Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 LAccepted-AOC | L1 | Accepted-AOC Committee approved rates as L1 | |
| 2 | L2₹1.6 L+₹5,070 (3.27%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | L3₹1.6 L+₹8,140 (5.25%)Rejected-AOC | L3 | Rejected-AOC L3 |
Tender Value
Refer Docs
EMD Value
₹1,600
Closing Date
22 Apr 2021, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE EUDC BAREILLY
35-B RAMPUR GARDEN BAREILLY
Work of Erection of PCC Pole Laying and sagging of A.B Conductor Under Various Places of 33/11 KV S/s Parsakhera ( Avadh Dham Colony Basant Vihar Colony ) 33/11 KV S/s Quila ( Kaali Dhaam Colony) Under EUDD-III, Bareilly Under Business
2021_MVVNL_582068_1
T-05/EUDCB/2021-22
Open Tender
Electrical Works
Item Rate
30 days
EE EUDD-II BAREILLY
AS PER TENDER FORM
3 documents required · 3 mandatory
₹1,180
SE EUDC
₹1,600
23 Jun 2021
13 Apr 2021
23 Apr 2021
13 Apr 2021
22 Apr 2021
13 Apr 2021
120 days
Amount
Work of Erection of PCC Pole & Laying and sagging of A.B Conductor Under Various Places of 33/11 KV S/s Parsakhera ( Avadh Dham Colony &Basant Vihar Colony ) & 33/11 KV S/s Quila ( Kaali Dhaam Colony) Under EUDD-III, Bareilly Under Business Plan 2020-21( Against Linkage Latter No.257/Technical/MVVNL/E-1/Business Plan-2020-21).
Safe Carriage of materials from Central C.B. Ganj to work site including loading & unloading. a- PCC Pole 8.5 Mtr. Long – 33 nos. b AB Cable 3X120 Sqmm. -1660 Mtr. c- 3-Phase Distribution Box-28 No. c- Stay set Complete (16x18mm)-16 No. d- Other Line materials- 2500 Kgs.
Erection of PCC Pole including digging of pit & grouting work complete and fitting of all accessories complete.
Erection of Stay set complete as per RESPO norms
Laying & Sagging of AB Conductor (3x120 sqmm.)
Erection and commissioning of 03 phase distribution boxes (14 nos. connection per box) as per relevant ISS on the L.T Poles including connection of DB box with LT mains .
Fixing of associated Items i.e Dead end clamp – 24 nos, PCC Pole Clamp – 40 Nos., I hook – 45 Nos. Etc. .
Qazi contractor and suppliers
Khare Enterprises,
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .