Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹9.8 LAccepted-AOC NARIKULAM HOUSE KANJOOR KANJOOR ERNAKULAM DISTRICT | KANJOOR | ERNAKULAM | KERALA | ₹9.8 L | 1 | Accepted-AOC BEING L1 BIDDER. ACCEPTED. |
| 2 | 2₹10.4 LRejected-AOC | ₹10.4 L | 2 | Rejected-AOC BEING L2 BIDDER.REJECETD |
| Sl No | Description | Qty | Unit | C P ABOOBACKER L2 | DAISY JOSE L1 |
|---|---|---|---|---|---|
| 1.00Rectification works of canal | |||||
| 1.00 | 15.2.2:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:4:8 or leaner mix ( including equivalent design mix) | 16.14 | cum | 1,266.86 ₹20,447.12 | 1,196.91 ₹19,318.13 |
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 75.97 | cum | 209.97 ₹15,952.47 | 198.38 ₹15,071.92 |
| 1.00 | 2.33.2:Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyound 60 cm girth up to and including 120 cm girth | 3 | each | 2,000.27 ₹6,000.81 | 1,889.83 ₹5,669.49 |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 43.35 | cum | 6,465.31 ₹2.8 L | 6,108.33 ₹2.6 L |
| 1.00 | 4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | 467.6 | sqm | 314.72 ₹1.5 L | 297.34 ₹1.4 L |
| 1.01 | 4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) | 58.45 | cum | 6,983.85 ₹4.1 L | 6,598.24 ₹3.9 L |
| 1.01 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 9.4 | cum | 7,527.32 ₹70,794.44 | 7,111.7 ₹66,885.54 |
| 1.01 | 13.16.1:6 mm cement plaster of mix:1:3 ( 1 cement : 3 fine sand) | 334.4 | sqm | 258.6 ₹86,475.84 | 244.33 ₹81,703.95 |
Tender Value
₹12.7 L
EMD Value
₹31,758
Closing Date
12 Mar 2026, 12:35 pmClosed
Assistant Execuitive Engineer
Assistant Execuitive Engineer MINOR IRRIGATION SUBDIVISION ALUVA
Rectification work
2026_Irrig_845434_1
IRR/IA/TR/6445/2025_5_1_1/1
Open Tender
Civil Works - Lift Irrigation Schemes
240 days
Aluva
PLEASE REFER TENDER DOCUMENTS
10 documents required · 10 mandatory
₹2,760
Yes
₹31,758
Yes
18 May 2026
9 Mar 2026
13 Mar 2026
9 Mar 2026
12 Mar 2026
9 Mar 2026
9 Mar 2026 - 12 Mar 2026
Rectification works of canal
15.2.2:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:4:8 or leaner mix ( including equivalent design mix)
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil
2.33.2:Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyound 60 cm girth up to and including 120 cm girth
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources)
4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources)
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources)
13.16.1:6 mm cement plaster of mix:1:3 ( 1 cement : 3 fine sand)
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1427945.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.06 MB
viewsbd.pdf
Tender Documents • 3.32 MB
BOQ_1427945.xls
BOQ • 0.30 MB
PAY.pdf
Tender Documents • 0.04 MB
Preliminaryagmt.pdf
Tender Documents • 0.06 MB
Download all tender documents and submit your bid