| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.8 LAccepted-AOC | ₹5.8 L Quoted ₹5.9 L | L1 | Accepted-AOC L1 |
| 2 | L2₹7.9 L+₹2.1 L (35.7%)Rejected-AOC | ₹7.9 L+₹2.1 L (35.7%) | L2 | Rejected-AOC L2 |
Tender Value
₹5.9 L
EMD Value
₹14,700
Closing Date
17 Apr 2026, 4:00 pmClosed
Executive Engineer,PMU,Kottarakkara
PMU, Electrical Circle, Kottarakkara
HT line construction and Transformer installation work at Prakkulam Colony under Electrical Section Veliyam of Electrical Division, Kundara
2026_KSEB_848060_1
E TENDER/25-26/4153/100E /25.03.2026
Open Tender
Electrical Works
Percentage
90 days
Electrical Section Veliyam
Please refer Tender documents.
8 documents required · 8 mandatory
₹1,416
₹14,700
20 Jun 2026
31 Mar 2026
22 Apr 2026
31 Mar 2026
17 Apr 2026
31 Mar 2026
31 Mar 2026 - 17 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Fitting and providing one HT stay for 11kV pole, including digging and back filling pit in ordinary soil. | 20 | No | - | - |
| 2 | Transferring LT single phase 2/3 wire OH line to newly erected HT/LT pole including dismantling existing cross arm and insulators, refitting the same on the new pole, binding etc. complete. | 10 | No | - | - |
| 3 | Transferring LT single phase 4/5 wire OH line to newly erected HT/LT pole including dismantling existing cross arm and insulators, refitting the same on the new pole, binding etc. complete. | 25 | No | - | - |
| 4 | Disconnecting and lowering down the single phase WP service connection with guy wire from the OH line and reconnecting the same after completing the line work. | 95 | No | - | - |
| 5 | Dismantling one ordinary street light/CFL/LED fitting from existing pole and refitting the same on newly erected pole including disconnecting and reconnecting wires. | 20 | No | - | - |
| 6 | Disconnecting and lowering down the three phase WP service connection with guy wire from the OH line and reconnecting the same after completing the line work. | 5 | No | - | - |
| 7 | Additional rate for excavation of one Pit for HT Pole/HT Stay in Laterite. | 45 | No | - | - |
| 8 | Fitting and providing one strut using HT PSC pole including digging and back filling pit in ordinary soil. | 1 | No | - | - |
| 9 | Labour charges for loading HT PSC pole from the stacking place and unloading the same at work site (transportation by any vehicle) | 41 | No | - | - |
| 10 | Pole numbering using printed Aluminium sheets of 22 SWG having size 20 x 12 cm or painting the surface of line supports where numbers are to be inscribed, pole numbers shall be painted in circular / rectangular background, using approved quality anti algal yellow paint in two coat after scraping and cleaning the surface at a height of 2.5 metre above ground level. the numbers and letters should be in black synthetic enamel paint. The size of the number should be at least 2cm in height x 1.5 cm in width. including cost of paint. | 37 | No | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1433524.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.24 MB
Tenderdocuments.pdf
Tender Documents • 1.00 MB
BOQ_1433524.xls
BOQ • 0.38 MB
dateextensioncorrigendum100E3.pdf
PDF • 0.21 MB
Corrigendum100E.pdf
PDF • 0.27 MB
dateextensioncorrigendum100E.pdf
PDF • 0.21 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .