Loading…
Loading…
Tender Value
₹14.8 L
EMD Value
₹29,650
Closing Date
22 Jun 2026, 3:00 pmClosed
Executive Engineer, Div-III, AMC
O/O the Executive Engineer, Div-III, AMC
Construction of RCC drain from H.O Subir Dey to H.O Ratan Das at Gunjaria tilla, under ward No 37AMC.
2026_SAMC_73770_1
10/EE/Div-III/AMC/2026-27
Open Tender
Civil Works
Percentage
Under ward No 37 AMC.
Please refer Tender documents.
6 documents required · 6 mandatory
₹1,000
Yes
₹29,650
Yes
15 Jun 2026
15 Jun 2026
22 Jun 2026
15 Jun 2026
22 Jun 2026
15 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. -All kinds of soil | - | cum | 1 | - |
| 2 | Supplying and filling in plinth, under floor, foundations etc. with sand (fine) from local quarry with all lifts including spreading in horizontal layers, watering, grading to required slope, ramming, consolidating and compacting each layer by using plate compactor or by any suitable method complete. | - | cum | 1 | - |
| 3 | Providing and laying dry flat brick flooring in required pattern complete. | - | sqm | - | - |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering -All work upto plinth level: -1:3:6 ( 1 Cement: 3 fine sand : 6 graded well burnt brick aggregate 20 mm nominal size) | - | cum | - | - |
| 5 | First class brick work in foundation and plinth
including cost of all materials as required complete:-In cement mortar 1:4 ( 1 cement : 4 fine sand ). | 1 | cum | - | - |
| 6 | Half brick masonry work with first class bricks in
foundation and plinth including cost of all materials as required complete:-In cement mortar 1:4 ( 1 cement : 4 fine sand ). | - | sqm | 1 | - |
| 7 | 12 mm cement plaster of mix Cement mortar 1:4 (1 cement : 4 fine sand) Neat cement punning. | - | sqm | - | - |
| 8 | Providing and laying in position specified grade of
reinforced cement concrete excluding the cost of
centring, shuttering, finishing and reinforcement-
-All work upto plinth level: | - | cum | 1 | - |
| 9 | Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level.Thermo-Mechanically Treated bars of grade Fe-500D or
more | - | kg | - | - |
| 10 | Steel work welded in built up section/framed work
including cutting, hoisting, fixing in position and
applying a priming coat of approved steel primer using steel etc. complete as required:- In grating, frames, guard bar, railing, brackets, gates and
similar works, all complete. | - | kg | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.35 MB
DNIT.pdf
Tender Documents • 4.09 MB
BOQ_75076.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .