Loading
Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.8 LAccepted-AOC | ₹4.8 L | L1 | Accepted-AOC Lowest I |
| 2 | L2₹4.9 LRejected-Finance | ₹4.9 L | L2 | Rejected-Finance Lowest II |
| 3 | L3₹6.4 LRejected-Finance | ₹6.4 L | L3 | Rejected-Finance Lowest III |
| 4 | L4₹6.5 LRejected-Finance | ₹6.5 L | L4 | Rejected-Finance Lowest IV |
| 5 | Rejected-Technical | - | - | Rejected-Technical The date of self declaration on the affidavit is before inviting tender. |
| Sl No | Description | Qty | Unit | M/S AJAYPAL SINGH CONTRACTOR L2 | M/S UMA DEVI CONTRACTOR L4 | M/S MOHD RASHID CONTRACTOR L1 | M/S SUBHASH CHAND CONTRACTOR L3 |
|---|---|---|---|---|---|---|---|
| 1.00 | Earth work in Foundation in dry soil (Loam clay or sand) including lift up to 1.5 M and lead up to 30 m and including back filling, watering and ramming of excavated earth into the plinth with removal and disposal of surplus earth as directed by the Engineer-in-charge up to distance of 30 M from the foundation trenches. | 75 | Cum | 78 ₹5,850 | 46 ₹3,450 | 59.28 ₹4,446 | 75 ₹5,625 |
| 2.00 | Ordinary Centering & shuttering of Plywood or steel for RCC Work | 40 | Sqm | 650 ₹26,000 | 660 ₹26,400 | 632.53 ₹25,301.20 | 551 ₹22,040 |
| 3.00 | Laying C.C- 1:3:6 with cement, course sand and crushed Stone ballast 4mm to 20 & 20 mm to 40 mm (Graded). size mortar in foundation including cost of all material, labour,T&P etc. | 16.5 | Cum | 4,500 ₹74,250 | 5,041 ₹83,176.50 | 4,158.7 ₹68,618.55 | 5,011 ₹82,681.50 |
| 4.00 | Laying C.C- 1:2:4 using size 4-10 mm & 10-20mm graded crushed aggregate including all cost of material, labour , T&P etc. for completion of work per cum. | 33 | Sqm | 3,900 ₹1.3 L | 7,500 ₹2.5 L | 4,547.97 ₹1.5 L | 7,490 ₹2.5 L |
| 5.00 | Brick work (M-105 and Above) in 1:4 cement & sand mortar including cost of all Material, Labour, T&P etc complete. (Per Cum) | 37 | Cum | 4,200 ₹1.6 L | 5,171 ₹1.9 L | 4,024.84 ₹1.5 L | 5,121 ₹1.9 L |
| 6.00 | Laying C.C 1:1:2 using size 4-20 mm graded crushed aggregate including all cost of material, labour , T&P & Mechanical Mixing etc. for completion of work (per cum.) | 1.9 | Cum | 7,943 ₹15,091.70 | 7,605 ₹14,449.50 | 5,865.91 ₹11,145.23 | 7,590 ₹14,421 |
| 7.00 | Cement Pointing (Struck deep) in 1:2 C:M on brick masonry i/c cost of all material, labour, T&P etc complete (Per SqM) | 94 | Sqm | 119 ₹11,186 | 95 ₹8,930 | 92.9 ₹8,732.60 | 99 ₹9,306 |
| 8.00 | Laying first class dry brick pitching with 1:3 C:M i/c all cost of labour, material and T&P per cum | 9.5 | Cum | 5,500 ₹52,250 | 5,400 ₹51,300 | 4,449.52 ₹42,270.44 | 5,310 ₹50,445 |
| 9.00 | Supplying and Placing graded Filter in Layers i/c Cost of all Material, Labour and T&P, all lift and lead etc for proper completion of work. | 10 | Cum | 2,238 ₹22,380 | 1,950 ₹19,500 | 1,657.17 ₹16,571.70 | 1,925 ₹19,250 |
| 10.00 | Letter writing with 10cm height with all cost of labour and material | 15 | Nos | 13 ₹195 | 20 ₹300 | 9.53 ₹142.95 | 15 ₹225 |
Tender Value
₹6.5 L
EMD Value
₹13,000
Closing Date
6 Oct 2025, 12:00 pmClosed
Executive Engineer
EGCCD 6 Najibabad
Construction of Tail fall at Jamalpur Dy.
2025_UPIDC_1078202_16
01/EE/2025-26
Open Tender
Civil Works - Canal
90 days
Najibabad
Please refer tender documents
2 documents required · 2 mandatory
₹225
₹13,000
31 Jan 2026
29 Sept 2025
6 Oct 2025
29 Sept 2025
6 Oct 2025
29 Sept 2025
29 Sept 2025 - 6 Oct 2025
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid