Seat +diaphragm check & assembly.
(n) Sight glass (viewing) removal & cleaning.
Overhaul of Feed Pump and Associated Fitting
(a) Clean and examine feed pump suction strainer. Replace the sealing gasket if found damaged.
(b) Remove Pump front Valve Block & inspect cup Washers in suction Discharge port with NRV mechanism.
(c) Replace the Washers, NRV assembly if found damaged with new one & reassemble the pump.
(d) Overhauling of feed pump relief valve. Examine all parts of the valves & lap it if necessary. If the seat is damaged beyond repair replace the Valve with new one.
(e) Examine holding down arrangement of feed pump and its motor. Tighten foundation bolts as necessary.
(f) Check tension and alignment of feed pump belts and adjust as required. Check alignment of pump & motor pulley. Check for key way.
(g) Check the Flange joints of pump suction & discharges. Replace in necessary.
(h) Check the Flange hardware & replace if necessary.
(j) Apply grease to moving part as required.
Overhaul of FD fan (Blower)
(a) For Bearing greasing disconnect motor, remove fan from motor & do greasing.
(b) Fan motor terminal replacement.
(c) Fan leveling & foundation bolt tightening.
(d) Disassemble the fan with air duct, casing suction damper & Impeller. Assembly of Fan with leveling.
(e) Fan air sealing arrangement overhauling.
(f) Fan casing hardware replacement.
(g) Fan suction damper removal& it’s overhauling.
(h) Fan suction air duct removal & suction air control damper replacement if necessary.
(j)Fan foundation frame change with its hardware if necessary.
Overhaul of Fuel Oil Pump
(a) Dismantle fuel oil pump with its inlet & outlet fuel piping removal from base frame.
(b) Dismantle pump internals like Pressure regulating mechanism, Cleaning of the pump internals & reassembly.
(c) Removal of pump from base frame removal of coupling & pump mechanical seal assembly. If found leaking, replace with new one. Assemble the pump with motor & its alignment.
(d) If Fuel pump is not developing pressure, then dismantle it form base frame.
(e) Remove the coupling, replace it with new &reassembly of the pump & motor with alignment.
Overhaul of Safety Valves
(a) Check working of both safety valves with boiler pressure set at 10kg/cm2 as per the procedure in boiler manual.
(b) Open the valves from the Steam Header with inlet & discharge line opened if found leaking.
(c) Check the discharge pipe condition & replace if the pipe line is corroded.
(d) Dismantling of the valve & accessing the condition of the Blow down ring Valve seat assembly. Lap the seat if seat is leaking & reassemble the valve after complete overhaul.
(e) Fixing of valve on to steam header with New gasket &hardware set. Connect discharge pip line with new gasket
(f) Check the operation of the valve again on boiler & set the valves if required.
(g) Lock the safety valve setting.
Overhaul of various valves
(a) Remove the Gland nut of the valve which are leaking & assess the condition of the gland. Remove the Gland & replace it with gland rope & assemble the valve again.
(b) Remove the valve from the Piping if the Leakage through the seat is observed. Dismantle the valve & check the valve seat. If the valve seat is suitable for lapping, lap the valve & assemble it back.
(c) If the valve is leaking & not possible to lap or damage is
(d) economically non-repairable, replace with new one.
(e) Re-install valves on boiler systems.
Servicing of Boiler Safety Devices/ Systems
(a) Check performance of boiler safety device one by one as per its application.
(b) Check the setting of each safety device w r t its design /operating parameters.
(c) Set the safety device one by one as per the design / operating parameters.
(d) Replace the safety device which is found not working. (No repair will be carried out on Safety equipment except Safety Valves).
(e) Undertake post-repair/ overhaul adjustment/turning of safety device/systems as required.
(f) Function test of Sequence Controller & Photo Cell.
Servicing of Boiler Control System
(a) Check performance of boiler control system. In both auto and manual modes of boiler operation.
(b) Undertake Overhaul of defective control system fittings if found necessary.
(c) Servicing Modulating motor and its mechanical linkages.
(d) Check the movement of air damper with Modulation Motor.
(e) Do the setting of air & fuel as per requirement.
(f) Check the performance of the modulation on boiler for its operation.
Fitment of Inner Jacket Cover (Top)
(a) Remove Burner Assembly from Boiler.
(b) Dismantle all accessories fitted on the top cover of box.
(c) Dismantle top cover.
(d) Apply shellac compound and fit the Inner jacket cover.
Refractory casting Bottom Plate
(a) Dismantling of burner assembly with its fuel & air piping.
(b) Dismantle all accessories fitted on the top cover of boiler of Steam line /water line etc.
(c) Dismantling of Top cover, coil and top plate.
(d) Repairing of existing Refractory.
(e) Cleaning the bottom surface of the coil.
(f) Casting of Refractory cement where ever required / Insulate as per the EBPL refractory casting procedure.
(g) Normal air drying of the refractory.
(g) Inspection of the Cured refractory.
(h) Mounting burner assembly & steam & water pipe lines & making boiler ready for firing.
(j) Firing the boiler in Low Flame intermittently to ensure slow curing/Moisture removal of the Refractory.
Cleaning Fuel Gas Outlet Duct
(a) Removal of lagging up to 2 meters.
(b) Dismantling of ducts from Outer Jacket.
(c) Cleaning of ducts by wire brush.
(d) Cleaning of ducts by diesel.
(e) Cleaning of ducts by compressed air.
(f) Replaced damaged fastener with new fastener.
(g)Replace new gasket.
(h) Fitting of the duct on to its position.
Replacement of only blower motor (without impeller balancing)
(a) Disassemble the fan with air duct, casting, suction damper & impeller.
(b) Disassemble the impeller from motor.
(c) Disconnect the motor from base plate.
(d) Replace new motor with old one.
(e) Assemble the motor on the base frame.
(f) Assemble the impeller to the motor.
hydraulic testing of coil by opening of boiler top plate to check for leakage
SPARES
Globe Valve (GLV) A 105
Globe Valve (GLV) A 105 - FLANGE
Globe Valve (GLV) A 105 - FLANGE
Non-Return Valve (NRV) A 105
Non-Return Valve (NRV) A 105
Pr. Reducing Valve (PRV) A234 WPB
Pr. Reducing Valve (PRV) A234 WPB
Safety Valve (SV) A234 WPB
Safety Valve (SV) A234 WPB
Safety Valve (SV) A234 WPB
Safety Valve (SV) A234 WPB
Safety Valve (SV) A234 WPB
Safety Valve (SV) A234 WPB
Motor (M)
Motor (M)
Pressure Switch (PS)
Pressure Switch (PS
Pressure Transmitter (PT)
Pressure Transmitter (PT)
Steam Trap (FT)
Steam Trap (FT)
Steam Trap (TD)
Steam Trap (TD)
Steam Trap (TD)
Steam Trap (TD)
Steam Trap (TD)
Water Flow Meter (OM)
Water Flow Meter (OM)
Oil Flow Meter (OM)
Oil Flow Meter (OM)
Smoke Pump(SM)
Smoke Pump (SM)
Steam Flow Transmitter (SFT)
Steam Flow Transmitter (SFT)
Variable Freq. Drive (VFD)
Variable Freq. Drive (VFD)
Water Pump (P) 1200Lph/130MWC
Water Pump (P) 1200Lph/130MWC
Burner (B 1)
Burner (B 1)
Oil Pump (TA 2C4010 6W)
Oil Pump (TA 2C4010 6W)
Limit Switch (LS)
Limit Switch (LS)
Thermocouple RTD PT 100
Thermocouple RTD PT 100
Pressure Gauge
Weighing Scale
Temperature Indicator
Control Panel
Feed Water Pump Coupling
Non-Return Valve Assembly
Oil Seal
_Pump Packing Set
Gland Washer
Piston
Piston Ring
Valve Packing Set
Feed Pump Motor Bearing
Sequence Controller
Photo Resistor
Ignition Cable with Plug
Ignition Transformer
Ignition Electrode
Solenoid Valve
Solenoid Valve
Solenoid Valve Coil
Fuel Oil Filter Packing Ring
Burner Filter
Boiler coil
contractor
Blower Impeller
Servo Motor
Safety valves Spring
Electrical Panel Spares
switch fuse unit
HRC Fuse
Motor Protection
Push Button Green
Led Lamp
Push Button Red
HRC Fuse
HRC Fuse
contactor relay
Terminals with inbuilt relay
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.09 MB
TENDERENQUIRY.pdf
Tender Documents • 0.15 MB
BOQ_477791.xls
BOQ • 0.47 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .