Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹26.8 LAccepted-AOC | ₹26.8 L Quoted ₹27.0 L | L1 | Accepted-AOC L1 Party |
| 2 | L2₹29.2 LRejected-Finance | ₹29.2 L | L2 | Rejected-Finance L2 Party |
| Sl No | Description | Qty | Unit | M ABDULSHUKKOOR L1 | KURIAN KOSHY L2 |
|---|---|---|---|---|---|
| 1.00Sludge clearing 1m wide | |||||
| 1.01 | Removing sludge/clearing vegetation/over growth from 1.00 m to 2.00m wide drainage manually /mechanically(Safety of plumbing line and electric cables should be ensured) and dispose them 500 m. lead as directed by Engineer-in-charge,including
machinery,all labours,tool,tackles,safety apparels
etc and clearing mouth of inlet to drainagel ensuring unhindered flow through canal | 30 | sqm | 50 ₹1,500 | 55 ₹1,650 |
| 2.00Earth work excavation | |||||
| 2.01 | Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 1 km.<br>All kinds of soil | 344.41 | cum | 400 ₹1.4 L | 470 ₹1.6 L |
| 3.00GSB | |||||
| 3.01 | Granular Sub-base with Well Graded Material (Table 400.1) <br> (A) By Mix in Place Method <br> Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. <br> (i) For Grading I Material | 38.45 | cum | 4,000 ₹1.5 L | 4,300 ₹1.7 L |
| 4.00shoring | |||||
| 4.01 | Open timbering in trenches including strutting and shoring complete (measurements to be taken of face area timbered):Depth not exceeding 1.5m | 211.57 | sqm | 200 ₹42,315 | 220 ₹46,546.50 |
| 5.00Centering and shuttering | |||||
| 5.01 | Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | 858.64 | sqm | 500 ₹4.3 L | 590 ₹5.1 L |
Tender Value
₹21.3 L
EMD Value
₹50,000
Closing Date
15 Mar 2025, 3:00 pmClosed
HOU(TP)
KMML,CHAVARA
Sludge clearing Earthwork excavation, GSB works,Centering and shuttering,shoring, Steel reinforcement works RCC works for drainage walls, precast drainage blocks and coverslabs, Carriage of precast drainage blocks and cover slabs from KMML
2025_KMML_743426_1
EAF/CIV/1113/2024-2025 Dtd.18/02/2025
Open Tender
Civil Works - Others
60 days
KMML, CHAVARA
Please refer Tender documents.
6 documents required · 6 mandatory
₹2,950
₹50,000
13 Apr 2026
1 Mar 2025
17 Mar 2025
1 Mar 2025
15 Mar 2025
1 Mar 2025
stage.html
html • 0.04 MB
technical_1198929.pdf
techsummary_1198929.pdf
finance_1198929.pdf
BOQ Comparative Chart
xlsx
finsummary_1198929.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.25 MB
BOQ_1198929.xls
BOQ • 0.27 MB
Apprvd.pdf
Other Document • 0.07 MB
td.pdf
Tender Documents • 7.34 MB
Download all tender documents and submit your bid