Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹54.4 LAccepted-AOC | L1 | Accepted-AOC Being lowest bonafide bid and reasonable | |
| 2 | L2₹55.8 L+₹1.4 L (2.56%)Rejected-Finance 244 22 ONKAR NAGAR B TRI NAGAR TRI NAGAR NEW DELHI 110035 NORTH WEST DELHI DELHI 110035 INDIA | NORTH WEST DELHI | DELHI | 110035 | L2 | Rejected-Finance Being not lowest | |
| 3 | L3₹58.1 L+₹3.7 L (6.85%)Rejected-Finance 44B CIRCULAR GARDEN REACH ROAD KOLKATA 700 023 | KOLKATA | WEST BENGAL | 700023 | L3 | Rejected-Finance Being not lowest | |
| 4 | NB₹50.3 LRejected-Finance | NB | Rejected-Finance Declared non bonafide bid due to overall quoted amount is less than overall minimum wages calculation i.e RS 53,69,705/-including statuary provision as mentioned in Sch A notes of tender document | |
| 5 | Rejected-Technical | - | Rejected-Technical As mention in Technical Evaluation Report |
Tender Value
Refer Docs
EMD Value
₹1.2 L
Closing Date
30 Nov 2020, 9:00 amClosed
CWE KOLKATA
HQ Commander Works Engineers Military Engineer Services National Library Avenue Alipore, Kolkata - 700 027
OUTSOURCING SERVICES FOR OPERATION OF VARIOUS SUB-STATION INSTALLATIONS AT CH ,PARK VIEW, MAP (PH-I _ II) AND II LINE AREA UNDER GE(A) KOLKATA
2020_MES_391571_1
8077/E8(E-22)/20-21
Open Tender
Miscellaneous Services
Item Rate
334 days
Kolkata-27
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,000
Yes
GE (A) KOLKATA
₹1.2 L
Yes
23 Dec 2020
2 Nov 2020
2 Dec 2020
2 Nov 2020
30 Nov 2020
17 Nov 2020
2 Nov 2020 - 9 Nov 2020
Amount
NOTE :The bidders/contractors are advised to read tender document & all corrigendum/ amendments and General conditions of contracts before entry/quoting the rates. In case the overall quoted rates are less than to the overall minimum wages as mention in SCh 'A' notes and such quoted bid shall be consider as a non-bonafide bids and same shall be rejected during financial evaluation. The tenderers should keep in mind while quoting their offer. However contractor/bidder shall not be entitled to any compensation whatsoever for rejection of financial bids.
Outsourcing of electrician services (Skilled) for operation of various type sub station including all equipment/machinery etc one shift per day per month including reliever on Sundays & holidays for day to day operation of group of following E/M installations in various sub station at CH(EC) & II Line area as per direction of Engg-in-Charge’s/GE and daily maintenance of sub station area and daily maintenance of necessary records & documents all as specified here-in-after:- Qty- 01 no Electrician x 02 shifts ( Morning shift & Evening Shift) x 05 Nos sub station) x11 Month = 110 Each calendar month per 08 hours service(per shift).
Wages including Variable Dearness Allowance
EPF Contribution liability of employer
ESIC Contribution of employer
Bonus Contribution of employer
Labous Welfare cess
Contractors overhead & profit
Outsourcing of Mate Electrician services (Semi Skilled) for operation of various type sub station including all equipment/machinery etc one shift per day per month including reliever on Sundays & holidays for day to day operation of group of following E/M installations in various sub station at CH(EC) & II Line area as per direction of Engg-in-Charge’s/GE and daily maintenance of sub station area and daily maintenance of necessary records & documents all as specified here-in-after:- Qty- 01 no Mate Electrician x 01 shifts (Night Shift) x 05 Nos Sub Station) x11 Month =55 Each calendar month per 08 hours service(per shift).
Wages including Variable Dearness Allowance
EPF Contribution of employer
ESIC Contribution of employer
Bonus Contribution of employer
Labous Welfare cess
Contractors overhead & profit
Note for item no 2 &3(including sub items): Details of tentative Group of Installations / Pump House /DG Sets:- (A)Morning & Evening Shift:-(a)Main Receiving Sub Station No-01(TOP-1), (b) Basement Sub Station No-01(Hospital),(c) Main Receiving Sub Station No-02(MAP Phase-I) and (d) Sub Station MAP Phase-II, (e) Diff Tech Sub station (B) Night Shift:(a)Main Receiving Sub Station No-01(TOP-1), (b) Basement Sub Station No-01(Hospital),(c) Main Receiving Sub Station No-02(MAP Phase-I) and (d) Sub Station MAP Phase-II(e) Diff Tech Sub station Note:-A normal all above Group of Installations / Sub Station shall be operated in three shift per day. However, GE/Engg-in-Charge at his discretion may change the Group of Installations / Pump House /DG Sets as per requirements at site.
Notes for item no 2 to 3.08:- (a) Amount of bonus is payable only after submission of valid and authentic document in support of having paid the requisite amount of bonus to the workmen, i.e proof of account payment. Similarly items/sub-items of ‘contribution towards EPF’ and ‘contribution towards ESIC’ shall also be payable after submission of valid & authentic document in support of proof of payment. (b) Irrespective of quoted rate against wage here-in-above , the tenderer/bidder shall be liable to pay unit quoted wage or minimum wages (as mention in Sch ‘A’note) whichever is higher to employee. Similarly the tenderer/bidder shall be liable to deposite/pay employer contribution towards EPF , employer contribution towards ESIC, Bonus quoted rate or liable amount as per Govt notification whichever is higher.
(c) DUTY TIME :- A normal working time of 08 hour shift as mentioned in PS. However, GE/Engg-in-Charge at his discretion may change the shift timings as per requirements and 1 shift or 2 shift installation may be late-night hours. The shift of 08 hours shall be continuous. The quoted rate shall be deemed to take into account such situations. (d) Operator will take all preventive measures as per code of practise of EI Rules as well as they should be insured for accident as per labour laws. The Department will not be responsible for any type of incident. (e) All the safety equipments and tools related to workmanship shall be provided by contractor without any extra cost. Contractor shall be provide T & P such as (Pipe wrench, pliers, line tester, test lamp, clamp meter) two set of uniforms to every operator, one No first aid box, cotton waste, wipping cloths to each installation under contract schedule, required log sheets of pumping sets and DG sets of all installations and sweeping instruments and the cost thereof deemed to be included in above quoted rate. (f) Electrician& Mate Electrician shall be Skilled & Semi Skilled respectively. (g) The term & condition as specified in Sch 'A' Note & PS of tender document. Accordingly bidder should quoting their offer. (h) Unit rate shall be quoted one Electrician Mate/Electrician per 08 hour service per Day for one calendar month. (i)The operator should have own conveyance and communication system like mobile etc.
UNIVERSAL
NIRMAL SALES CORPORATION
INDIA ELECTRICAL EQUIPMENTS
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .