Loading…
Loading…
Tender ID
Tender Value
₹8.9 L
EMD Value
₹8,900
Closing Date
16 Mar 2026, 6:00 pmClosed
Executive Engineer, Panchayat (R & B) Division Rajkot.
Construction of Community hall near staff quarter of Primary School at Village Raydi. Tal.Jamkandorana Dist. Rajkot
282024
NIVIDA 41 2025-26
Open
Civil Works - Buildings
Works
Rajkot
7 documents required · 7 mandatory
₹900
Yes
Executive Engineer Panchayat R&B Division Rajkot
₹8,900
Yes
1 Mar 2026
1 Mar 2026
1 Mar 2026
16 Mar 2026
1 Mar 2026
Name of Work:- Construction of Community hall near staff quarter of Primary School at Village Raydi.
Tal.Jamkandorana Dist. Rajkot
Taluka:- Jamkandorana Rajkot
Bill of Quantity
Item Unit Tender Total Amount
Item Unit Tender Total Amount
No. Description of Item (with brief specification and reference to book of Quantity Figure according to
specifications) Estimated
1 Excavation for foundation up to 1.5 MDepth including sorting 13.10 Cum 164.82
out and stacking of useful materials and disposing of the
excavated stuff up to 50 meter lead (B) Dense or Hard soil
2 Excavation for foundation up to 1.5 MDepth including sorting 15.26 Cum 279.81
out and stacking of useful materials and disposing of the
excavated stuff up to 50 meter lead (C) Hard Murrum.
3 Providing and laying cement concrete 1:4:8 (1-cement : 4- 8.57 Cum 2940.90
coarse sand : 8-hand broken stone aggreate 40mm nominal
size) and curing complete excludnig cost of formwork in (A)
foundation and plinth
4 White Stone Bela mesonry block in course in superstructure 21.33 Cum 5082.46
with stone of approved quality in Lime Mortar 1:6 (1-Cement :
6- course sand) including packing the joints etc. complete.
5 Filling available excavated earth (excluding rock) in trenches. 28.36 Cum 137.47
plinth, sides of foundations etc. in layers not exceeding 20 cm.
in depth consolidating each disposited layer by ramming and
6 Providing and laying cement concrete work 1:2:4 (1- Cement : 6.00 Cum 4060.93
2- Coarse sand : 4- graded stone aggregates 20 mm nominal
size) and curing complete excluding cost of formwork and
reinforcement for reinforced concrete work in (A)
Foundations, footings, Base or columns and Mass concrete
7 Providing and laying ordinary cement concrete 1:2:4 (1- 2.70 Cum 10658.15
Cement 2- coarse sand : 4- graded stone aggregates 20 mm
nominal size) and finishing smooth with,curing etc. complete
including the cost of formwork but excluding the cost of
reinforcement for R.C.C work in (B) COLUMNS: (ii) Having
cross-sectional area more than
0.08 Sq.M and upto 0.18 Sq.M
8 Providing and laying ordinary cement concrete 1:2:4 (1- 0.98 Cum 10219.39
Cement 2- coarse sand : 4- graded stone aggregates 20 mm
nominal size) for R.C.C lintel including finishing smooth
with,curing etc. complete including the cost of formwork but
excluding the cost of reinforcement.
9 Providing and laying ordinary cement concrete 1:2:4 (1- 9.18 Cum 6578.06
Cement 2- coarse sand : 4- graded stone aggregates 20 mm
nominal size) and finishing smooth with,curing etc. complete
including the cost of formwork but excluding the cost of
reinforcement for R.C.C work in (A) BEAMS :(iii) Having
cross-sectional area more than 0.12Sq.M and upto 0.18 Sq.M
10 Providing and laying ordinary cement concrete 1:2:4 (1- 10.08 Cum 7454.03
Cement 2- coarse sand : 4- graded stone aggregates 20 mm
nominal size) exposed work with curing etc. complete
including the cost of formwork but excluding the cost of
reinforsement for R.C.C work in (iii) Slabs having more than
10 cm and upto 13 cm. thickness
11 Providing TMT Bar FE 500D reinforcement for R.C.C. work 2859.00 Kg 77.28
including bending, binding and placing in position complete
upto floor two level
Item Unit Tender Total Amount
Item Unit Tender Total Amount
No. Description of Item (with brief specification and reference to book of Quantity Figure according to
specifications) Estimated
12 Providing and fixing in position M.S.Angle 40mm x 40mm x 3.15 Sqmt 3082.19
6mm frame for doors of 25 x 25 x 5mm angle for shutter frame
and 16 gauge M.S. sheet welded to shutter frame and 6 mm
square bar for grill as per the approved drawing and design
and including 3 coats of oil paint including a prime coat of red
oxied paint and all necessary fitting, fixture locking
arragnement etc. complete
13 Providing and fixing in position M.S.Angle 35mm x 35mm x 16.20 Sqmt 3405.57
6mm frame for windows of 25 x 25 x 5mm angle for shutter
frame and 16 gauge M.S. sheet welded to shutter frame and
mm square bar for grill as per the approved drawing and
design and including 3 coats of oil paint including a prime coat
of red oxied paint and all necessary fitting, fixture locking
arragnement etc. complete
14 P & L 24" x 24" vitrified 8 mm thick tile flooring over 20 mm 74.50 Sqmt 1546.84
(average) base of cement mortar 1:6 ( 1 cement: 6 coarse sand)
on new surface or fixing on existing flooring by adhesive
material including dismentaling of existing flooring and
jointed with color cement slurry including finised with flush
pointing & cleaning the surface etc. complete for light shade
15 Providing 15mm thick cement plaster in single coat on Rough 89.33 Sqmt 168.87
(Similar)side of single or half brick walls for interior plastering
upto floor two level and finished even and smooth in (ii)
Cement mortar 1:4 (1-cement :4-sand)
16 Providing 20mm thick cement plaster in single coat on single 151.33 Sqmt 213.48
or half brick walls for interior plastering upto floor two level
and finished even and smooth in (ii) Cement mortar 1:4 (1-
cement :4-sand)
17 Providing 10mm thick cement plaster in single coat on 95.52 Sqmt 141.91
brick/concrete walls for interior plastering upto floor two level
and finished even and smooth in (i)Cement mortar 1:3 (1-
18 Providing and laying broken chine mosaic flooring for terrace 70.00 Sqmt 779.69
using 12 mm to 20 mm broken pieces of glazed tiles to be laid
over cement mortar 1:3 to plain or slope and to be tempered to
bring mortar creme out upto surface using white cement
including rounding off junctions and extending them upto
cm along the wall,clearing with water and oxalic acid etc. as
19 Wall painting (two coats) with plastic emulsion paint of 184.85 Sqmt 88.38
approved brand and manufacture on undecorated wall surface
to give an even shade including throughly brushing the surface
free from mortar droppings and other foreign matter and sand
papered smooth.
20 Finishing wall with water proofing cement paint of on wall 151.33 Sqmt 63.69
surfaces (Two coats) to give an approved brand and
manufacture and of required shape even shade after thoroughly
brushing the surface to remove all dirt and remains of loose
powered materials.
21 Providing and fixing Number plate of Marble plate stone of 1.00 No. 306.14
required size set in C.M. 1:4 including finishing and engeaving
letters etc. completes.
Rupees Eight Lakhs Eighty Five Thousand Four Hundred Eighty Nine & Paise Thirteen Only
Item Unit Tender Total Amount
Item Unit Tender Total Amount
No. Description of Item (with brief specification and reference to book of Quantity Figure according to
specifications) Estimated
I/we am / are willing to carry out the work at % above / below the estimated rates (percentage should be written in
words and figures % above / below) the estimated rates as mentioned above. Amount of My / Our tender works
1) Estimated amount put to Tender : Rs. 8,85,489.13 1) Estimated amount put to Tender : Rs.
2) Deduct % below Rs. . 2) Add % Above Rs. .
3) Net Amount of Tender Rs. . 3) Total Amount of Tender Rs.
3) Net Amount of Tender Rs. . 3) Total Amount of Tender Rs.
4) In words Rs. . 4) In words Rs.
* (Please strike out whichever is not applicable)
1) The Contractor shall exhibit a board with detailed specification and details of work as directed by the Engineer-In-Charge for which
no extra payment shall be made.
2) The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
3) GST and Income tax TDS will be deducted at a source while making payments of bills
4) In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt. G.R.: PRC-10/2017 Cement
Consumption/16/C, Date:11/05/2017 as stated in S.O.R. therefore in R.C.C. items where there is a change as per actual mix design the
cost of difference of cement consumption have been deducted from the rate of original item at the rate of input rate mentioned in all
Deputy Executive Engineer
R & B (P) Sub Division
Signature of the Executive Engineer :
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
0 SBD Community hall Raydi.pdf
Building Govt paper panchayat.pdf
CEMENT CONDITION.pdf
GR.pdf
INDEX.pdf
MATERIAL TEST.pdf
NIVIDA 41 2025-26.pdf
SCHEDULE B.pdf
Specification Community hall Raydi.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .